|
---|
Category:NRO Safety Evaluation Report (SER)-Delayed
MONTHYEARML19171A2932019-06-27027 June 2019 ABWR DC Renewal Issue 18b Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis Rev 4 ML19162A0782019-06-26026 June 2019 ABWR DC Renewal Issue 09 SE Section 6.2.1.9 ECCS Strainers Rev 5 ML19155A2072019-06-25025 June 2019 ABWR DC Renewal Issue 38 SE Section 6.3 ECCS Rev 3 ML19148A4632019-06-19019 June 2019 ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications Revision 3 ML19162A0802019-06-19019 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 09 Section 6.2.1.9 ECCS Strainers ML19148A7802019-06-19019 June 2019 ABWR DC Renewal Issue 26 Section 7.4.1.4.4 Shutdown Panel Inst Rev 4 ML19148A5162019-06-19019 June 2019 ABWR DC Renewal Issue 26 Section 5.4.7 RHR Rev 5 ML19141A3742019-06-19019 June 2019 ABWR DC Renewal SER Section 22 Fukushima Design Related Changes Revision 5 ML19114A3652019-06-19019 June 2019 ABWR DC Renewal SER Section 7.5.2.1 Post Accident Monitoring System Pointer SER Rev 3 ML19114A3532019-06-19019 June 2019 ABWR DC Renewal SER Section 9.1.3 Fuel Pool Cooling and Cleanup System Pointer SER Rev 4 ML19113A1732019-06-19019 June 2019 ABWR DC Renewal SER Section 3.2.3 Safety Classifications Pointer SER Rev 4 ML19148A4612019-06-12012 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 16 Technical Specifications ML19141A3712019-06-0606 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SE for Section 22 Fukushima Design Related Changes ML19148A5152019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 5.4.7 Residual Heat Removal System ML19148A7782019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 7.4.1.4.4 Shutdown Panel ML19149A3152019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 26 SER for Section 8.3.4.4 Class 1E Bus Isolation ML19114A3512019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 9.1.3 Fuel Pool Cooling and Cleanup System Revision 0 ML19114A3382019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 7.5.2.1 Post Accident Monitoring Revision 0 ML19113A1762019-06-0505 June 2019 Letter to Applicant - GEH ABWR DC Renewal Issue 27 SE for Section 3.2.3 Safety Classifications Revision 0 ML18052A9252019-02-0808 February 2019 ABWR SER Subsection 6.2.1.3 ML18324A7472019-02-0707 February 2019 GEH ABWR DC Renewal SE for Subsections 8.2.5 and 8.3.3 ML18346A6092019-01-15015 January 2019 ABWR DC Renewal SE Section 5.4.8 Reactor Water Cleanup System ML19002A3912019-01-15015 January 2019 Letter to Applicant - GEH ABWR DC Renewal SE for Subsections 8.2.5 and 8.3.3.17 ML19002A3932019-01-11011 January 2019 Memo to ACRS - GEH Advanced Boiling Water Reactor DC Renewal Safety Evaluation for Subsections 8.2.5 and 8.3.3.17 ML18346A5612018-12-19019 December 2018 Letter to Applicant - GEH ABWR DC Renewal Issue 10 SE for Section 5.4.8 ML18312A1642018-12-0404 December 2018 Memo - GEH ABWR DC Renewal Safety Evaluation for Section 19.1, Probabilistic Risk Assessment ML18312A1622018-12-0404 December 2018 Safety Evaluation - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18312A1632018-12-0404 December 2018 Letter to Applicant - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18275A3512018-11-15015 November 2018 ABWR DC Renewal SER Sect 19G-5 Aia Evaluation ML18029A1302018-07-26026 July 2018 Chapter 3, Seismic Subsystem Analysis, Section 3.7.3, GEH Advanced Boiling Water Reactor DC Renewal ML18096A0462018-07-23023 July 2018 ABWR DC Renewal SER Section 9.1.1 - New Fuel Storage ML18096A0592018-07-23023 July 2018 ABWR DC Renewal SER Section 9.1.5 - Heavy Load Cranes ML18096A1202018-07-23023 July 2018 ABWR DC Renewal SER Section 9.1.4 - Light Load Handling ML18046A9922018-07-0202 July 2018 Chapter 13, Plant Procedures, Section 13.5 Safety Evaluation with No Open Items, GEH Advanced Boiling Water Reactor DC Renewal ML18057A4802018-06-21021 June 2018 ABWR DC Renewal SE Section 13.3 - Emergency Planning ML18026A6672018-06-20020 June 2018 Advanced Boiling Water Reactor Safety Evaluation, Section 3.3 - Tornado and Hurricane Loadings ML18026A7502018-06-20020 June 2018 Advanced Boiling Water Reactor DC Renewal Safety Evaluation Section 2.3 - Meteorology ML18052A1372018-05-0707 May 2018 ABWR DC Renewal SER Section 5.2.5 Low Level Reactor Coolant Leakage Rev 2 ML17354A8142018-03-0808 March 2018 Chapter 9.5.1, Fire Protection System, Safety Evaluation with No Open Items, GEH Advanced Boiling Water Reactor DC Renewal 2019-06-06
[Table view] |
Text
6.2.1.9Containment Debris Protection for ECCS Strainers Regulatory Criteria
Code of Federal Regulations
"After any calculated successful initial operation of the ECCS, the calculated core temperature shall be maintained at an acceptably low value and decay heat shall be removed for the extended period of time required by the long-lived radioactivity remaining in the core."
- 6.2.1.9.2Summary of Technical Information
6.2.1.9.3Technical Evaluation
Chemical Effects Introduction/
Background:
Applicant's Approach to Addressing Chemical Effects
Staff Evaluation of Chemical Effects
- Chemical Effects Evaluation Summary
ECCS Systems and Components Post-LOCA Fluid Constituents RHR, HPCF, and RCIC Pump Evaluation
Heat Exchanger Evaluation
Blockage Evaluation for Components Such as Valves, Orifices, Pipes, and Spray Nozzles/Spargers
Instrument Tubing Blockage Evaluation Wear Evaluation for Components Such as Pumps, Valves, Orifices, Pipes and Spray Nozzles/Spargers
Debris Settling Evaluation for Valves, Orifices, Pipes, and Spray Nozzles Chemical Effects Evaluation for Ex-Vessel Downstream Components
Introduction/Background
Applicant's Approach for Addressing In-vessel Downstream Effects
Staff Evaluation of In-vessel Downstream Effects
Conclusion