ML17209A601

From kanterella
Revision as of 01:07, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Tech Spec 4.6.2.2.d,Page 3/4 6-16b Re Spray Additive Flow Path Verification
ML17209A601
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/19/1981
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17209A600 List:
References
NUDOCS 8102030287
Download: ML17209A601 (2)


Text

CONTAINfi1EHT SYSTEt1S SURVEILLANCE RE UIREf1ENTS Continued

d. At least once per five years by verifying a sodium hydroxide (NaOH) flow rate of + gpm from the spray additive tank to a drain connection immediately downstream of the tank outlet valve, and a demineralized water flow rate of + gpm from that same drain connection to each containment spry pump. (Flow rates and tolerances for each of these two sources are to be determined following installation of flow rate test connections and completion of base-line test.)

ST. LUCI E - UNIT I 3/4 6-16b

STATE OP FLORIDA )

) ss ~

COUNTY OP DADE )

Robert E. Uhrig, being first duly sworn, deposes h

and says:

That he is a Vice President of Florida Power 6 Light Company, the Licensee herein; That he has executed the foregoing document; that the state-

'

ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.

Robert E. Uhrig Subscribed and sworn to before me this I sL day of 19//

oY~ 2 NOTARY PUBLXC, in and for the county of Dade, State of Florida t(OTARY PUSL{C STATE OF FLO."~CA ": L'Q MY COh'{hOSSION B(ylAE5 AOGUST 2i, I At aQNQED THAQ trATaea SCimjNS hm'CY Ny commission expires:

0 '