Safety Evaluation Report: Building 31-1 Release to Unrestricted Use
ML993490324
Person / Time
Site: 07000734
Issue date: 12/06/1999
From: Adams M, Emeigh C, Gaskin C
Office of Nuclear Material Safety and Safeguards
To:
References
-RFPFR
Download: ML993490324 (2)


Text

,0

==

jk*PRr*G

==

J*2.

==

NUCLEAR

==

UNITED

==

STATES

==

C

==

0

==

NUCLEAR

==

REGULATORY

==

COMMISSION

==

-t

==

WASHINGTON,

==

D.C.

==

20555-0001

==

December

==

6,

==

1999

==

DOCKET

==

NO:

==

70-734

==

LICENSEE:

==

General

==

Atomics

==

(GA)

==

San

==

Diego,

==

California

==

SUBJECT:

==

SAFETY

==

EVALUATION

==

REPORT:

==

BUILDING

==

31-1

==

RELEASE

==

TO

==

UNRESTRICTED

==

USE

==

BACKGROUND

==

In

==

an

==

application

==

dated

==

August

==

27,

==

1999,

==

GA

==

requested

==

that

==

their

==

license

==

be

==

amended

==

to

==

remove

==

authorized

==

activities

==

at

==

Building

==

31-1

==

from

==

the

==

license

==

and

==

to

==

release

==

Building

==

31-1

==

for

==

unrestricted

==

use.

==

This

==

facility

==

is

==

the

==

Neutron

==

Radiography

==

Building

==

on

==

GA's

==

main

==

site.

==

GA

==

conducted

==

a

==

survey

==

of

==

Building

==

31-1

==

in

==

accordance

==

with

==

the

==

NRC-approved

==

General

==

Atomics'

==

Site

==

Decommissioning

==

Plan

==

and

==

provided

==

the

==

results

==

of

==

that

==

survey

==

with

==

their

==

submittal.

==

The

==

licensee

==

used

==

the

==

same

==

methodology

==

as

==

they

==

used

==

for

==

decontamination

==

and

==

decommissioning

==

of

==

the

==

other

==

facilities

==

previously

==

released

==

at

==

the

==

site.

==

DISCUSSION

==

Building

==

31-1

==

consists

==

of

==

five

==

rooms.

==

These

==

rooms

==

were

==

used

==

as

==

laboratories,

==

offices,

==

SNM

==

and

==

source

==

material

==

storage

==

vaults,

==

and

==

a

==

control

==

room

==

for

==

a

==

critical

==

assembly

==

that

==

had

==

been

==

previously

==

located

==

in

==

nearby

==

Building

==

31-2.

==

GA

==

completed

==

the

==

decontamination

==

and

==

final

==

survey

==

of

==

Building

==

31-1

==

and

==

submitted

==

a

==

final

==

report

==

entitled,

==

"Final

==

Radiological

==

Survey

==

Performed

==

at

==

General

==

Atomics'

==

Building

==

31-1,"

==

dated

==

August

==

25,

==

1999.

==

The

==

report

==

documents

==

the

==

results

==

of

==

radiological

==

measurements

==

completed

==

inside

==

the

==

building

==

and

==

on

==

the

==

roof,

==

and

==

of

==

soil

==

samples

==

collected

==

from

==

beneath

==

the

==

concrete

==

floor

==

inside

==

the

==

building

==

and

==

from

==

the

==

footprint

==

areas

==

1

==

meter

==

outside

==

the

==

building.

==

The

==

decontamination

==

procedures

==

and

==

survey

==

methodology

==

were

==

the

==

same

==

rigorous

==

procedures

==

as

==

used

==

in

==

the

==

Group

==

6,

==

Group

==

7,

==

Group

==

8,

==

Group

==

9,

==

Group

==

10,

==

and

==

Group

==

11

==

laboratories,

==

Building

==

30

==

phases

==

I

==

and

==

II,

==

Triga

==

Fuel

==

Fabrication

==

Facility,

==

and

==

others

==

which

==

have

==

been

==

previously

==

released.

==

GA's

==

radiological

==

measurements

==

and

==

soil

==

sample

==

results

==

provided

==

in

==

the

==

final

==

survey

==

report

==

for

==

Building

==

31-1

==

demonstrate

==

that

==

the

==

building

==

and

==

soil

==

underneath

==

the

==

building

==

and

==

in

==

the

==

surrounding

==

footprint

==

meet

==

the

==

NRC-approved

==

criteria

==

for

==

release

==

to

==

unrestricted

==

use

==

indicated

==

in

==

the

==

GA

==

Site

==

Decommissioning

==

Plan.

==

Inspectors

==

from

==

Region

==

IVperformed

==

a

==

confirmatory

==

survey

==

of

==

Building

==

31-1

==

on

==

August

==

2-6,

==

1999,

==

and

==

collected

==

numerous

==

split

==

samples

==

for

==

independent

==

analysis

==

(Inspection

==

Report

==

70-734/99-01)

==

and

==

determined

==

the

==

following:

==

Building

==

31-1

==

housed

==

offices,

==

laboratories,

==

storage

==

vaults

==

and

==

a

==

control

==

room

==

for

==

a

==

critical

==

facility

==

that

==

was

==

located

==

in

==

another

==

building.

==

The

==

areas

==

were

==

classified

==

as

==

either

==

"non-suspect

==

affected"

==

or

==

"suspect

==

affected

==

areas."

==

The

==

licensee

==

made

==

surface

==

and

==

area

==

measurements

==

and

==

analyses

==

of

==

the

==

walls,

==

floors,

==

roof,

==

and

==

roof

==

tar

==

and

==

gravel

==

layers.

==

Confirmatory

==

surveys

==

were

==

accomplished

==

in

==

these

==

areas

==

by

==

the

==

NRC

==

during

==

this

==

inspection.

==

2

==

The

==

licensee's

==

"Final

==

Radiological

==

Survey

==

Performed

==

at

==

General

==

Atomics'

==

Building

==

31-1,"

==

dated

==

August

==

24,

==

1999,

==

was

==

reviewed

==

and

==

found

==

acceptable.

==

The

==

licensee

==

has

==

implemented

==

a

==

program

==

for

==

the

==

conduct

==

and

==

documentation

==

of

==

final

==

surveys

==

that

==

follows

==

the

==

guidance

==

contained

==

in

==

Draft

==

NUREG/CR-5849,

==

"Manual

==

for

==

Conducting

==

Radiological

==

Surveys

==

in

==

Support

==

of

==

License

==

Termination."

==

Based

==

upon

==

GA's

==

final

==

survey

==

data

==

and

==

NRC

==

confirmatory

==

surveys

==

and

==

soil

==

samples,

==

NRC

==

has

==

determined

==

that

==

Building

==

31-1

==

decommissioning

==

meets

==

the

==

NRC-approved

==

release

==

criteria

==

and

==

that

==

Building

==

31-1

==

can

==

be

==

released

==

for

==

unrestricted

==

use.

==

ENVIRONMENTAL

==

REVIEW

==

Based

==

on

==

the

==

information

==

submitted

==

by

==

GA

==

and

==

confirmed

==

by

==

NRC

==

inspection,

==

the

==

staff

==

has

==

determined

==

that

==

the

==

changes

==

to

==

the

==

license

==

are

==

related

==

to

==

decreased

==

operations

==

at

==

the

==

facility

==

resulting

==

from

==

the

==

proposed

==

overall

==

decommissioning

==

of

==

the

==

site.

==

Accordingly,

==

the

==

staff

==

has

==

determined

==

that

==

the

==

criteria

==

in

==

10

==

CFR

==

51.22(c)(1

==

1)

==

for

==

categorically

==

excluding

==

an

==

action

==

from

==

an

==

environmental

==

review

==

have

==

been

==

met.

==

Therefore,

==

neither

==

an

==

Environmental

==

Assessment

==

nor

==

Environmental

==

Impact

==

Statement

==

is

==

necessary

==

for

==

this

==

action.

==

CONCLUSION

==

The

==

staff

==

concludes

==

that

==

GA's

==

request

==

to

==

reduce

==

licensed

==

activities

==

meets

==

regulatory

==

requirements

==

and

==

that

==

there

==

is

==

reasonable

==

assurance

==

that

==

the

==

proposed

==

action

==

will

==

not

==

adversely

==

impact

==

upon

==

the

==

health

==

and

==

safety

==

of

==

the

==

public

==

or

==

the

==

environment.

==

The

==

Region

==

IVPrincipal

==

Inspector

==

has

==

no

==

objection

==

to

==

this

==

proposed

==

action.

==

Principal

==

Contributor

==

Charles

==

E.

==

Gaskin

==

Mary

==

T.

==

Adams