ML18016A311

From kanterella
Revision as of 17:12, 25 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards LER 98-001-00,describing Potential Failure Scenario That Could Render SG pre-heater Bypass Isolation Valves Inoperable & Result in Operation of Plant Outside Design Basis
Date released: 08/31/2018 Download: ML18016A311


Forwards LER 98-001-00,describing Potential Failure Scenario That Could Render SG pre-heater Bypass Isolation Valves Inoperable & Result in Operation of Plant Outside Design Basis
ML18016A313
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/09/1998
From: Verrilli M
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18016A313 (4)
Forwards LER 98-001-00,describing Potential Failure Scenario That Could Render SG pre-heater Bypass Isolation Valves Inoperable & Result in Operation of Plant Outside Design Basis
ML18016A310
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/09/1998
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18016A310 (2)