(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Letter Sequence Other |
---|
|
|
MONTHYEARML0527000622005-09-23023 September 2005 Tech Spec Pages for Amendment 289 Control Room Isolated Radiation Monitoring Instrumentation Project stage: Other ML0522103122005-09-23023 September 2005 Issuance of Amendment Control Room Isolation Radiation Monitoring Instrumentation Project stage: Approval 2005-09-23
[Table View] |
Tech Spec Pages for Amendment 289 Control Room Isolated Radiation Monitoring InstrumentationML052700062 |
Person / Time |
---|
Site: |
Millstone |
---|
Issue date: |
09/23/2005 |
---|
From: |
NRC/NRR/DLPM |
---|
To: |
|
---|
References |
---|
TAC MC4172 |
Download: ML052700062 (2) |
|
|
---|
Category:Technical Specifications
MONTHYEARML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML21280A3282021-10-0707 October 2021 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML20275A0002020-10-14014 October 2020 Issuance of Amendment No. 277 to Revise Technical Specification 6.8.4.g to Allow a One-Time Deferral of the Steam Generator Inspections ML20237H9952020-09-29029 September 2020 Issuance of Amendment No. 341 Revision to Technical Specification 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program ML20261H5982020-09-17017 September 2020 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20191A0042020-08-0707 August 2020 Issuance of Amendment No. 340 Revised Technical Specification Limits for Primary and Secondary Coolant Activity ML19126A0002019-05-28028 May 2019 Issuance of Amendment No. 273 Regarding Technical Specification Changes for Spent Fuel Storage and New Fuel Storage ML19042A2772019-03-21021 March 2019 Issuance of Amendment No. 272 Regarding Revision to Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels ML18100A0552018-04-0404 April 2018 License Amendment Request to Revise Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels ML17038A0062017-02-0101 February 2017 Technical Specifications 2016 Annual Report ML17025A2182017-01-24024 January 2017 Issuance of Amendment Realistic Large Break Loss-of-Coolant Accident Analysis ML16354A4242016-12-14014 December 2016 License Amendment Request to Revise Technical Specification Surveillance Requirement 4.1.3.1.2 for Control Element Assembly 39 for the Remainder of Cycle 24 ML16208A0512016-07-26026 July 2016 Clean Technical Specifications (TS) Pages for Millstone Power Station 1 (Docket No. 05000245), Administrative Changes for TS (L53121) ML16068A3122016-03-31031 March 2016 Issuance of Amendment No. 326 to Revise Technical Specifications for Containment Leak Rate Testing ML16011A4002016-01-29029 January 2016 Issuance of Amendments Nos. 325 and 267 to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML15288A0042015-11-30030 November 2015 Issuance of Amendment No. 266: Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times ML15280A2422015-10-29029 October 2015 Issuance of Amendment No. 324 Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program, Adoption of TSTF-425,Rev 3 ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML15225A0102015-08-28028 August 2015 Issuance of Amendment No. 264 Surveillance Requirement 4.4.4.2, Reactor Coolant System Relief Valves ML15225A0082015-08-26026 August 2015 Issuance of Amendment No. 322 Revision to the Final Safety Analysis Report - Examination Requirements for ANSI B31.1.0 Piping Welds ML15187A3262015-07-29029 July 2015 Issuance of Amendment No. 321, Adoption of TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C ML15187A1862015-07-28028 July 2015 Issuance of Amendment No. 263, Regarding Technical Specification Changes to Auxiliary Feedwater System (MF4692) ML15187A0112015-07-27027 July 2015 Issuance of Amendment No. 262, Refueling Water Storage Tank Allowable Temperatures ML15209A7292015-07-21021 July 2015 Response to Second Request for Additional Information Regarding Proposed Technical Specification Change for Spent Fuel Storage ML15098A0342015-05-20020 May 2015 Issuance of Amendment No. 261, Delete Technical Specification Index and Make Other Editorial and Administrative Changes ML15093A0022015-05-20020 May 2015 Issuance of Amendment No. 320, Delete Technical Specification Index and Make Other Editorial and Administrative Changes ML15093A4412015-05-18018 May 2015 Issuance of Amendment No. 319, Use of Areva M5 Alloy Clad Fuel Assemblies ML15044A0442015-02-0909 February 2015 Revised Response to Request for Additional Information Regarding License Amendment Request for Proposed Technical Specification Changes of the Refueling Water Storage Tank Allowable Temperatures ML15021A1282015-01-15015 January 2015 Proposed License Amendment Requests to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML14301A1122014-10-22022 October 2014 License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3 ML14154A0912014-05-28028 May 2014 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.5, Ultimate Heat Sink. ML14073A0552014-04-0808 April 2014 Issuance of Amendment Calculated Containment Internal Pressure ML13346A7672013-12-18018 December 2013 Correction Letter to License Amendment Nos. 256 and 257 ML13155A1402013-05-28028 May 2013 Response to Request for Additional Information Regarding Proposed Technical Specifications Changes for Spent Fuel Storage ML13133A0322013-05-0303 May 2013 License Amendment Request for Changes to Technical Specification 3/4.7.5 Ultimate Heat Sink. ML13133A0332013-05-0303 May 2013 License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink. ML12284A2132012-10-0404 October 2012 License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3 ML12250A6642012-08-28028 August 2012 Correction to Proposed Technical Specifications to Adopt TSTF-510 ML12220A0122012-07-31031 July 2012 Proposed Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process ML12219A0732012-07-31031 July 2012 Proposed Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process ML12202A0402012-07-17017 July 2012 License Amendment Request Regarding Removal of a License Condition, Proposed Technical Specifications Bases Change and FSAR Change for Ultimate Heat Sink Temperature Measurement ML12110A1142012-04-12012 April 2012 License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair ML12097A2002012-04-0202 April 2012 License Amendment Request to Revise Snubber Surveillance Requirements ML12032A2242012-01-25025 January 2012 License Amendment Request to Relocate TS Surveillance Frequencies to License Controlled Program in Accordance with TSTF-425, Revision 3 ML11329A0032011-11-17017 November 2011 Proposed License Amendment and Exemption Request for Use of Optimized Zirlo Rod Cladding ML11193A2242011-07-0505 July 2011 License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3, Attachment 3 Through Attachment 6, Marked-up TS Pages and TS Bases Pages ML11193A2232011-07-0505 July 2011 License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3, Attachment 1 Through Attachment 3, Marked-up TS Page Changes 3/4 6-22 ML1102802082011-01-20020 January 2011 License Amendment Request to Revise Technical Specification (TS) 6.8.4.g, Steam Generator (SG) Program, and TS 6.9.1.7, Steam Generator Tube Inspection Report for Temporary Alternate Repair Criteria (H*) ML1022400642010-07-21021 July 2010 License Amendment Request to Revise Technical Specification 3/4.9.3.1, Decay Time 2024-01-12
[Table view] |
Text
TABLE 3.3-6 r RADIATION MONITORING INSTRUMENTATION MINIMUM CHANNELS APPLICABLE ALARM/TRIP MEASUREMENT zMr INSTRUMENT OPERABLE MODES SETPOINT RANGE ACTION
- 1. AREA MONITORS I
- a. Delete t'3
- b. Control Room Isolation 2 ALL MODES 2 mR/hr 10 104 mR/hr 16 I
- c. Containment High Range I 1, 2, 3, & 4 100 R/hr 10° - 108 R/hr 17
- 2. PROCESS MONITORS
- a. Containment 1 1, 2, 3, & 4 NA 10 - 10+6 cpm 14 w Atmosphere-Particulate we b. Containment I 1, 2, 3, & 4 NA 10- 10+6 cpm 14 Atmosphere-Gaseous
- c. Noble Gas Effluent 1 1, 2, 3, & 4 2 x 10-1 uci/cc 103 - 105 uci/cc 17 Monitor (high range)
(Unit 2 stack) n z
0
$t 03 CD
TABLE 3.3-6 (Continued)
TABLE NOTATION (a) DELETED ACTION 13 - DELETED ACTION 14 - With the number of process monitors OPERABLE less than required by the MINIMUM CHANNELS OPERABLE requirement, comply with the ACTION requirements of Specification 3.4.6.1.
ACTION 15 - DELETED ACTION 16 - 1) With the number of OPERABLE channels one less than required by the MINIMUM CHANNELS OPERABLE requirement, restore the inoperable channel to OPERABLE status within 7 days or initiate and maintain operation of the control room emergency ventilation system in the recirculation mode of operation.
- 2) With the number of OPERABLE channels two less than required by the MINIMUM CHANNELS OPERABLE requirement, within I hour initiate and maintain operation of the control room emergency ventilation system in the recirculation mode of operation.
ACTION 17 - With the number of OPERABLE channels less than required by the MINIMUM CHANNELS OPERABLE requirements, initiate the preplanned alternate method of monitoring the appropriate parameter(s), within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and:
- 1) either restore the inoperable channel(s) to OPERABLE status within 7 days of the discovery or
- 2) prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within 14 days following discovery outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.
MILLSTONE - UNIT 2 3/4 3-26 Amendment No. 2, 400, 420, 24, 2,2284,289