ML19267A394

From kanterella
Revision as of 00:13, 18 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC Staff Unopposed Motion for Extension of Time to File NRC Staff Answer to Beyond Nuclear Motion for Leave to File New Contention and Beyond Nuclear Motion to Reopen
ML19267A394
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/24/2019
From: Matt Young
NRC/OGC
To:
NRC/OCM
SECY RAS
References
50-277-SLR, 50-278-SLR, ASLBP 19-960-01-SLR-BD01, RAS 55322
Download: ML19267A394 (3)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of EXELON GENERATION COMPANY, LLC Docket Nos. 50-277-SLR 50-278-SLR (Peach Bottom Atomic Power Station, Units 2 and 3)

NRC STAFF UNOPPOSED MOTION FOR EXTENSION OF TIME TO FILE NRC STAFF ANSWER TO BEYOND NUCLEAR MOTION FOR LEAVE TO FILE NEW CONTENTION AND BEYOND NUCLEAR MOTION TO REOPEN Pursuant to 10 C.F.R. § 2.323(a), the U.S. Nuclear Regulatory Commission (NRC) staff (Staff) hereby moves for a three-day extension (until October 3, 2019) of time prescribed by 10 C.F.R. § 2.309(i)(1) for answers Beyond Nuclear, Inc.s Motion for Leave to File New Contention1 to coincide with a 10-day response time for answers to Beyond Nuclear, Inc.s Motion to Reopen2. Both Beyond Nuclear filings, dated September 3, 2019, and September 23, 2019, respectively, are pending before the Commission.

As grounds for this motion, the Staff notes that Beyond Nuclear states that the Motion to Reopen supplements its Motion for Leave to File New Contention.3 Because both motions provide arguments related to Beyond Nuclears proposed new contention, the requested 1

Beyond Nuclear Motion for Leave to File New Contention Based on Draft Supplement 10 to Generic Environmental Impact Statement for Subsequent License Renewal of Peach Bottom Operating License (Sept. 3, 2019, as corrected Sept. 5, 2019) (Motion for Leave to File New Contention).

2 Beyond Nuclear Motion to Reopen the Record for Purposes of Considering and Admitting a New Contention Based on Draft Supplement 10 to Generic Environmental Impact Statement for Subsequent License Renewal of Peach Bottom Operating License and Request for Consideration of Some Elements of the Motion Out of Time (Sept. 23, 2019) (Motion to Reopen). See 10 C.F.R.

§ 2.323(c).

3 Motion to Reopen at 1.

extension will allow the Staff to answer both motions in an integrated fashion. Also, the brief extension is in the interest of fairness due to the difference in Beyond Nuclears filing dates, and will assist administrative efficiency.

The undersigned counsel is authorized to state that Counsel for Beyond Nuclear does not oppose the instant motion. Counsel for Exelon consents to this motion, provided that Exelon is granted the same extended filing deadline.

Respectfully submitted,

/Signed (electronically) by/

Mitzi A. Young Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 287-9178 E-mail: Mitzi.Young@nrc.gov Dated at Rockville, Maryland this 24th day of September 2019

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of EXELON GENERATION COMPANY, LLC Docket Nos. 50-277-SLR 50-278-SLR (Peach Bottom Atomic Power Station, Units 2 and 3)

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing NRC STAFF UNOPPOSED MOTION FOR EXTENSION OF TIME TO FILE NRC STAFF ANSWER TO BEYOND NUCLEAR MOTION FOR LEAVE TO FILE NEW CONTENTION AND BEYOND NUCLEAR MOTION TO REOPEN, dated September 24, 2019, have been filed through the Electronic Information Exchange, the NRCs E-Filing System, in the above-captioned proceeding, this 24th day of September 2019.

/Signed (electronically) by/

Mitzi A. Young Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O14-A44 Washington, DC 20555 Telephone: (301) 287-9178 E-mail: Mitzi.Young@nrc.gov Dated at Rockville, Maryland this 24th day of September 2019