GE-Hitachi Nuclear Energy Americas, LLC - License Amendment Request - Revision to Radiological Emergency Plan (REP)
ML19182A198
Person / Time
Site:
Issue date: 07/01/2019
From: Murray S
GE-Hitachi Nuclear Energy Americas
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML19182A197 List:
References
M190099
Download: ML19182A198 (2)


Text

.) HITACHI Security Related and Proprietary Information Notice Attachments 1, 2, 3 and 4 to this letter contain GE Hitachi Nuclear Energy security related and proprietary information which is to be withheld from public disclosure in accordance with 10 CFR 2.390. Upon removal of these attachments, the balance of this letter may be made public. M190099 July 1, 2019 Director of the Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555-001 Attn: Document Control Desk GE Hitachi Nuclear Energy Scott P. Murray Manager, Facility Licensing 3901 Castle Hayne Road P.O. Box780 Wilmington, NC 28402 USA T (910) 819-5950 scott.murray@ge.com

Subject:

License Amendment Request -Revision to Radiological Emergency Plan (REP)

References:

1) NRC License R-33, Docket 50-73 2) NRC License DPR-1, Vallecitos Boiling Water Reactor (VBWR), Docket 50-18 3) NRC License DR-10, ESADA Vallecitos Experimental Superheat Reactor (EVESR), Docket 50-183, 4) NRC License TR-1, General Electric Test Reactor (GETR), Docket 50-70 5) GEH/NRC Telecom, 5/28/19

Dear Sir or Madam:

As discussed with NRC Staff on May 28, 2019 (Reference 5), the GE Hitachi Nuclear Energy, L.LC. (GEH) Vallecitos Nuclear Center (VNC) hereby submits a revised Radiological Emergency Plan (REP) dated June 2019. The REP changes have been internally reviewed and some of the changes are documented as those that reduce the plan effectiveness and require prior NRC approval in accordance with 1 O CFR 50.54(q).

GEH requests approval of the revised REP with an additional condition to NRC License R-33 (Reference 1 ). There is no specific VNC license condition or safety analysis report section describing the REP in the VNC shutdown reactor licenses (References 2, 3, and 4). A description and reason for each change to the VNC REP is provided in Attachment 1 to this letter. A reduction in effectiveness evaluation is provided in Attachment 2 to this letter. A comparison to the applicable NRC Standard Review Plan (SAP) guidance document (NUREG 0849) is provided in Attachment 3 to this letter. The revised VNC REP is provided in Attachment 4 to this letter. GEH requests that Attachments 1, 2, 3 and 4 to this letter be withheld from public disclosure under 1 O CFR 2.390 as they contain sensitive security related and proprietary information associated with our Emergency Planning and Response Program.

M190099 U.S. Nuclear Regulatory Commission July 1, 2019 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on June 19, 2019. Please contact me at 910-819-5950 if you have any questions or would like to discuss this matter further. Sincerely, Scott Murray, Manager Facility Licensing Attachment 1: VNC Current to Proposed Emergency Plan Review Attachment 2: VNC REP Reduction in Effectiveness Evaluation Attachment 3: VNC NUREG 0849 Standard Review Plan Assessment Attachment 4: VNC REP dated June 2019 cc: D. Hardesty, NRC NRA J. Parrott, NRC NMSS SPM 19-013