ML052500242

From kanterella
Revision as of 15:49, 8 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Technical Specifications, Revises the TSs in Response to an Application Requesting a One-Time Extension of the Surveillance Interval for the Reactor Vessel Internal Vent Valves
ML052500242
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/06/2005
From: Macon W
NRC/NRR/DLPM/LPD3
To: Bezilla M
FirstEnergy Nuclear Operating Co
Macon W, NRR/DLPM,415-3965
References
TAC MC6955
Download: ML052500242 (1)


Text

REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued)

b. Each internals vent valve shall be demonstrated OPERABLE at least once per 24 months* during shutdown by: I
1. Verifying through visual inspection that the valve body and valve disc exhibit no abnormal degradation,
2. Verifying the valve is not stuck in an open position, and
3. Verifying through manual actuation that the valve is fully open when a force of

< 400 lbs. is applied vertically upward.

  • An exception applies for the interval following the March 2003 verification completed during the Thirteenth Refueling Outage. Under this exception, the next performance of this surveillance requirement may be delayed until March 25, 2006.

DAVIS-BESSE, UNIT I 3/4 4-3 1 Amendment No. 23, 95, 165,268