ML052500589

From kanterella
Revision as of 14:25, 8 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Semiannual 10 CFR 26 Fitness for Duty Program Data
ML052500589
Person / Time
Site: Harris, Brunswick, Crystal River, Robinson  Duke Energy icon.png
Issue date: 08/29/2005
From: Burton C
Progress Energy Carolinas, Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PE&RAS-05-063
Download: ML052500589 (13)


Text

10 CFR 26.71 (d)

Progress Energy PO Box 1551 411 Fayetteville Street Mall Raleigh NC 27602 Serial: PE&RAS-05-063 August 29, 2005 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 / LICENSE NOS. DPR-71 AND DPR-62 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / LICENSE NO. DPR-23 SEMIANNUAL 10 CFR 26 FITNESS FOR DUTY PROGRAM DATA Ladies and Gentlemen:

Pursuant to 10 CFR 26.71(d), enclosed is the semiannual Fitness For Duty (FFD) Program performance data for the above listed plants belonging to Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc. (PEC), and Florida Power Corporation, now doing business as Progress Energy Florida, Inc. (PEF).

The enclosed report provides FFD Program performance data for personnel subject to the requirements of 10 CFR 26, for the period January 1, 2005 through June 30, 2005.

This document contains no new regulatory commitment.

Please contact me at (919) 546-6901 if you need additional information concerning this report.

Sincerely, Chris Burton Manager - Performance Evaluation & Regulatory Affairs HAS Enclosure c: W. D. Travers, Regional Administrator - Region II USNRC Resident Inspector - BSEP, Unit Nos. 1 and 2 USNRC Resident Inspector - CR3 USNRC Resident Inspector - SHNPP, Unit No. 1 USNRC Resident Inspector - HBRSEP, Unit No. 2 B. L. Mozafari, NRR Project Manager - BSEP, Unit Nos. I and 2; CR3 C. P. Patel, NRR Project Manager - SHNPP, Unit No. 1; HBRSEP, Unit No. 2 J. A. Sanford - North Carolina Utilities Commission G. Thigpen - North Carolina Utilities Commission S. Watson - North Carolina Utilities Commission B. Hall - North Carolina Department of Environmental and Natural Resources

PE&RAS-05-063 Page 1 of 12 Enclosure Fitness For Duty Program (January 1, 2005 - June 30, 2005)

PERFORMANCE DATA

PE&RAS-05-063 Page 2 of 12 Enclosure

SUMMARY

OF MANAGEMENT ACTIONS Lessons Learned and Actions Taken None.

PE&RAS-05-063 Page 3 of 12 Enclosure EFFECTIVENESS EVALUATION Fitness For Duty Program Performance Data Random testing is required to be performed at an annual rate of at least 50% of the workforce in accordance with 10 CFR 26.24(a)(2). The current six month reporting period random testing rates were approximately 28.6% for Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., (PEC) and 25% for Florida Power Corporation, now doing business as Progress Energy Florida, Inc., (PEP). For PEC (i.e., the Brunswick, Harris, and Robinson plants), there were 895 random tests conducted with an average of 3130 workers eligible for testing. For PEF (i.e., the Crystal River 3 plant), there were 198 random tests conducted with an average of 793 workers eligible for testing.

For this reporting period, the total rate of positive test results for PEC was approximately 0.52%.

Out of 2310 tests, there were 12 positive results, comprising 7 pre-access, 2 random, 1 for-cause, and 2 other. For this reporting period, the total rate of positive test results for PEP was approximately 0.54%. Out of 369 tests, there were 2 positive results comprising 2 pre-access, 0 random, 0 for-cause, and 0 other. Unescorted access for the individuals with confirmed positive tests was denied or revoked, as applicable.

For this reporting period, the positive test rate for PEC employees was approximately 0.14%,

with 1 positive result out of 738 tests. For this reporting period, the positive test rate for PEF employees was 0.0% with 0 positive results out of 226 tests.

For this reporting period, the positive test rate for PEC contractors was approximately 0.70%

with 11 positive results out of 1572 tests. For PEF, the positive test rate was 1.40% with 2 positive tests out of 143 tests.

PE&RAS-05-063 Page 4 of 12 Enclosure EVENTS REPORTED TO THE NRC Events Reported By Telephone Under 10 CFR 26.73 None.

PE&RAS-05-063 Page 5 of 12 Enclosure FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Progress Energy Carolinas, Inc. June 30, 2005 Company 6 Months Ending Brunswick Steam Electric Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml) LI Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 /

Cocaine 300/150 Phencyclidine 25/25 1 Opiates 300/300 Alcohol (% BAC) 0.04% /

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 866 N/A 535 Unescorted Access _____ _____ __________

CATEGORIES # Tested # Positive # Tested # Positive # Tested # Positive Pre-Access 39 0 N/A N/A 998 7 For Cause:

Post accident 0 0 N/A N/A 0 0 Observed behavior 2 0 N/A N/A 3 0 Random 257 0 N/A N/A 134 0 Follow-Up 0 0 N/A N/A 5 0 Other 0 0 N/A N/A 2 2 Total 298 0 N/A N/A 1142 9

PE&RAS-05-063 Page 6 of 12 Enclosure Breakdown of Confirmed Positive Tests for Specific Substances BRUNSWICK MariluanaAmphet- Phency- Refusal (NRCIPECAmht PhnyReua CUTOFF) Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 '4' 5 Licensee Employees 0 0 0 0 0 0 0 0_

Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A I I A . .

Short-Term Contracts 2/3 2 0 0 0 2 0 0 A

. I. .

Total I2/3 2 0 0 o0 2 0 0 _1 Ll 6/3Il-

-

.

PE&RAS-05-063 Page 7 of 12 Enclosure FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Progress Energy Carolinas, Inc. June 30, 2005 Company 6 Months Ending Shearon Harris Nuclear Power Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml) Lii Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 /

Cocaine 300/150 Phencyclidine 25/25 l Opiates 300/300 Alcohol (% BAC) 0.04% l Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 652 N/A 243 Unescorted Access CATEGORIES # Tested # Positive # Tested # Positive # Tested # Positive Pre-Access 57 0 N/A N/A 84 0 For Cause:

Post accident 3 0 N/A N/A 4 0 Observed behavior 2 0 N/A N/A 3 0 Random 212 0 N/A N/A 60 1 Follow-Up 6 0 N/A N/A 0 0 Other 0 0 N/A N/A 0 0 Total 280 0 N/A N/A 151 1

PE&RAS-05-063 Page 8 of 12 Enclosure Breakdown of Confirmed Positive Tests for Specific Substances HARRIS Marijuana Amphet- Phency- Refusal (NRCIPEC Autrto CUTOFF) Cocaine Opiates amrines cildine Alcohol to Test Adulteratlon 2 3 4.- 5 Licensee Employees 0 0 0 0 0 0 0 0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A Short-Term Contracts 0 0 0 0 0 1 0 0 4 4 4. 4 1 I + 4-4-4-4-4.-

TotTotal 0 0 0 0 0 1 0 0 A --

a . a A. J I I .1. I.LJ..1.L

PE&RAS-05-063 Page 9 of 12 Enclosure FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR126 Progress Energy Carolinas, Inc. June 30, 2005 Company 6 Months Ending H. B. Robinson Steam Electric Plant Location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml) Li Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 /

Cocaine 300/150 Phencyclidine 25/25 l Opiates 300/300 Alcohol (% BAC) 0.04% /

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 501 N/A 333 Unescorted Access _____

CATEGORIES # Tested # Positive # Tested # Positive # Tested # Positive Pre-Access 21 0 N/A N/A 179 0 For Cause:

Post accident 0 0 N/A N/A 3 0 Observed behavior 2 1 N/A N/A 2 0 Random 137 0 N/A N/A 95 1 Follow-Up 0 0 N/A N/A 0 0 Other 0 0 N/A N/A 0 0 Total 160 1 N/A NWA 279 1

PE&RAS-05-063 Page 10 of 12 Enclosure Breakdown of Confirmed Positive Tests for Specific Substances ROBINSON Marijuana Phency- Refusal (NRCIPEC Ape- Pec~ eua CUTOFF) Cocaine Opiates amines clidine Alcohol to Test Adulteration 2 3 4- 5 Licensee Employees 0 0 0 0 0 1 0 0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A Short-Term Contracts I 0 0 0 0 0 0 1 0 A

.4 .4 1 .4 &

1 I 0 2/0 0 0 0 0 1 Total 0 Total 0o 0 0 0 0 1 1 0 2/0 ..

PE&RAS-05-063 Page 11 of 12 Enclosure FITNESS FOR DUTY PROGRAM PERFORMANCE DATA Personnel Subject to 10 CFR 26 Progress Energy Florida, Inc. June 30, 2005 Company 6 Months Ending Crystal River Nuclear Plant location Cindy Cunningham 919-546-5360 Contact Name Phone (include area code)

Cutoffs: Screen/Confirmation (ng/ml) Ij Appendix A to 10 CFR 26 Marijuana 50/15 Amphetamines 1000/500 /

Cocaine 300/150 Phencyclidine 25/25 /

Opiates 300/300 Alcohol (% BAC) 0.04% /

Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number with 570 N/A 223 Unescorted Access CATEGORIES # Tested # Positive # Tested # Positive # Tested # Positive Pre-Access 76 0 N/A N/A 94 2 For Cause:

Post accident 1 0 N/A N/A 0 0 Observed behavior 0 0 N/A N/A 0 0 Random 149 0 N/A N/A 49 0 Follow-Up 0 0 N/A N/A 0 0 Other 0 0 N/A N/A 0 0 Total 226 0 N/A N/A 143 2

PE&RAS-05-063 Page 12 of 12 Enclosure Breakdown of Confirmed Positive Tests for Specific Substances CRYSTAL RIVER Marijuana Phency- Refusal (NRCIPEFAmht PhnyReua CUTOFF) Cocaine Opiates amines cildine Alcohol to Test Adulteration 2 3 4' 5 Licensee Employees 0 0 0 0 0 0 0 0 Long-Term Contracts N/A N/A N/A N/A N/A N/A N/A N/A Short-Term Contracts 0 1 0 0 0 0 1 0 A

. . . . .

Total 0 1 0 0 0 0 1 0 2v0 1' :-

Tota. 01 .