BOSTON EDISON COMPANY
-
,
.
.>... '
TELECbPY MESSAGE ' '
'
.
'215-337-5324
'
To:
Telephone Number T Date/ Time: 12/24/79 /
'
.
E To: Director, Region I From: Pilgrim Nuclear Power Station M
.
Office of Inspection and Enforcement .RFD #1 Rocky 11111 Road U. S. Nuclear Regulatory Commission Plymouth, MA 631 Park Avenue 02360 King of Prussia, PA 19406 Subj ect: PROMPT REPORTABLE OCCURRENCE -
Docket Number 50-293; License DPR-35
(
Assigned LER Number 79-048/01X-0 -
.
Event
Description:
e su chyard 12$olt M,_bacbp bag day w S Mu
- because of a failure of the main battery charger en Dec. 23, 1979. At 08 0 Dec. 24, 1979, the backup battery charger tripped and could not be e z' set. This is a limiting condition for operation as addressed in Section 3.9.3.5 of Tech. Specs.
Cause and Corrective Actionj The cause of the Battery Charger Failures is under in-vestigation. A spare battery charger is being brought on site and is expected to be
~
in service by 1300 Dec. 24,1979.
.
Facility Status:
c) Routine Startup 1904 % Thermal MW g) Shutdown d) Routine Shutdown e) Steady State X h) Refueling f) Load Changing 1) Other j) Not Applicaple A written follow-up report will be sent within two weeks. .
HRC person notified Mr. R. McClintock Mr. E. T. Graham Prepared by
,~ *
.
' '.
Q
~~
P00R BRIGlWl.
^ : .-,
wa m
.
. r. . .n.. ., , , , . -
" .
Mail (2) copies to: -
'
-
. *
.
-
. ,
.
Office of Management Information and Program Control 4 U. S. Nuclear Regulatory Commission *
,
Washington, D.C. 20555
- 7912280
,. .