ML091030520

From kanterella
Revision as of 08:10, 14 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
05/21/2009 Meeting Notice, Public Meeting Limerick 2008 Annual Assessment Meeting
ML091030520
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/13/2009
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
KROHN P, RI/DRP/PB4/610-337-5120
References
09-015
Download: ML091030520 (3)


Text

No.09-015 U. S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING April 13, 2009 Licensees: Exelon Generation Company, LLC Facility: Limerick Generating Station Units 1 & 2 Docket No. 50-352 & 50-353 Date and Time: May 21, 2009 from 6:00 p.m. to 7:30 p.m.

Location: Limerick Energy Information Center 218 Longview Road Royersford, PA 19468-1016 Purpose: To discuss the NRCs assessment of the safety performance of Exelons Limerick Generation Station, Units 1 & 2 for calendar year 2008 and the role of the agency in ensuring safe plant operations.

Attendees:

NRC: P. Krohn, Chief, Project Branch 4, Region I E. DiPaolo, Senior Resident Inspector, Limerick N. Sieller, Resident Inspector, Limerick A. Rosebrook, Senior Project Engineer, Branch 4 Exelon: C. Mudrick, Site Vice President E. Callan, Plant Manager R. Kreider, Manager, Regulatory Assurance Public Participation*: This is a Category 1 Meeting. The NRC staff will hold an open house to discuss Exelonss performance at the Limerick Generating Station during calendar year 2008 and the role of the agency in ensuring safe plant operations. During the session the public will have the opportunity to talk with the NRC staff on an informal basis.

2 The NRCs Annual Assessment Letter for Limerick Generating Station can be located in ADAMS with Accession Number ML090620797. ADAMS is accessible from the NRC website:

http://www.nrc.gov/reading-rm/adams.html. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Limerick Generating Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting Contact: Paul G. Krohn, Chief, Projects Branch 4 (610) 337-5120 E-mail: Paul.Krohn@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by May 19, 2009, via telephone to the NRC meeting contact.

Approved by: /RA by Andrew A. Rosebrook Acting For/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc w/encl:

C. Crane, President and Chief Operating Officer, Exelon Corporation M. Pacilio, Chief Operating Officer, Exelon Nuclear C. Mudrick, Site Vice President, Limerick Generating Station E. Callan, Plant Manager, Limerick Generating Station R. Kreider, Regulatory Assurance Manager, Limerick J. Grimes, Acting Senior Vice President, Mid-Atlantic Operations K. Jury, Vice President, Licensing & Regulatory Affairs P. Cowan, Director, Licensing D. Helker, Licensing B. Fewell, Associate General Counsel, Exelon Correspondence Control Desk D. Allard, Director, PA Dept of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township

2 The NRCs Annual Assessment Letter for Limerick Generating Station can be located in ADAMS with Accession Number ML090620797. ADAMS is accessible from the NRC website:

http://www.nrc.gov/reading-rm/adams.html. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Limerick Generating Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting Contact: Paul G. Krohn, Chief, Projects Branch 4 (610) 337-5120 E-mail: Paul.Krohn@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by May 19, 2009, via telephone to the NRC meeting contact.

Approved by: __/RA by Andrew A. Rosebrook Acting For/_

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution: (Via E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Associate Director, Office of Operating Reactor Oversight and Licensing, NRR/ADRO (RIDSNRRADRO)

Director, Division of Inspection and Regional Supprt, NRR/DIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Project Directorate I-1 (PD1-2), NRR (RIDSNRRDORILpl 1-2)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA L. Pinkham, Resident OA R. Nelson, NRR M. Dapas, DRA D. Roberts, DRS H. Chernoff, NRR D. Lew, DRP P. Wilson, DRS RI Receptionist J. Clifford, DRP D. Screnci, PAO DRS Div Secretary P. Krohn, DRP N. Sheehan, PAO DRP Div Secretary R. Fuhrmeister, DRP R. Barkley, ORA DNMS Div Secretary A. Rosebrook, DRP N. McNamara, SLO G. Matakas, ORA E. Torres, DRP D. Tifft, SLO PMNS J. Bream, DRP S. Campbell, RI, OEDO ROPreports@nrc.gov E. DiPaolo, DRP, SRI P. Bamford, PM, NRR Region I Docket Room (with N. Sieller, DRP, RI E. Miller, NRR, Backup concurrences)

SUNSI REVIEW COMPLETE: _AAR___ (Reviewers Initials)

DOCUMENT NAME: G:\DRP\BRANCH4\ASSESSMENT (EOC, MC)\ROP 9 EOC\LM 2008 AAM MEETING NOTICE REV0.DOC After declaring this document An Official Agency Record it will be released to the Public. ML091030520 To receive a copy of this document, indicate in the box: C = Copy without attachment/enclosure E = Copy with attachment/enclosure N = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook/AAR PKrohn./ AAR for DATE 04/13/09 04/13 /09 OFFICIAL RECORD COPY