MONTHYEARML23020A1002023-03-0303 March 2023 OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter ML23066A0892023-02-24024 February 2023 OEDO-22-00419 - Email Dated 02/24/2023 to Petitioner on Seabrook Unit 1 ASR Petition ML22349A1062022-12-14014 December 2022 OEDO-22-00419 - Lochbaum Comments on C-10 ASR 2.206 Petition for Seabrook ML23009B1362022-12-14014 December 2022 Transcript - Meeting with the Petition Review Board and C-10 Research & Education Foundation Regarding a 2.206 Petition Submitted on October 4, 2022 ML22333A7452022-11-22022 November 2022 OEDO-22-00419 - Email: C-10 Response on PRB Initial Assessment - C-10 Petition on Seabrook ASR Concrete Degradation ML22287A1472022-10-13013 October 2022 2.026 Petition Screen-in Email ML17227A5382017-05-12012 May 2017 OEDO-17-00529- Letter from Research & Education Foundation 10 CFR 2.204 Demand for Information (DFI) ML16169A1722016-07-0606 July 2016 OEDO-16-00007 - Letter to S. Gavutis, C-10 Research & Education Foundation, Final Decision 2.206 Petition from C-10 Research & Education Foundation Regarding Seabrook Station, Unit No. 1 ML16006A0022015-12-22022 December 2015 OEDO-16-00007 - 2.206 - Seabrook Immediate Implementation and Enforcement of Aci 349.3R & ASTM C 856-11 Code Standards Requiring Core Sampling and Petrographic Testing for the Mechanical Properties of Tensile ML0829005822008-10-0505 October 2008 G20080695/EDATS: OEDO-2008-0770 - Thomas Saporito Ltr. Request for Enforcement Action Against the Florida Power and Light Company (Fpl), and FPL Group, and FPL Energy Point Beach LLC and FPL Energy Seabrook LLC and Individuals 2023-03-03
[Table view] Category:Letter
MONTHYEARIR 05000443/20240032024-10-30030 October 2024 Integrated Inspection Report 05000443/2024003 ML24303A0352024-10-29029 October 2024 Operator Licensing Examination Approval IR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 05000443/LER-2024-001, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-037, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report 2024-09-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 6, 2016 Ms. Sandra Gavutis, Executive Director C-10 Research & Education Foundation 44 Merrimac Street Newburyport, MA 01950
Dear Ms. Gavutis:
Your petition submitted by e-mail, dated December 22, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16006A002}, addressed to MSHD Resource, has been referred to me pursuant to Title 10 of the Code of Federal Regulations (10 CFR}, 2.206, "Requests for action under this subpart," of the U.S. Nuclear Regulatory Commission (NRC) regulations. You requested that the NRC issue an order to the licensee of the Seabrook Station, Unit No. 1 (Seabrook), requiring immediate implementation and enforcement of American Concrete Institute (ACI) 349.3R, "Evaluation of Existing Nuclear Safety-Related Concrete Structures," and American Society for Testing and Materials (ASTM) C856-11, "Standard Practice for Petrographic Examination of Hardened Concrete," and requiring core sampling and petrographic testing for the mechanical properties of tensile strength, Poisson's ratio, modulus of elasticity, and compressive strength-specifically for walls of the containment building and spent fuel pool at Seabrook. As the basis for your request, you state that alkali-silica reaction (ASR) continues to degrade the structural integrity of concrete structures at Seabrook, and that core sampling and petrographic testing is necessary to understand the current properties of, and the extent of degradation caused by ASR on safety-related structures at Seabrook. C-10 Research & Education Foundation (C-10) believes that the presence of ASR at Seabrook is inimical to public health and safety.
Your petition was supplemented by e-mail comments from Mr. David Lochbaum of the Union of Concerned Scientists, dated February 12, 2016 (ADAMS Accession No. ML16043A486); e-mail comments from Mr. Paul Brown, dated February 14, 2016 (ADAMS Accession No. ML16047A020); and e-mail comments by C-10, dated February 15, 2016 (ADAMS Accession No. ML16047A021).
The Petition Review Board (PRB) held a teleconference on February 16, 2016, to give C-10 an opportunity to provide any relevant additional explanation and support its request. This teleconference was transcribed and added as a supplement to the petition. The transcript is located at ADAMS Accession No. ML16055A394.
The licensee for Seabrook provided a voluntary response to your petition by letter dated February 23, 2016 (ADAMS Accession No. ML16056A083).
As your request acknowledged, you submitted by letter dated September 25, 2014 (ADAMS Accession No. ML14281A124), a petition for rulemaking (PRM-50-109) pursuant to 10 CFR 2.802, "Petition for rulemaking." That petition for rulemaking requested that the NRC amend its regulations to require that all licensees comply with ACI 349.3R and ASTM C856-11.
As described in an e-mail dated June 1, 2016 (ADAMS Accession No. ML16166A429), the NRC
S.Gavutis published PRM-50-109 in the Federal Register tor comment on January 12, 2015, and this issue is currently under NRC review.
The PRB reviewed PRM-50-109, and determined that it is practically identical to your 2.206 petition request for Seabrook in that both request NRC require licensee compliance with ACI 349.3R and ASTM C856-11. The main difference being that your 2.206 petition requests that the NRC staff issue an order requiring immediate implementation and enforcement of ACI 349.3R and ASTM C856-11 at Seabrook. However, based on periodic NRC inspections over the past several years, the PRB determined that there is no immediate safety concern caused by ASR at Seabrook.
On March 23, 2016, the NRC informed you by e-mail (ADAMS Accession No. ML16083A245) that the PRB recommended rejecting your petition, because it addresses deficiencies within existing NRC rules. Specifically, Management Directive (MD) 8.11, "Review Process for 10 CFR 2.206 Petitions" (ADAMS Accession No. ML041770328), Section 111.C.2, "Criteria for Rejecting Petitions Under 10 CFR 2.206," states that the NRC staff will not review a petition under 10 CFR 2.206 if "[t]he request addresses deficiencies within existing NRC rules."
Your petition requests that the NRC immediately require Seabrook compliance with industry standards ACI 349.3R and ASTM C856-11, which you acknowledge are not current regulatory requirements imposed by the NRC in 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities." Rather, your petition advocates for adoption and enforcement of these standards." As indicated in MD 8.11, a petition request that is focused on resolving a perceived deficiency with existing NRC rules is properly handled through a petition for rulemaking.
The NRC offered you a second opportunity to address the PRB, which you accepted. At your request, the PRB held a public meeting on June 6, 2016, in the NRC offices in Rockville, Maryland to provide you an opportunity to comment on the PRB's recommended rejection of your petition. This public meeting was transcribed and added as a supplement to the petition.
The transcript is located at ADAMS Accession No. ML16167A364. In addition, the meeting was webcast on the NRC webpage for viewing by the public. The PRB appreciated the information you provided during the public meeting. The PRB subsequently reviewed the transcript, and determined that the information presented did not revise or clarify the purpose and scope of the petition.
Therefore, in accordance with MD 8.11, Section 111.C.2, the PRB rejects the petition under the criterion that "[t]he request addresses deficiencies within existing NRC rules." This letter closes your 2.206 petition.
The NRC staff will continue to process and keep you informed about PRM-50-109.
S.Gavutis Thank you for bringing these issues to the attention of the NRC.
Sincerely, Ck-~~
Robert M. Taylor, Deputy Director Division of Sat ety Systems Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Listserv
ML16169A172 Package: ML161721A018 Incoming Petition: ML16006A002 (Incoming Petition) OED0-2016-00007: ML16006A309 *by e-mail OFFICE NRR/DORULPL4-2/PM NRR/DORULPL 1-2/LA NRR/DPR/PGCB/PM* Tech Editor* RI/DRS/BC*
NAME Jlamb LRonewicz JCarneal JDougherty MG ray DATE 6/29/16 6/21/16 6/24/16 6/21/16 6/29/16 OFFICE Rl/DRP/BC* NRR/DLR/RASB* NRR/DE/EMCB(A)* NRR/DPR/PGCB* OE/EB/BC(A)*
NAME FBower BWittick Yli LBanic RFretz DATE 6/29/16 6/29/16 6/27/16 6/23/16 6/27/16 OFFICE OGC* - NLO NRR/DORULP1 -2/BC* NRR/DSS/DD NAME MRing DBroaddus RTaylor DATE 6/29/16 6/27/16 7/6/16