NOC-AE-16003346, Voluntary Response to Regulatory Issue Summary (RIS) 2015-16 Revision 1, Planned Licensing Action Submittals for All Power Reactor Licensees

From kanterella
Revision as of 21:52, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Voluntary Response to Regulatory Issue Summary (RIS) 2015-16 Revision 1, Planned Licensing Action Submittals for All Power Reactor Licensees
ML16074A395
Person / Time
Site: South Texas  
Issue date: 02/29/2016
From: Marc-Anthony Murray
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-16003346, RIS-15-016, Rev. 1
Download: ML16074A395 (3)


Text

Nuclear Operating Company South Te&as Project Electric Generat'n& Station P.O. Box 239 Wadsworth, Texas 77433 ,v v. -

February 29, 2016 NOC-AE-1 6003346 10 CFR Part 50 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-000 1 South Texas Project Units 1 and 2 Docket No. STN 50-498 and STN 50-499 Voluntary Response to Regulatory Issue Summary (RIS) 2015-16 Revision 1, Planned Licensinq Action Submittals for all Power Reactor Licensees Regulatory Issue Summary (RIS) 2015-16 Revision 1, Planned Licensing Action Submittals for all Power Reactor Licensees, dated January 15, 2016, requested licensees to provide information regarding the licensing actions that are planned to be submitted to the NRC staff for review over the next 2 calendar years and power uprate applications planned over the next 5 years.

The requested information is strictly voluntary. The NRC staff plans to use the information in allocating its resources for licensing reviews.

STP Nuclear Operating Company (STPNOC) is providing a listing of planned licensing actions over the next 2 years for the South Texas Project (STP) Units 1 and 2.

The enclosure reflects the current target dates for the STPNOC submittals. These target dates are subject to change. Also, operational considerations may result in the addition of licensing actions that are not currently itemized in the attachment.

As requested in RIS 2015-16 Revision 1, a copy of this letter and the attachment are being provided to NRC_LicensingSurvey@NRC.gov.

There are no commitments in this letter.

Should you need further information regarding this submittal, please contact Lance Sterling at (361) 972-7887.

Michael P. Murray Manager, Regulatory Affairs

Attachment:

Planned Licensing Activities for the South Texas Project 2016- 2017 ** )

STh:34285336

NOC-AE-1 6003346 Page 2 of 2 CC:

(paper copy) (electronic copy)

Regional Administrator, Region IV Morgqan, Lewis & Bockius LLP U.S. Nuclear Regulatory Commission Steve Frantz, Esquire 1600 East Lamar Boulevard Arlington, TX 76011-4511 U.S. Nuclear Regqulatory Commission Lisa M. Regner NRCLicensingSurvey@NRC.gov Lisa M. Regner Senior Project Manager U.S. Nuclear Regulatory Commission NRG South Texas LP One White Flint North (O8H04) John Ragan 11555 Rockville Pike Chris O'Hara Rockville, MD 20852 Jim von Suskil NRC Resident Inspector CPS Enerqy U. S. Nuclear Regulatory Commission Kevin Polio P. O. Box 289, Mail Code: MNl16 Cris Eugster Wadsworth, TX 77483 L. D. Blaylock Crain Caton & James, P.C.

Peter Nemeth City of Austin Elaina Ball John Wester Texas Dept. of State Health Services Richard A. Ratliff Robert Free

Nuclear Operating Company South Te&as Project Electric Generat'n& Station P.O. Box 239 Wadsworth, Texas 77433 ,v v. -

February 29, 2016 NOC-AE-1 6003346 10 CFR Part 50 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-000 1 South Texas Project Units 1 and 2 Docket No. STN 50-498 and STN 50-499 Voluntary Response to Regulatory Issue Summary (RIS) 2015-16 Revision 1, Planned Licensinq Action Submittals for all Power Reactor Licensees Regulatory Issue Summary (RIS) 2015-16 Revision 1, Planned Licensing Action Submittals for all Power Reactor Licensees, dated January 15, 2016, requested licensees to provide information regarding the licensing actions that are planned to be submitted to the NRC staff for review over the next 2 calendar years and power uprate applications planned over the next 5 years.

The requested information is strictly voluntary. The NRC staff plans to use the information in allocating its resources for licensing reviews.

STP Nuclear Operating Company (STPNOC) is providing a listing of planned licensing actions over the next 2 years for the South Texas Project (STP) Units 1 and 2.

The enclosure reflects the current target dates for the STPNOC submittals. These target dates are subject to change. Also, operational considerations may result in the addition of licensing actions that are not currently itemized in the attachment.

As requested in RIS 2015-16 Revision 1, a copy of this letter and the attachment are being provided to NRC_LicensingSurvey@NRC.gov.

There are no commitments in this letter.

Should you need further information regarding this submittal, please contact Lance Sterling at (361) 972-7887.

Michael P. Murray Manager, Regulatory Affairs

Attachment:

Planned Licensing Activities for the South Texas Project 2016- 2017 ** )

STh:34285336

NOC-AE-1 6003346 Page 2 of 2 CC:

(paper copy) (electronic copy)

Regional Administrator, Region IV Morgqan, Lewis & Bockius LLP U.S. Nuclear Regulatory Commission Steve Frantz, Esquire 1600 East Lamar Boulevard Arlington, TX 76011-4511 U.S. Nuclear Regqulatory Commission Lisa M. Regner NRCLicensingSurvey@NRC.gov Lisa M. Regner Senior Project Manager U.S. Nuclear Regulatory Commission NRG South Texas LP One White Flint North (O8H04) John Ragan 11555 Rockville Pike Chris O'Hara Rockville, MD 20852 Jim von Suskil NRC Resident Inspector CPS Enerqy U. S. Nuclear Regulatory Commission Kevin Polio P. O. Box 289, Mail Code: MNl16 Cris Eugster Wadsworth, TX 77483 L. D. Blaylock Crain Caton & James, P.C.

Peter Nemeth City of Austin Elaina Ball John Wester Texas Dept. of State Health Services Richard A. Ratliff Robert Free