MONTHYEARRC-22-0004, (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System2022-01-14014 January 2022 (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System RC-18-0157, (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-28028 December 2018 (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0149, ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-21021 December 2018 ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)2018-12-12012 December 2018 (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) RC-18-0144, (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 252018-11-20020 November 2018 (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25 RC-18-0126, (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-01692018-11-0909 November 2018 (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.22018-10-0808 October 2018 (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection2018-10-0404 October 2018 NRC Request for Information Baseline Radiation Safety Inspection RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment RC-18-0112, (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.32018-09-27027 September 2018 (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3 RC-18-0119, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-09-19019 September 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information2018-09-11011 September 2018 (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information RC-18-0113, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-31031 August 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions2018-08-29029 August 2018 License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions RC-18-0111, License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-24024 August 2018 License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information2018-08-22022 August 2018 (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. RC-18-0102, Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error2018-08-10010 August 2018 Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0098, (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-07-30030 July 2018 (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0085, (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-01262018-07-23023 July 2018 (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126 RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...2018-07-12012 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-11011 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ2018-07-0303 July 2018 Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-0303 July 2018 Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error2018-06-29029 June 2018 Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal2018-06-18018 June 2018 Change of the Commitment Date of DRIB/105A&B Door Submittal RC-18-0060, (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error2018-05-30030 May 2018 (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report RC-18-0063, Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation2018-05-0202 May 2018 Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation RC-18-0056, (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors2018-04-25025 April 2018 (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors RC-18-0059, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information2018-04-19019 April 2018 License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information2018-04-0202 April 2018 (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information RC-18-0041, Report of Status of Decommissioning Funding2018-03-28028 March 2018 Report of Status of Decommissioning Funding RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error2018-01-31031 January 2018 Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error RC-18-0006, Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-01-25025 January 2018 Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-17-0169, Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-00192017-12-11011 December 2017 Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019 RC-17-0182, (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status2017-12-11011 December 2017 (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status RC-17-0172, Notification of Personnel Changes2017-11-30030 November 2017 Notification of Personnel Changes RC-17-0161, Submittal of Change of the Commitment Date of DRIB/105A&B Door2017-11-28028 November 2017 Submittal of Change of the Commitment Date of DRIB/105A&B Door RC-17-0135, Annual Commitment Change Summary Report2017-11-0303 November 2017 Annual Commitment Change Summary Report RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds2017-10-30030 October 2017 Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report2017-10-23023 October 2017 Transmittal of 10 CFR 50.59 Biennial Report RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 12017-09-27027 September 2017 Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/20170022017-09-0606 September 2017 Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days2017-09-0101 September 2017 Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days RC-17-0069, (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description2017-08-30030 August 2017 (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description 2022-01-14
[Table view] |
Text
George A. Lippard Vice President, Nuclear Operations 803.345.4810 July 26, 2017 A SCANA COMPANY RC-17-0098 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Sir/ Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS), UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 COMPLETION OF EXPEDITED SEISMIC EVALUATION PROCESS REPORT MODIFICATIONS
References:
- 1. Letter from T.D. Gatlin (SCE&G) to Document Control Desk (NRC),
"South Carolina Electric & Gas (SCE&G) Expedited Seismic Evaluation Report (CEUS Sites), Response to NRC Request for Information Pursuant to 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated December 17, 2014 [ML14357A168]
- 2. Letter from T.D. Gatlin (SCE&G) to Document Control Desk (NRC),
"Transmittal of Updated Expedited Seismic Evaluation Process Pages,"
dated August 13, 2015 [ML15229A089]
- 3. Letter from T. D. Gatlin (SCE&G) to Document Control Desk (NRC),
"Transmittal of Expedited Seismic Evaluation Process Report for V.C.
Summer Nuclear Station, Revision 1," dated January 28, 2016
[ML16032A167]
South Carolina Electric & Gas Company (SCE&G), acting for itself and as agent for South Carolina Public Service Authority is submitting notification of completion of the SCE&G Expedited Seismic Evaluation Process Report modifications, as required by References 1 through 3. The referenced correspondence contained commitments that were to be performed as a result of the Expedited Seismic Evaluation Process.
Attachments I and II provide a list of completed commitments established by the three referenced correspondence. Attachment II also contains the reason why the modification of the Digital Rod Position Indication Cooling Unit Outlet Fleader Isolation Valve, XVT03169-SW, was determined to not be required (Action 4).
V. C. Summer Nuclear Station
Document Control Desk CR-12-01097 RC-17-0098 Page 2 of 2 Should you have any questions, please call Bruce L. Thompson at 803-931-5042.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on TS/GAL/wm Attachment I: Regulatory Commitments Completion Attachment II: Section 8.4 Regulatory Commitments Completion cc: Without Attachments unless noted K. B. Marsh S. A. Byrne J. B. Archie N. S. Cams J. H. Hamilton S.M. Shealy W. M. Cherry C. Haney S. A. Williams S. M. Wyman (with Attachments)
F. G. Vega (with Attachments)
NRC Resident Inspector K. M. Sutton NSRC RTS (CR-12-01097)
File (815.07)
PRSF (RC-17-0098) (with Attachments)
Document Control Desk Attachment I CR-12-01097 RC-17-0098 Page 1 of 1 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 Attachment I Regulatory Commitments Completion Action # Commitment Due Date/ Event Complete walkdowns of Inaccessible Prior to completion of Fall 2015 1 Items listed in Table 7.1 of Expedited Outage - Complete as documented Seismic Evaluation Process report prior in Reference 3 to end of Fall 2015 refueling outage.
Submit letter to NRC stating walkdowns have been completed and provide 2 February 1, 2016 - Complete as HCLPF results in Attachment B of documented in Reference 3 Expedited Seismic Evaluation Process report.
60 days following completion of the Submit letter to NRC stating all second Unit 1 refueling outage after 3 Expedited Seismic Evaluation Process December 31, 2014 report Modifications, Actions 1 through 9 (Tentative Spring 2017) - Complete of Section 8.4, are complete.
as documented in Attachment II
Document Control Desk Attachment II CR-12-01097 RC-17-0098 Page 1 of 2 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 Attachment II Section 8.4 Regulatory Commitments Completion Action Equipment ID Equipment Action Description Completion Date
- Description :
Modify FLEX Support Procedures to include 7.2KV December 2016 -
1 XSW1DA operator actions to reset Switchgear Complete relays with HCLPF values less than the RLGM.
Modify FLEX Support Procedures to include 480V December 2016 -
2 XSW1DA1 operator actions to reset Switchgear Complete relays with HCLPF values less than the RLGM.
Modify FLEX Support Procedures to include 480V December 2016 -
3 XSW1DA2 operator actions to reset Switchgear Complete relays with HCLPF values less than the RLGM.
No later than the end Modify the seismic DRPI Cooling of the second Unit 1 interaction to provide Unit Outlet refueling outage after sufficient shake space, or 4 XVT03169-SW Header December 31, 2014 modify piping system Isolation (Tentative Spring supports such that HCLPF Valve 2017)-Deleted See
> GMRS.
Note*
Main Steam Modify valve or handrail to Header December 2016 -
5 IPV02000-MS provide sufficient shake Power Complete space.
Relief Valve No later than the end of the second Unit 1 125V DC Modify rack to reduce front refueling outage after 6 XBA-1A Distribution rail gaps. December 31, 2014 Bus Battery (Tentative Spring 2017) - Complete
Document Control Desk Attachment II CR-12-01097 RC-17-0098 Page 2 of 2 Action Equipment ID Equipment Action Description Completion Date
- Description No later than the end of the second Unit 1 125V DC Modify rack to reduce front refueling outage after 7 XBA-1B Distribution rail gaps. December 31, 2014 Bus Battery (Tentative Spring 2017) - Complete No later than the end of the second Unit 1 Main Steam Trim the steel angle post to XVT02843B- refueling outage after 8 Header Drain mitigate potential seismic MS December 31, 2014 Valve interaction.
(Tentative Spring 2017) - Complete DRPI Cooling Unit Inlet Modify the handrail to December 2016 -
9 XVT03164-SW Header mitigate potential seismic Complete Isolation interaction.
Valve
The modification for Action 4 was not required. Digital Rod Position Indication (DRPI) Cooling Unit Outlet Header Isolation Valve, XVT03169-SW is a fail close solenoid operated valve on the downstream side of the DRPI Cooling Unit, which is designated Non-Nuclear Safety (NNS).
DRPI Cooling Unit Outlet Header Check Valve, XVC03168-SW, is a check valve between XVT03169-SW and the DRPI Cooling Unit, which acts as the Code Break Boundary and prevents back flow into the NNS DRPI cooling unit during postulated failure of the cooling unit.
XVC03168-SW is an ANS 2b, ASME Code Class 3 check valve and is modeled as part of the seismic analysis previously completed to qualify XVT03169-SW (note the valves are 12 inches apart). The failure mode of XVT03169-SW, noted in Technical Report TR00080-005, "Expedited Seismic Evaluation Process Report for V.C. Summer Nuclear Station," is loss of functionality of the air operator. No loss of integrity of the piping system is expected at the review level ground motion (RLGM) levels. Even if XVT03169-SW fails to close, XVC03168-SW will prevent flooding into the Reactor Building during a postulated FLEX event. Also, XVT03169-SW is on the downstream side of the Reactor Building Cooling Unit (RBCU) and all necessary cooling required by the water through the RBCU coils would have already been accomplished.
In addition, EPRI Technical Report 3002000704, "Seismic Evaluation Guidance - Augmented Approach for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1:
Seismic," Section 3.2 specifically excludes piping, piping supports, and check valves from the ESEP; therefore no change is required to add the XVC03168-SW to the Expedited Seismic Equipment List (ESEL). Thus, the modification to XVT03169-SW to prevent seismic interaction was determined to not be required.