44th Revision to Document Previously Submitted on 4/16/1975, Entitled Plan for Evaluation, Repair, and Return to Service of Browns Ferry Units 1 and 2 (March 22, 1975, Fire).
ML18283B044
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/15/1976
From: Gilleland J
Tennessee Valley Authority
To: Rusche B
Office of Nuclear Reactor Regulation
References
Download: ML18283B044 (8)


Text

NRC FoRM 195 U.S, NUCLEAR REGULATORY C EMISSION DOCKET NUMBEA I2.70) gOy r 50-259It~

FI LE NUMBER NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL TO Mr ' C; Rusche FROM: TVA DATE OF DOCUMENT Chanttanogga, Tenn. 37401 6<<15-76 J, E, Gilleland DATE RECEIVED 18-76 6

%LETTER QNOTOA IZE 0 PROP INPUT FOAM NUMBER OF COPIES RECEIVED J'

GkoR IGINAL Im UN C LASS I F I E D OCOP Y .signed DEscRIPTION Ltr trans the following: ENcLOBURE /!"44th Revision to "plan for Evalua>>

tion,'Repair, & Return to Service of Browns

'Perry 1 & 2(March 22, 1975) Fire" ~ ~ ~ ~

(45 cys encl record)

J ~ '

~

l ~

PLANT NAME: Browns Ferry 1 & 2 IIo~~

ASST' kI:me!4M'AFETY FOR ACTION/INFO RMATI ON ASSIGNED AD: ASSI ~liED AD BRANCH CIIXEF:

PROJECT HANAGER: PRO C SNA LXC '.

INTERNAL D ISTR I BUTION G SYSTEMS SAFETY SITE S NRC PDR'&E HEINEIIAN ENV RO ANA S SCHROEDER BENAROYA N OELD GOSSICK & STAFF ENGINEERING IPPOLITO ENV MIPC MACCARRY KIRKMOOD CASE KNXGIlT SIWEXL OPERAT N REAC ORS HA ES PAWLXCKX ROJECT IIANA DIEN REACTOR SAFEXY OPERATIN CH BOYD ROSS EISENH P COLLINS NOVAK SHAO HOUSTON ROSZTOCZY BAER PETERSON CHECK BUTLER 1IELTZ GRII IES HELTEMES AT&X SKOVHOLT SALTZHAN OLL RUTAERG EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR: NAT LAB: BROOKIIAVEN N+

TXC: REG; VIE ULRIKSON ORNL

--'-

N$.ZC. ~ LA PDR 6197 .

ASLB CONSUL'I'ANTS ACRS CYS EN ~ ~

~ ~

y

OgUTIOy 830 Power Building Qgf

,TENNESSEE VALLEY AUTHORITY 0 m CHATTANOOGA. TENNESSEE 37401 cf. Z ,

I

~4

'~~s-i9<~

JUN 15 >976 I'tie

,R,@tetgy Docket Mr. Benard C. Rusche, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

'~f.4'g) "

Washington, DC, 20555 Ju Nl8>676 ~

Near rector

>>

co roraArortr

Dear Mr. Rusche:

r>roe r socrr~

I In the Hatter af the ) Docket Nos. 5 Tennessee Valley Authority ) 0-2 Enclosed are 45 copies of the 44th revision to a document previously submitted on April li, 1975, entitled "Plan for Evaluation, Repair, and Return 'to Service of Browns Ferry Units 1 and 2 (March 22, 1975, Fire)." The gevision consists of the following:

1 Evaluation Plan Materi'al Revised Part Program for Sampling, Analysis, and Cleanup',of Residue on Affected Structures, Systems, and Components This revision includes additional information regarding the surveillance program for electrical cables that have been coated with flame retardant material (Flamemastic 71A).

Instructions. for entering the 44th revision are also included.

C I

Very truly yours, ggCL L L' J. E. Gilleland /

Assistant Manager of Power

~'t t~g Enclosures CC: See page 2 An Equal Opportunity Employer

JUN 15]976 Mr. Benard C. Rusche CC (Enclosures):

Mr. Frank Long Regional Office

'U.S. Nuclear Regulatory Commission 230 Peachtree Street, NM., Suite 818 Atlanta, Georgia 30303 Mr. Norman C. Moseley, Director (3)

Regional Office U.S. Nuclear Regulatory Commission 230 Peachtree Street, %f., Suite 818 Atlanta, Georgia 30303 Mr. Co E. MurPhy Regional Office U.S. Nuclear Regulatory Commission 230 Peachtree Street, NWo, Suite 818 Atlanta, Georgia 30303

. ~ g8gU18tog 'Dock83 FJts PLAN FOR EVALUATION, REPAIR, AND RETURN TO SERVICE OF BROHNS FERRY UNITS 1 AN@ 2 0fARCH 22, 1975, PIRE)

Piling instructions for June 14, 1976, Revision.

Insert Part V, section B, page 37, attachment 5A,, dated 6/9/76

e V ~

Section B Page 37 Attachment 5A Recovery Plan BrÃlP 6/9/76 H. J. Green, Power Plant Superintendent, Browns Perry Nuclear Plant J. B. Calhoun,'hief, Huclear Generation Branch, 702 EB-C BROHi> EL~CTR1CAL CABTZ SUIVTr:ZEJAIiCE PROGRAM w

This memorandum,'~ucplments my memorandum to you dated April 27, 1976, and modifies the test inter'.s sp cificd, 1n that memorandum.

Because of concern of the LtRC that cocooning of the.electrics cables with Planunstic may cause heating and degradation of the cable, TA'<

has coded.tted to.".inspect and test certain celected cable )ac':ets periodic~. An insp ction and test should be cade at the fi"'stand unit 3. refueling outag , at the second uMt 1 refueling outage, thereafter at a~roxhmte3y, 3-year intervals at the nearest unit 1 x'efue31ng outace';

A lcm-voltage ~r'ex cable was selected for sampling since it would continuous3y cary curr"nt of sufficient mgni.udo to produce lo.~-

level heating,'if any. Contro3. and simal cables carry only sms11 intermittent currents which would produce no, or little, heat.

The cable packet~ was selected as the primary indicator of cable degradation. 'Cables PLL1 are s~e conductor, 400-IXM cour, with cross-linseed polyethylene insulation and a pol>-A.nyl chloride 1aczet.

The temperatuxe ratir.-. of the insulat1on is 90' and the tmnerature rating of the,]ac'.sc" is 75 C. Calc~tions baced on the thermal resistance of .t'ice'nsulation, "acket, and appro:M~tcly 100 p rcent of normal current flo;z show that th tern crature differential bet;;con the conductor "nd:~~he'utside of the insu'"ticn is 3.47', and bebreen the conc'uctor'nd the,out"'dc of the gacI:et is 4.73'.

Since the temoeraturc it rath'f the insulation is 15' 1- evident that a~ thex~ degradation,

@eater than if any, of the gacI et, the cable xrl33. be detected first in thc )acket.

J. R. Calhoun, CCF;FVH;C JC