ML17298B558
| ML17298B558 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 12/03/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| ANPP-31296-EEVB, NUDOCS 8412050085 | |
| Download: ML17298B558 (8) | |
Text
REGULATORY NFORMATION DISTRIBUTION SY EM (RIDS)
ACCESSION NBR: 8012050085 DOC ~ DATE! 8g/12/03 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde.,Nuclear Stationi Unit 1~ Arizona Publi 05000528 AUTH+ NAME AUTHOR AFFILIATION VAN.BRUNTiE.E. Arizona Public Service Co, RECIP ~ iVAME RECIPIENT AFFILIATION KNIGHTONg G ~ Ii ~ Licensing Branch 3
SUBJECT:
Informs of addition of PJ McGuire- to corporate staff, Resume encl, DISTRIBUTION CODE: 8001D TITLE: Licensing Submittal: PSAR/FSAR Amdts COPIES RECEIVED:LTR 8,
ENCL . SIZE; Related Correspondence NOTES;Standardized plant ~ 05000528 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR/DL/ADL 0 NRR L83 BC 1 0 NRR L83 LA 1 0 LICITRAgE 01 1 1 INTERNAL; ACRS 01 6 6 ADM/LFMB 1 0 ELD/HDS3 1 0 IE FILE 1 1 IE/DEPER/EPB 1 1 IE/DEPER/IRB 35 1 1 SIP/QA 82136"'E/DQA NRR ROEgMiL NRR/DE/AEAB NRR/DE/EHEB 1
1 1
0 1
NRR/DE/CEB NRR/DE/EQB ll 13 1
1 2
1 1
2 NRR/DE/GB 28 2 2 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/SAB 24 1 1 NRR/DE/SGEB 25 1 1 NRR/DHFS/HFEBCO 1 1 NRR/DHFS/LQB 1 1 NRR/DHFS/PSRB 1 1 32'RR/DL/SSPB 1 0 NRR/DS I/AEB 26 1 1 NRR/DS I/ASB 1 1 NRR/DSI/CPB 10 1 1 NRR/DSI/CSB 09 1 NRR/DSI/ICSB 16 1 1 NRR/DSI/METB 12 1 NRR/DSI/PSB 19 1 1.
AB 1 1 NRR/DS I/RSB 23 ,1 1 FI 22'EG 04 1 RGN5 3 DAMI/MIB 1 0 EXTERNAL: BNL(AMDTS ONLY) 1 DMB/DSS'AMDTS) 1 FEMA REP DIV 39 1 1 LPDR 03 1 NRC PDR 1 1 NSIC 05 1 PNL GRUELiR 02'TIS 1 1 1 TOTAI NUMBER OF COPIES REQUIRED: LTTR 5e ENCL 46
4 1 , ~
I I gaff I rt h
1
'I II
~ ~ II V
h II II, I ~l
"'> 1'1 II II > s "II t.
lf ll',
rr I
Irr 1
h II Id%
J.'>
tl h I ')jg I r rr I
Il
'T h I
Arizona Public Service Company ANPP-31296-EEVB/WFQ December 3, 1984 Director of Nuclear Reactor Regulation Attention: Mr. George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Addition of Corporate Advisor Docket No. STN 50-528 File: 84-056-026'.1.01.10
Dear Mr. Knighton:
This letter is to inform you of the addition of Mr. Paul J. McGuire to the APS Corporate Staff for PVNGS. Mr. McGuire was hired as a full time APS employee effective August 15, 1984 and reports directly to me in an advisor capacity. Mr. McGuire's function is to provide assistance and consultation to APS corporate management in nuclear management.
Attached please find a copy of the resume'or Mr. McGuire. Because of his extensive background and experience in managing the operation of nuclear facilities, I believe that the addition of Mr. McGuire significantly enhances our organization by bringing nuclear oper'ational perspectives to our corporate staff. I believe this is a positive move for, the successful operation of Palo Verde. It is my intention that such an advisor will be used on the Palo Verde corporate staff until we gain additional experience in direct nuclear operation management.
If you have any questions, please contact me.
Very truly yours, APS Vice President Nuclear Production ANPP Project Director EEVB/WFQ/mb Attachment cc: A. C. Gehr D. B. Karner R. P. Zimmerman 8412050085 841203 PDR ADQCK 05000528 H PDR
~ C
\
~ ~
PAUL J. McGUIRE PVNGS OPERATIONS ADVISOR SALARY Seventeen years of management experience, in a broad range of posi'tions, involving construction, startup, operations, engineering and project management. Thirteen years in nuclear power and four years fossil power.
EXPERIENCE ARIZONA PUBLIC SERVICE COMPANY (1984 TO PRESENT) 08/84-Present Provide assistance and consultation to APS Corporate Management in the day to day decision making, concerning PVNGS Operations Management.
UNITED ENERGY SERVICES CORPORATION (1981 TO 1984) 03/84-08/84 Involved in the preparation and review of the APS Nuclear Administrative Policies and Procedures Manual.
ll/82-03/84 Management consultant to the Plant Manager at the Shoreham Nuclear Power Plant involved in operational readiness review of operations, maintenance,
,engineering, licensing, and health physics. Developed systematic approach to plant completion.
06/81-11/82 Management consultant to the Plant Manager and Vice President at waterford III, involved in the development of management controls, plant staffing and training.
NOTE: Vice President, Secretary and Board of Directors Member for United Energy Services Corporation BOSTON EDISON COMPANY (1976 TO 1981) 09/80-06/81 Assigned to the Institute of Nuclear Power Operations as a Evaluation Team Manager. Involved with three utility evaluations as well as development of the evaluation criteria.
06/76-09/80 Plant Manager of the Pilgrim Nuclear Power Station responsible for. the operation, maintenance, and modification of the plant.
~ ~ ~ c n
f
Paul J. McGuire Page Two I
GENERAL ELECTRIC 'COMPANY (1971 TO 1976) 09/75-06/76 Project Manager for first time refueling outages at four utilities', responsible for planning, organizing, scheduling and work completion.
Ol/75-09/75 Project'anager for the placement of safety-related piping at two Japanese utilities including engineering, fabrication, installation and testing.
03/72-01/75 -Startup of the Cooper. Nuclear Station as a Shift Supervisor during phases of construction,'tartup and power ascension. SRO certified.
12/71-03/72 Training at the Dresden Nuclear Station involved in simulator activities. SRO certified.
NUS CORPORATION (1970 TO 1971) 11/70-12/71 Startup of the Peach Bottom II Nuclear Station, involved in the preoperational testing of both the NSSS and Balance of Plaqt.'ONG ISLAND LIGHTING COMPANY (1967 TO 1970) 06/67-11/70 Responsible for fossil plant operations, instrument and controls, and maintenance, as well as the startup of a fossil unit. Positions held included Maintenance Engineer, Results Engineer and Operations Engineer.
EDUCATION B.S. in Mechanical Engineering, 1967 M.S. in Nuclear Engineering, 1971
P g '
1 r
,A r'
'f t> I