ML19210D061

From kanterella
Revision as of 17:12, 9 September 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposes Tech Spec Change 79-8 to DPR-35 Re Core Spray & Containment Cooling Sys.Change Optimizes Critical Path Time During Refueling & Other Outages by Performing Work Items in Parallel Sequence Rather than in Series.Revised Pages Encl
Date released: 08/12/2019 Download: ML19210D061


Proposes Tech Spec Change 79-8 to DPR-35 Re Core Spray & Containment Cooling Sys.Change Optimizes Critical Path Time During Refueling & Other Outages by Performing Work Items in Parallel Sequence Rather than in Series.Revised Pages Encl
ML19210D064
Person / Time
Site: Pilgrim
Issue date: 11/13/1979
From:
BOSTON EDISON CO.
To:
References
Download: ML19210D064 (7)
Proposes Tech Spec Change 79-8 to DPR-35 Re Core Spray & Containment Cooling Sys.Change Optimizes Critical Path Time During Refueling & Other Outages by Performing Work Items in Parallel Sequence Rather than in Series.Revised Pages Encl
ML19210D060
Person / Time
Site: Pilgrim
Issue date: 11/13/1979
From: Howard J
BOSTON EDISON CO.
To: IPPOLITO T A
Office of Nuclear Reactor Regulation
References
Download: ML19210D060 (2)