ML090120669
Person / Time
Issue date: 01/29/2009
From: Mcginty T
Division of Policy and Rulemaking
To:
Hawes C, NRR/DPR/PGCB, 415-1316
References
RIS-09-002
Download: ML090120669 (6)


See also: RIS 2009-02

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, DC 20555-0001

January 29, 2009

NRC REGULATORY I

SSUE SUMMARY 2009-02

USE OF CONTAINMENT ATMOSPHERE GASEOUS RADIOACTIVITY

MONITORS AS REACTOR COOLAN

T SYSTEM LEAKAGE DETECTION

EQUIPMENT AT NUCLEAR

POWER REACTORS

ADDRESSEES

All holders of operating licenses for nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor

vessel. All current and potential applicants for a combined license, manufacturing license, standard

design certification, or standard design approval for a nuclear power plant under the provisions

of Title 10 of the Code of Federal Regulations, Part 52 (10 CFR), "Licenses, Certifications, and

Approvals for Nuclear Power Plants".

All applicants for nuclear power plant construction permits and operating licenses under the provisions of 10 CFR Part 50, "Domestic Licensing of Production and Utilization Facilities."

INTENT The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS) to communicate the NRC plan to address the situation created when some containment

atmosphere gaseous radioactivity monitors are unable to meet technical specification (TS)

requirements. The plan consists of integrating a streamlined license amendment process with

the use of enforcement discretion, where appropriate. This RIS requires no action or written response on the part of an addressee.

BACKGROUND INFORMATION

In order to meet General Design Criterion 30, "Quality of reactor coolant pressure boundary," of Appendix A to 10 CFR Part 50, licensees typically include RCS leakage detection equipment in their plant designs because the equipment can be used to detect reactor coolant pressure

boundary (RCPB) leakage. A typical RCS leakage detection system consists of a combination

of the following:

  • a containment atmosphere particulate radioactivity monitoring system
  • a containment atmosphere gaseous radioactivity monitoring system
  • containment sump-level and sump-pump instrumentation
  • containment cooler condensate monitoring instrumentation

ML090120669

RIS 2009-02

Page 2 of 5 Containment atmosphere gaseous radioactivity monitoring systems measure RCS leakage indirectly by detecting airborne radioactivity released from RCS leakage. Response time is the

length of time required for these monitoring systems to detect a given volume of RCS leakage.

Response time is dependant on RCS radioactivity concentration, as well as other variables. For a given volume of leakage, with all other variables held constant, a higher RCS radioactivity

concentration will yield a shorter response time for these monitoring systems. The design analyses for the containment atmosphere gaseous radioactivity monitoring systems used in the licensing bases for most plants typically assume a RCS radioactivity concentration

approximately equivalent to 0.1 percent failed fuel in the core. Improvements in fuel cladding integrity and RCS chemistry controls have significantly reduced RCS radioactivity concentration at most plants. As a result, the monitors for operating units may have longer response times than they would with 0.1 percent failed fuel in the core because the actual RCS radioactivity concentration is less than it would be with 0.1 percent failed fuel in the core.

Most plants have TS Limiting Conditions fo

r Operation requirements for containment atmosphere gaseous radioactivity monitoring systems used as part of RCS leakage detection

equipment. The TS requirements for the monito

ring systems' response times are based on the design analysis that is part of a plant's licensing basis. If the monitors fail to meet these requirements, the monitors are inoperable. When the monitors are inoperable the licensee is required to take remedial actions as permitted by their TS or to shut down the reactor.

Information Notice (IN) 2005-24, "Nonconservatism in Leakage Detection Sensitivity" (ADAMS Accession No. ML051780073), communicated the issue created by differences

between actual and assumed RCS radioactivity concentrations to all licensees. The purpose of IN 2005-24 was to have licensees review information related to problems with containment

atmosphere gaseous radioactivity monitors used as part of RCS leakage detection equipment and consider appropriate actions as applicable to their plants. Information Notices do not

require any action by licensees.

In September 2008, NRC inspectors at the Diabl

o Canyon Power Plant identified a non-cited violation for not complying with TS requirements for RCS leakage detection equipment. In

November 2008, the licensee for the Watts Bar Nuclear Plant and the Sequoyah Nuclear Plant requested exigent license amendments from the NRC after taking remedial actions as permitted by their TS because of a concern that the containment atmosphere gaseous radioactivity monitor channels of the RCS leakage detection system were inoperable.

To address the issue, licensees working through the industry-sponsored Technical

Specifications Task Force (TSTF) have attempted to create generic TS changes, model License Amendment Requests (LARs), model safety evaluations, and model proposed

no-significant-hazards consideration determinations using the NRC TS Consolidated Line Item Improvement Process (CLIIP). See RIS 2000-10, "Consolidated Line Item Improvement Process For Adopting Standard Technical Specifications Changes for Power Reactors

" (ADAMS Accession No. ML003693442) for more information on the NRC CLIIP.

RIS 2009-02

Page 3 of 5 SUMMARY OF ISSUE

Improvements in fuel cladding integrity and RCS chemistry controls result in lower RCS

radioactivity concentrations during operational activities, including situations where there is RCS leakage. Thus, containment atmosphere gaseous radioactivity monitoring systems which are

designed on the basis of higher assumed RCS radioactivity concentrations will not provide accurate indication of RCS leakage in the required length of time due to the longer response time of the monitoring system, and must be considered inoperable.

The NRC considers the longer response times of the containment atmosphere gaseous

radioactivity monitors to be of very low safety significance. The monitors would still be able to detect degradation in the RCPB long before components fail in a manner that would affect plant safety. Additionally, plants also have multiple diverse and redundant methods available to

detect RCS leakage and to provide licensees with a means to detect significant RCPB

degradation and to take appropriate action to ensure the continued protection of public health

and safety. Finally, nuclear power plants are designed to provide adequate core cooling following postulated loss-of-coolant accidents up to and including a break equivalent in size to

the double-ended rupture of the largest pipe in the RCS. This design feature, coupled with the

extremely low likelihood of unstable crack growth resulting in a loss-of-coolant accident, leads

the NRC to conclude that the risk signifi

cance of this issue is very low.

The NRC plans to address the issue of inoperable containment atmosphere gaseous

radioactivity monitoring systems in an integrated fashion by: (i) working with the TSTF to develop revised generic TS for the monitoring system, and facilitating licensee implementation of the revised generic TS through a streamlined license amendment process; and (ii) issuing guidance on NRC's exercise of enforcement

discretion involving inoperable containment atmosphere gaseous radioactivity monitoring systems.

The NRC will review the generic TS changes that the TSTF proposes for pressurized-water

reactors (PWRs) and boiling-water reactors (BWRs). If the generic TS changes are found to be

acceptable, the NRC will make the generic model

LARs, model safety evaluations, and model

no-significant-hazards consideration determinations available to licensees using the NRC CLIIP. Licensees are free to submit LARs for TS changes to address the issue. If licensees deem further action regarding the issue is unwarranted, they can choose to take no action.

On November 14, 2008, the TSTF submitted TSTF-513, "Revise Operability Requirements and

Actions for RCS Leakage Instrumentation," to the NRC for review. TSTF-513 proposes generic

TS changes for PWRs. The TSTF plans to submit TSTF-514 to the NRC in January 2009. TSTF-514 will propose generic TS changes for BWRs. Licensees are free to submit LARs to address the issue using TSTF-513 or TSTF-514; or they can propose alternative solutions.

In certain circumstances involving inoperable containment atmosphere gaseous radioactivity monitoring systems, enforcement discretion is available. Specific guidance for this enforcement discretion is described in EGM-09-001

(ADAMS Accession No.

ML090300467) and is available

on the NRC's web site at www.nrc.gov

.

RIS 2009-02

Page 4 of 5 BACKFIT DISCUSSION

The intent of this RIS is to inform addressees of the NRC's plan to address the failure of

containment atmosphere gaseous radioactivity monitors used as RCS leakage detection

equipment to meet TS requirements.

The staff is not imposing any new positions on licensees. This RIS is not providing any new

regulatory positions. This RIS only conveys the NRC's plan to address the issue of RCS leakage detection equipment failing to meet TS requirements because of the difference between actual and assumed RCS radioactivity concentrations. This RIS requires no action or written response and, therefore, is not a backfit under 10 CFR 50.109, "Backfitting." Consequently, the staff did not perform a backfit analysis.

FEDERAL REGISTER NOTIFICATION

A notice of opportunity for public comment on this RIS was not published in the

Federal Register

because it is informational and pertains to a staff position that does not represent a departure from current regulatory requirements and practice. However, a public meeting to discuss this

RIS was held on January 8, 2009. The meeting summary is available under ADAMS Accession

No. ML090130583. The NRC intends to work with industry representatives, members of the

public, and other stakeholders in developing final guidance and in modifying related guidance

documents.

CONGRESSIONAL REVIEW ACT

This RIS is not a rule as designated by the Congressional Review Act (5 U.S.C. §§ 801-808) and, therefore, is not subject to the Act.

PAPERWORK REDUCTION ACT STATEMENT

This RIS does not contain any information collections and, therefore, is not subject to the requirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501, et seq.).

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a currently valid OMB control number.

RIS 2009-02

Page 5 of 5 CONTACT Please direct any questions about this matter to the technical contact listed below or to the

appropriate Office of Nuclear Reactor Regulation (NRR) project manager.

/RA by Theodore R. Quay For/

Timothy J. McGinty, Director

Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

Technical Contact: Matthew Hamm, NRR 301-415-1472

e-mail: matthew.hamm@nrc.gov

Note: NRC generic communications may be found on the NRC public Web site,

http://www.nrc.gov, under Electronic Reading Room/Document Collections.

RIS 2009-02

Page 5 of 5 CONTACT Please direct any questions about this matter to the technical contact listed below or to the

appropriate Office of Nuclear Reactor Regulation (NRR) project manager.

/RA by Theodore R. Quay For/

Timothy J. McGinty, Director

Division of Policy and Rulemaking

Office of Nuclear Reactor Regulation

Technical Contact: Matthew Hamm, NRR 301-415-1472

e-mail: matthew.hamm@nrc.gov

Note: NRC generic communications may be found on the NRC public Web site, http://www.nrc.gov, under Electronic Reading Room/Document Collections.

ADAMS ACCESSION No. ML090120669 OFFICIAL RECORD COPY

O FFICE

ITSB:DIRS

Tech Editor BC:ITSBDIRS

D:DIRS PSPB DPR

BC:PSPB DPR

NAME MHamm via email

RElliott FBrown MCheok for

JWilliams

SRosenberg

DNelson for

D ATE 12/19/2008

12/15/2008

1/12/2009 1/12/2009 12/30/2008

12/30/2008

O FFICE D:DSS D:DORL

RI:DRP:D

RII:DRP:D

RIII:DRP:D

RIV:DRP:D

NAME WRuland for JGiitter

DLew via email LWert via

email CPederson

via email DChamberlain

via email

D ATE 1/12/2009 12/30/2008

1/15/2009

1/14/2009 1/13/2009 1/15/2009

OFFICE

D:DCI BC:CHPB DCIP D: DCIP/NRO

OE

OGC (NLO)

OGC (CRA)

NAME MEvans TFrye CHinson for

GTracy DStarkey via email

BJones NSanchez via email

DATE 1/15/2009 0 1/07/2009

01/08/2009

1/14/2009 01/27/2009

1/28/2009

OFFICE

P MDA

OIS LA:PGCB PGCB BC: PGCB D:DPR NAME

LHill GTrussell

CHawes

SStuchell

MMurphy TMcGinty TRQ

for

DATE 01/05/2009

01/07/2009

1/28/2009

1/28/2009

1/29/2009