ML15033A091
| ML15033A091 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/28/2015 |
| From: | Brabec R Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML15033A091 (3) | |
Text
J SOUTHERN CALIFORNIA EDISON An EDISON INTERNATIONALS)
Company Richard C. Brabec Principal Manager, Nuclear Regulatory Affairs and Emergency Planning January 28, 2015 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Docket Nos. 50-361 and 50-362 Updated Final Safety Analysis Report and Updated Fire Hazard Analysis, Revised Submittal Date San Onofre Nuclear Generating Station, Units 2 and 3 1) Letter from T. J. Palmisano (SCE) to U. S. Nuclear Regulatory Commission (Document Control Desk) dated September 17, 2014,
Subject:
Docket Nos. 50-361 and 50-362, Updated Final Safety Analysis Report Chapter 15, San Onofre Nuclear Generating Station, Units 2 and 3
Reference:
Dear Sir or Madam:
In Reference 1 Southern California Edison (SCE) submitted a revision to Chapter 15 of the Updated Final Safety Analysis Report (UFSAR) for San Onofre Nuclear Generating Station (SONGS), Units 2 and 3 which summarized the evaluations of the design basis accident analyses that are applicable to the permanently defueled condition.
In addition, Reference 1 provided a commitment to submit by January 31, 2015 a revision of the SONGS Units 2 and 3 UFSAR that incorporates UFSAR changes made prior to September 1, 2014 to reflect the SONGS Units 2 and 3 permanently defueled plant condition.
The submittal date for the revised SONGS Units 2 and 3 UFSAR is hereby changed to February 13, 2015.There is one revised commitment contained in this letter.Should there be any questions regarding this submittal, please contact Ms. Andrea Sterdis at (949)368-9985.Attachment 1: Revised List of Commitments cc: M. Dapas, Regional Administrator, NRC Region IV T. J. Wengert, NRC Project Manager, San Onofre Units 2 and 3 S. Y. Hsu, California Department of Health Services, Radiologic Health Branch P.O. Box 128 San Clemente, CA 92672 (949) 368-7418 PAX 87418 Fax: (949) 368-7575 John.Brabec@sce.comn A053 Attachment 1 Revised List of Commitments Commitment One-Time Sustainable Scheduled Completion Action Action Date Submit a revision of the SONGS Units 2 and 3 UFSAR that will incorporate UFSAR changes that were made prior to September 1, 2014 to reflect the SONGS Units 2 and 3 permanently defueled plant condition February 13, 2015 x