REQ TORY INFORt'lATION DISTR IBU N SYBTEN (R IDB)
ACCESSION NBR: 8606160092 DOC. DATE: 86/06/11 NOTARIZED: NO DOCNET 5 FAC IL: 50-400 Shearon Harri s Nuclear Power Plant> Unit 1> Carolina 05000400 AUTH. NANE AUTHOR AFFILIATION SCHUNANN> S. C. Affiliation Not Ass.igned RECIP. NAl'1E RECIPIENT AFFILIATION DENTON> H. Office of Nuclear Reactor Regulation> Director <post 851125 Opposes util exemption +rom requirement of full gapa'tion
SUBJECT:
parti c emergenc Q p lan test within 1 gl pri 0'r to QL issuance.
DISTRIBUTION CODE: YEODD TITLE: Request for NRR COPIES RECEIVED: LTR Action (e. g. 2. 206 i ENCL Petitions) 8c Q SIZE: ~
Related Correspondenc NOTES:Application for permit renewal filed. 05000400 REC IP I ENT COP IEB RECIPIENT COPIES ID, CODE/MANE LTTR E CL ID CODE/NANE LTTR E 'CL PNR-A PD2 LA 1 PWR-A PD2 PD BUCKLEY> 8 01 INTERNAL: EDO/ACB ELD/HDS1 ELD/RED NRR DIR EXTERNAL 24X LPDR 03 NRC PDR 02 NBIC 05 TOTAL NUl'lBER OF COPIES REQUIRED:-- LTTR 12 ENCL
~ y H
> <'i "K"'$ ~
1
)
A' '
4 5/ I A',, i I' ll
'f > >". q11 t'g Ii <<,e n
~t l ll P
E JgP
.'.'":
'
~
fJyC f:
$
P,Q,'j 'ei
'f '9 ' Ill C'>
I"
)
' ' )'l j $
I ~
I, ~
l',! .,CZi"x T.3D-.~R 1 4 i i .."',0 "r
(
P
>>~$ :Q:>(,'~'i) b.D4 < ' w'3 kk!
l (5i1 I 4 1
fi I,'tt I"'I H '~l 4 1g
) '">(*i.
A i sK
"~)'(
tl
),tl
<<'i) ri 'g j'
~ (, ~
g ht
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (301) 492-7000
Subject:
Shearon Harris nuclear plant, Carolina Power 6 Light, Emergency Plan
Dear Mr. Denton,
Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CPR Part 50.
This is most significant since Chatham County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan. Thus, no plan which could actually be implemented if the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
Clearly, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a full participation test within oneshould year prior to the granting of any full power license be considered or approved.
Sincerely,