2010-12-DRAFT Written Exam Comments
ML110450210
Person / Time
Site: 05000548
Issue date: 12/10/2010
From: Garchow S
Operations Branch IV
To:
Entergy Nuclear Operations
References
ES-401, ES-401-9, RB-2010-12 50-548/10-401
Download: ML110450210 (7)


Text

ES-401 RB-2010-12 Written Examination Review Worksheet Form ES-401-9 THIS in explanation means last 2 NRC exams.

THIS in explanation means student handout.

File: DRAFT Written Markup.pdf contains markups.

Review Completed By: Gabriel Apger

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 1 F 2 B S A41.7[2008NRC]

2 H 2 B S B41.7[2007NRC]

3 F 3 B S A41.7 4 H 1 N S A41.7 U C41.6 See markup file. Answers are true/false statements.

5 F 3 U N S This question was rewritten.

6 F 3 N S C41.10 Justification for correct answer needs minor edit. See markup file.

Instructions

[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]

1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
2. Enter the level of difficulty (LOD) of each question using a 1 B 5 (easy B difficult) rating scale (questions in the 2 B 4 range are acceptable).
3. Check the appropriate box if a psychometric flaw is identified:

$ The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).

$ The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).

$ The answer choices are a collection of unrelated true/false statements.

$ The distractors are not credible; single implausible distractors should be repaired, more than one is unacceptable.

$ One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).

4. Check the appropriate box if a job content error is identified:

$ The question is not linked to the job requirements (i.e., the question has a valid K/A but, as written, is not operational in content).

$ The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).

$ The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).

$ The question requires reverse logic or application compared to the job requirements.

5. Check questions that are sampled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable).
6. Enter question source: (B)ank, (M)odified, or (N)ew. Check that (M)odified questions meet criteria of ES-401 Section D.2.f.
7. Based on the reviewer=s judgment, is the question as written (U)nsatisfactory (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
8. At a minimum, explain any AU@ ratings (e.g., how the Appendix B psychometric attributes are not being met). Page 1 of 7 OBDI 202 - IOLE Process

ES-401 RB-2010-12 2 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 7 H 2 E N S D41.7.

8 H 2 N S D41.10 9 F 3 M S D41.10 Modified condition in stem to elicit different answer than original bank.

B41.7 See markup file. A, C and D are not credible due to stem stating that safety buses are energized from offsite. The subject distracters all have a condition where a U safety bus is energized from its diesel, which conflicts with the stem. Also, stating the 10 H 1 U U N safety buses are energized from offsite would cue that none of the diesels are S

loaded.

Stem was rewritten.

E D41.5 See markup file. A is not credible.

11 H 2 E N S Rewrote distractor A.

12 F 3 B S B41.10 E D41.10 Add of at end of sentence in stem.

13 F 2 N S Edited as indicated.

14 F 3 B S B41.2 [2003NRC]STUDENT HANDOUT EOP Caution 1 15 H 2 N S A41.10 STUDENT HANDOUT EOP-1 Fig 2 16 H 3 N S C41.10 17 H 2 N S A41.10/6/7 18 F 2 E N S D41.7 D is also the longest answer.

19 F 3 B S B41.4 A41.5 C and D both have two sentences that conflict with one another and can be U eliminated early (not credible). Stem supports the answer for Q4 (turbine trip on 20 H 1 U B generator trip).

S Distractors C and D were rewritten.

21 H 3 N S D41.10 E C41.5 See markup for recommended clarification to stem.

22 H 3 N S Edited as indicated.

E B41.10 Need technical reference (i.e., AOP) to support correct answer.

23 H 2 N S The technical reference was provided. Page 2 of 7 OBDI 202 - IOLE Process

ES-401 RB-2010-12 3 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 24 H 2 N S B41.11 D41.4 Explanation for B needs to be fixed.

25 F 2 N S The explanation for B was rewritten.

C41.10 [2004NRC] While the correct answer may seem obvious, a technical 26 F 2 B S reference still needs to be provided to support the correct answer. (NOT INCLUDED) 27 F 2 N S C41.9 D41.10 Because the dangling modifier which will result in is attached to the E subject of lowering RPV pressure below shutoff head, C is also correct. Recommend 28 F 2 E N rewording.

S The stem was rewritten.

C41.3 A and B are not credible because the heat load would never be higher after a U

29 H 3 U N shuffle.

S A and B were rewritten.

30 H 2 N S B41.8 31 F 2 B S B41.8 [2007NRC]

32 H 2 B S A41.6 [2008NRC]

33 H 2 N S A41.6 34 H 3 N S A41.7 35 F 2 N S B41.7 36 H 3 N S D41.7 37 H 3 N S C41.7 38 F 3 N S D41.7 39 H 2 N S C41.10 40 H 4 N S B41.7 U A41.7/10 The question does not test on an ADS limit or precaution.

41 H 2 U N S After discussion with the plant staff, this question is ok as written.

42 H 3 B S B41.7 [2003NRC]

43 H 3 N S D41.7 Page 3 of 7 OBDI 202 - IOLE Process

ES-401 RB-2010-12 4 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only E B41.7 Minor clarification in stem. See markup.

44 F 2 N S This question was edited as indicated on the markup.

45 H 3 B S B41.7 [1997NRC]

46 H 3 N S A41.8 47 H 3 N S D41.10 C41.4 It looks, by the drawing, that the 500KV yard can supply either the North or E

48 F 2 E N South lines via a 230KV feed making D also correct.

S The stem was rewritten.

49 H 3 B S D41.4 [2007NRC]

50 H 2 B S A41.4 [2007NRC]

51 H 3 N S A41.8 52 H 3 N S C41.4 53 H 2 N S C41.4 54 F 3 N S D41.6 D41.6 A and B are not credible because the stem states there is a fault in the HCU U

55 H 2 U N for B FCV and the B FCV is locked up.

S The stem was rewritten.

C41.3 A and D are not credible because they deal with flow, and stem specifically U

56 F 2 U N addresses overpressure protection.

S The distractors were rewritten.

57 F 3 N S D41.4 58 H 2 N S D41.4 59 H 3 M S A41.4 Changing stem condition changed correct answer.

60 H 2 N S B41.4 61 H 3 N S C41.4 62 F 2 N S A41.4 Page 4 of 7 OBDI 202 - IOLE Process

ES-401 RB-2010-12 5 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only U D41.4 Choices are T/F style.

63 F 3 U N S After discussion with the plant staff, this question is ok as written.

64 H 3 N S D41.9 65 F 2 B S D41.2 66 F 2 N S D41.10 Meets pedigree of negatively stated question (1021 App B).

67 H 2 B S B41.5 [2007NRC]

68 F 3 N S D41.10 Meets pedigree of negatively stated question (1021 App B).

U D41.10 Distractor C is also correct.

69 F 3 U N S Rewrote distractors A and C.

70 F 2 M S A41.10 Meets pedigree of negatively stated question (1021 App B).

71 F 2 N S D41.10 72 F 4 N S B41.10 Meets pedigree of negatively stated question (1021 App B).

73 H 2 N S B41.10 74 F 2 N S A41.10 E D41.10 See markup 75 F 2 N S Edited as indicated in markup.

76 H 3 N S A43.5 77 H 2 N S C41.7 78 H 2 N S A43.5 79 H 3 N S B43.6 B43.5 [2007NRC GGNS] STUDENT HANDOUT EOP Fig 2 HCTL Because there is nothing in the stem that lets the applicant know how fast RPV pressure must be E

80 H 3 E B reduced, an applicant could argue C is also correct. Recommend editing stem or S distractor to ensure B is only correct.

Rewrote distractor B.

D43.5 STUDENT HANDOUT EOP-1 Caution 1 B not credible with 0psig, steady E

81 H 3 E N RPV level way above TAF and RPV blowdown complete.

S Rewrote distractor B. Page 5 of 7 OBDI 202 - IOLE Process

ES-401 RB-2010-12 6 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only B43.5 As written, the assumption can be made that before the required boron has been injected, pressure can change, but after the boron has been injected, pressure E

82 H 2 E N must be stabilized?? Recommend changing C and D to read maintain pressure S stable.

Edited as recommended.

B43.5 C not credible. Concern for a loss of feedwater heating with a scram condition 83 H 3 E N E present as stated in the stem makes no sense.

84 F 2 N S C43.1 E A43.5 STUDENT HANDOUT EOP-0003 Table H See markup.

85 H 3 N S Edited as indicated.

U D43.5 Remove reason from correct answer because it answers question 31.

86 H 2 U N S Removed the reason from the distractors.

E B43.5 See question 32 for overlap.

87 H 3 N S This question is ok as written.

88 H 4 N S D43.2 STUDENT HANDOUT TS 3.3.1.1 89 H 4 N S D43.5 90 H 3 N S B43.5 E A43.5 B is not credible.

91 H 2 E N S Distractor B was rewritten.

92 H 3 N S A43.5 C43.5 Remove the reasons for procedure entry in part (B) because they conflict with E

93 H 3 N the procedure for choices A and D, making the choices less credible.

S This correction was made as recommended.

94 F 2 N S D43.3 95 H 2 N S C43.2 STUDENT HANDOUT TR 3.4.13 E B43.5 Verify OSP-37 is only correct answer.

96 F 2 N S OSP-37 is the only correct answer.

C43.2 D doesnt seem credible.

97 H 3 N S Distractor D is ok as written. Page 6 of 7 OBDI 202 - IOLE Process

ES-401 RB-2010-12 7 Form ES-401-9

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7. 8.

Q# LOK LOD (F/H) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO B/M/N U/E/S Explanation Focus Dist. Link units ward K/A Only 98 F 2 N S B43.4 B43.5 Knowing the facility is in an SBO, A and D can be easily eliminated. Low U

99 H 1 U N discriminatory value.

S This question was rewritten.

A43.5 Recommend changing address to resolve because C could be argued as H E 100 2 E N correct, as it indeed addresses invalid annunciators.

S Edited as indicated.

B= 16 F= 33 = 44% E=

RO TOTALS: M= 3 H= 42= 56% U= 9= 13% Additional Notes:

N= 56 B= 1 F= 4 = 16% E=

Additional Notes: 2 additional unsats can be corrected with simple edits and are not SRO TOTALS: M= 0 H= 21 = 84% U= 2 = 8%

counted.

N= 24

GENERAL COMMENT

S:

1. Bank questions are indicated by B; Modified are indicated by M; New questions are indicated by N
2. Chief Examiner comments are indicated in blue.
3. Average difficulty is __ 2.36__ on the RO exam and 2.52 on the SRO exam.
4. The answer distribution is: RO / SRO A = 17 / 6 B = 18 / 9 C = 15 / 5 D = 25 / 5
5. There are 2(RO) 5(SRO) questions with attachments provided. Page 7 of 7 OBDI 202 - IOLE Process