Text
RIG RITY PACCELERATED Rl DS P ROCESSli 1
G)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION WALDEN,J.V. Rochester Gas & Electric Corp.
WIDAY,J.A. Rochester Gas & Electric Corp. P RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Mo 950106 crating rept for r.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)
Dec 1994 NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
j for Ginna ENCL Station.
3 SIZE:
05000244 I
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE-CENTER 0 1 1 NRR/DIS P/PI PB 1 1 NRR/DOPS/OECB 1 1 RGN1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D
U N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUh!ENT CONTROL DESK, ROOM P!-37 (EXT. 504-2083 ) TO EL I %1INATE YOUR NAiIE PRO%I DISTRIBUTION LISTS I:OR DOCI;MENTS YOU DON"I'LED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10
t izzzzg< ~r~ivzzirl ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TELEPHONE AREA CODE 7ld 546 2700 GINNA STATION January 6, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for December, 1994 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of December, 1994.
Very truly yours, a,.d s h A. Wid Plant Manager JAW:tjn Attachments c: Mr. Thomas T. Martin NRC (1) 950118019b 941231 PDR ADOCK 05000244 s(c
OPERATING DATA REPORT 50-244 Jan a B, 1995 COMPLETED BY:
John V. Walden TELEPHONE (315)524-444B Ext.588 0 RATI G S US
- 1. Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes:
- 2. Reporting Period: December, 1994
- 3. Licensed Thermal Power (MWt): 1520
- 4. Nameplate Rating (Gross MWe): 490
- 5. Design Electric Rating (Net MWe): 470 B. Maximum Dependable Capacity (Gross MWe): 490
- 7. Maximum Dependable Capacity (Net MWe): 470
- 8. If Changes Occur in Capacity Rating (Items Number 3 Through 7) Since Last Report, Give Reason:
- 9. Power Levol to Which Rostricted, If Any (Net MWo):
- 10. Reason For Rostrictions, If An:
This Month Yr.-to. Date Cumulative""
- 11. Hours in Ropcrtod Period 744.0 8700.0 220008.0
- 12. Number of hours Reactor Was Critical 744.0 7289.3 176816.8
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 1087.0 i
- 14. Hours Generator On-line 744.0 7219.9 172972.3
- 15. Unit Rosorvo Shutdown Hours 0.0 0.0
- 10. Gross Thermal Energy Generated (MWH) 1115511.0 10559224.0 245616237.0
- 17. Gross Electrical Energy Generated (MWH) 377181.0 3550B93.0 81234052.0
- 18. Net Electrical Enorgy Gonoratod (MWH) 358923.0 3373857.0 77109230.0
- 19. Unit Servico Factor (%) 100.0 82.4 78.0
- 20. Unit Availability Factor (%) 100.0 82.4 78.0
- 21. Unit Capacity Factor (using MDC Net) (%) 102.0 81.9 75.7
- 22. Unit Capacity Factor (using DER Net) (%) 102.B 81.9 75.7
- 23. Unit Forced Outage Rate (%) 0.0 5.9
- 24. Shutdowns Scheduled Over Next B Months (Type, Dato and Duration of Each):
Refueling and Maintonanco, Start 3/20195, Duration 30 days
- 25. If Shutdown At End of Roport Period, Estimato Dato of Startup:
- 20. Units in Tost Status (Prior to Commercial Operation): Forcast Achiovod INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
" CUMULATIVETOTAL COMMENCING JANUARY 1, 1975
"" CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1909
AVERAGE DAILY UNIT POWER IZVEL DOCKET NO 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: Januar 6 1995 COMPLETED BY:
John Walden TELEPHONE: 3 5 524-4446 Ext. 588 MONTH December 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1~ 482 17 ~ 483 2 ~ 482 18. 483
- 3. 483 19. 483 4
5.
6.
~ 483 482 482 20.
21 22.
'83 482 483
- 7. 482 23. 483
- 8. 482 24. 483
- 9. 482 25. 483
- 10. 483 26. 483 482 27. 483
- 12. 482 28. 483 13 ~ 482 29. 484
- 14. 483 30. 484
- 15. 483 31. 483
- 16. 483 INSTRUCTIONS On this format, list the average daily unit p'ower level in MWe-Net for each day in reporting month. Compute to the nearest whole megawatt.
DO(:KET NO. ~0 244 UNIT NAhfl: R E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS
(:OhfPLETl:D BY on . a en REPORT MONTH December f'f:.1 lipllO l: ( 3~5 ) 524-4446 Ext'. 588 0 c c v Licensee c~ Cause 8 Corrective Cl 0 c Em 0 0 O Ho. Date 0 >
Event 0 Action to o
Qr0
~
Q~
Cl n
Ix.'
c Report a EA o
(J E o Prevent Recurrence O
0 Q
1 F: Forced Reason: hfethod: Fxhibit G - Instructions S: Scheduled A-Equipmcnt Failure (Explain) 1-hfanual for Preparation of Data B-hfaintenance or Test 2-hfa nual Scram. Entry Sheets for Licensee C-Rcfucling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
REV. 4/SS 4949 H-Other (Explain) Exhibit 1 - Same Source
NARRATXVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO: 50-244 UNIT: R.E. Ginna Nuclear Power Plant DATE: J n ar 6 1995 COMPLETED BY:
John Walden TELEPHONE: 315 524-4446 Ext. 588 MONTH December 1994 During the month of December the average power was 99%.