Final Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML12340A156
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/26/2012
From: Rencurrel D
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-12002932
Download: ML12340A156 (4)


Text

Nuclear Operating Company South Texas ProjectElectric GeneratingStation P.O Box 289 Wadsworth. Texas 77483 Vv November 26, 2012 NOC-AE-12002932 10 CFR 50.54(f)

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Final Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident

References:

1. NRC Letter, Eric Leeds to E. D. Halpin, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012 (ML12056A046)
2. NRC Letter, Endorsement of Nuclear Energy Institute (NEI) 12-07, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features," dated May 31, 2012 (ML12144A142)
3. Letter, D. W. Rencurrel to NRC Document Control Desk, "Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated June 5, 2012, NOC-AE-12002864 (ML12163A127)

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 4 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Flooding Walkdowns. Specifically, of Reference 1 states that within 180 days of the NRC's endorsement of the walkdown process (Reference 2), each addressee will submit its final response, including a list of any areas that are unable to be inspected due to inaccessibility and a schedule for when the flooding walkdown will be completed. to this letter contains the STP Nuclear Operating Company (STPNOC) flooding walkdown response for South Texas Project Units 1 and 2, performed in accordance with References 2 and 3. Attachment 2 provides a list of the restricted access items and scheduled inspection dates for completing the walkdowns when conditions allow.

STI: 33626716

NOC-AE-1 2002932 Page 2 of 3 A list of commitments is provided in Attachment 3 to this letter. There are no other regulatory commitments in this letter.

If there are any questions regarding this letter, please contact Coley Chappell at (361) 972-4745 or me at (361) 972-7867.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on  !!_'/ -:2 '.

Senior Vice President ccc Attachments:

1. Flooding Walkdown Summary Report for South Texas Project Units 1 & 2
2. List of Restricted Access Items
3. List of Commitments

NOC-AE-1 2002932 Page 3 of 3 cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 1600 East Lamar Boulevard Arlington, TX 76011-4511 Balwant K. Singal Carl F. Lyon U. S. Nuclear Regulatory Commission Balwant K. Singal John Ragan Senior Project Manager Chris O'Hara U.S. Nuclear Regulatory Commission Jim von Suskil One White Flint North (MS 8 B1) NRG South Texas LP 11555 Rockville Pike Rockville, MD 20852 Kevin Polio NRC Resident Inspector Richard Pefia U. S. Nuclear Regulatory Commission City Public Service P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 C. M. Canady Peter Nemeth City of Austin Crain Caton & James, P.C.

Electric Utility Department 721 Barton Springs Road C. Mele Austin, TX 78704 City of Austin Eric Leeds Richard A. Ratliff Director, Office of Nuclear Reactor Regulation Texas Department of State Health U.S. Nuclear Regulatory Commission Services One White Flint North (MS 13 H 16M) 11555 Rockville Pike Alice Rogers Rockville, MD 20852 Texas Department of State Health Services Carl F. Lyon Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 8 B1A) 11555 Rockville Pike Rockville, MD 20852

Attachment 3 NOC-AE-1 2002932 Page 1 of 1 List of Commitments The following table identifies the actions to which the STP Nuclear Operating Company has committed. Statements in this submittal with the exception of those in the table below are provided for information purposes and are not considered commitments.

Commitment Scheduled Condition Due Date Report Complete the inspections of all restricted access items as identified in the STP Units 1 & 2 Flooding Walkdown Summary Report Section Ill.B, under the section 11/15/2013 12-26142-30 "Restricted Access Items."