TMI-17-093, Transmittal of Radiological Emergency Plan Annex Procedure EP-AA-1009, Revision 25

From kanterella
Revision as of 09:00, 10 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Transmittal of Radiological Emergency Plan Annex Procedure EP-AA-1009, Revision 25
ML17248A476
Person / Time
Site: Three Mile Island  Constellation icon.png
Issue date: 08/18/2017
From: David Helker
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17248A483 List:
References
TMI-17-093 EP-AA-1009, Rev. 25
Download: ML17248A476 (2)


Text

. . 1

,A lit!;:?'

AL> Exelon Generation 200 Exelon Way l<:ennett Square, PA 19348 www.exeloncorp.com 10 CFR 50.54(q)(5}

10 CFR 50.4 10 CFR 72.44(f)

TMl-17-093 August 18, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 Three Mile Island Nuclear Station, Unit 2 Facility Possession-Only License No. DPR-73 NRC Docket No. 50-320

Subject:

Exelon Generation Company Radiological Emergency Plan Annex Revision In accordance with 10 CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (EGC) is submitting an Emergency Plan Addendum revision for Three Mile Island Nuclear Station (TMI) as listed in the table below.

Procedure No~ Revision. Title ...

11 I

Exelon Nuclear Radiological Emergency Plan I EP-AA-1009 25 Annex for Three Mile Island (TM/) Station The changes to the Emergency Plan Annex were evaluated under the requirements of 10 CFR 50.54(q) and were determined not to result in a reduction in the effectiveness of the Emergency Plan for TMI. This notification is being submitted within 30 days of implementation of the changes as required by 10 CFR 50.54(q)(5). The changes continue to meet the applicable.

planning standards established in 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

In addition, as required by 10 CFR 50.54(q)(5), this submittal includes a summary analysis of the changes to the Emergency Plan (Attachment 1).

J

U.S. Nuclear Regulatory Commission Emergency Plan Annex Revision

  • Docket Nos. 50-289 and 50-320 August18,2017 Page 2 This submittal also satisfies the reporting requirements associated with 10 CFR 72.44(f), which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the U.S. Nuclear Regulatory Commission (NRC) Director, Division of Spent Fuel Management.

There are no regulatory commitments in this submittal.

If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.

Respectfully, f),£?y~

David P. Helker Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments:

1. 10 CFR 50.54(q)(5) Procedure Change Summary Analysis
2. EP-AA-1009, Revision 25, "Exelon Nuclear Radiological Emergency Plan Annex for Three Mile Island (TM/) Station" cc: w/ Attachments 1 only Regional Administrator - NRC Region I Director, NRC Division of Spent Fuel Management, ONMSS NRC Senior Resident Inspector - Three Mile Island Nuclear Station, Unit 1 NRG Project Manager, NRR - Three Mile Island Nuclear Station, Unit 1 Director, Bureau of Radiation Protection - Pennsylvania Department of Environmental Resources Chairman, Board of County Commissioners of Dauphin County, PA Chairman, Board of Supervisors of Londonderry Township, PA R. R. Janati, Commonwealth of Pennsylvania L__