NRR Inspection Budget Trained Inspectors Inspection The guidance in IMC 2515, Appendix A, Each resident inspector and senior resident Risk-Informed Baseline Inspection inspector is qualified through the process under Program, governs the Reactor Oversight U.S. Nuclear Regulatory Commission Inspection Process baseline program. This document Manual Chapter (IMC) 1245, Qualification contains a list of inspection procedures Program for New and Operating Reactor (IPs). Each IP is completed through Programs. After this initial qualification, each samples. Inspectors complete these inspector receives 3-4 weeks of training samples within the resource estimates annually.
noted in the associated IP. On occasion, an inspector or team may need additional time Inspection Preparation to complete the IP. For a 2-unit pressurized-water reactor (PWR), the baseline resource Inspectors maintain awareness of the sites need averages 2,354 hours0.0041 days <br />0.0983 hours <br />5.853175e-4 weeks <br />1.34697e-4 months <br />.
performance through direct observations with plant status (as noted in IMC 2515, Light-Water Reactor Inspection ProgramOperations Inspection Documentation Phase, Appendix D, Plant Status), corrective action program reviews, and other preparation Inspectors document findings in inspection mechanisms: reports. These reports are placed on the NRC Web site at
- Inspectors may prepare for specific https://www.nrc.gov/reactors/operating/oversi inspections, or they may prepare to finish ght/listofrpts-body.html:
actions identified for completion within a quarter.
- Quarterly, the inspector documents inspection findings in an integrated
- In addition to training, each (assigned) inspection report. Team inspections occur inspector spends 7-10 percent (nominally) on a biennial or triennial basis.
of his or her time on support activities.
- Preparation and documentation represent on average 1,480 hours0.00556 days <br />0.133 hours <br />7.936508e-4 weeks <br />1.8264e-4 months <br />.
Inspection Billing Enhancements The NRC is dedicated to improving transparency in its fee billing. In the staff requirements memorandum (SRM) to SECY-15-015, Project Aim 2020 Report and Recommendations (ADAMS Accession No. ML15159A234), the Commission approved staff recommendations intended to simplify how the NRC calculates its fees, improve transparency in the fee billing process, and improve the timeliness of the NRCs communications about fee changes. Since that time, the staff has been actively implementing those improvements. The revised licensee invoice is one major change.
Above is the old bill; at right is the improved bill.