Similar Documents at Fermi |
---|
Category:NRC Preliminary Notification of Event/Occurrence
MONTHYEARPNO-III-18-003A, Unplanned Shutdown Greater than 72 Hours Following a Loss of Station System Transformer 64 and Subsequent Reactor Scram - Update2018-05-0808 May 2018 PNO-III-18-003A: Unplanned Shutdown Greater than 72 Hours Following a Loss of Station System Transformer 64 and Subsequent Reactor Scram - Update PNO-III-18-003, A: Unplanned Shutdown Greater than 72 Hours Following a Loss of Station System Transformer 64 and Subsequent Reactor Scram - Update2018-05-0808 May 2018 PNO-III-18-003A: Unplanned Shutdown Greater than 72 Hours Following a Loss of Station System Transformer #64 and Subsequent Reactor Scram - Update PNO-III-18-003, Unplanned Shutdown Greater than 72 Hours Following a Loss of Station System Transformer 64 and Subsequent Reactor Scram2018-04-17017 April 2018 PNO-III-18-003: Unplanned Shutdown Greater than 72 Hours Following a Loss of Station System Transformer 64 and Subsequent Reactor Scram ML18107A7002018-04-17017 April 2018 PNO-III-18-003: Unplanned Shutdown Greater than 72 Hours Following a Loss of Station System Transformer #64 and Subsequent Reactor Scram ML15275A2832015-10-0202 October 2015 Update: Unplanned Shutdown Greater than 72 Hours Following the Loss of Cooling Water in the Turbine Building PNO-III-15-009, Fermi, Unit 2: Unplanned Shutdown Greater than 72 Hours Following the Loss of Cooling Water in the Turbine Building2015-09-15015 September 2015 PNO-III-15-009 - Fermi, Unit 2: Unplanned Shutdown Greater than 72 Hours Following the Loss of Cooling Water in the Turbine Building PNO-III-15-005, A - Update: Unplanned Shutdown Greater than 72 Hours Following a Cooling Water Leak in Containment2015-04-0606 April 2015 PNO-III-15-005A - Update: Unplanned Shutdown Greater than 72 Hours Following a Cooling Water Leak in Containment ML15083A4772015-03-24024 March 2015 PNO-III-15-005: Fermi Unit 2, Unplanned Shutdown Greater than 72 Hours Following Cooling Water Leak in Containment PNO-III-12-016, A, Fermi Nuclear Power Plant, Unit 2 - Update: Unplanned Shutdown Greater than 72 Hours Due to Hydrogen In-Leakage to the Stator Water Cooling System2013-01-0404 January 2013 PNO-III-12-016A, Fermi Nuclear Power Plant, Unit 2 - Update: Unplanned Shutdown Greater than 72 Hours Due to Hydrogen In-Leakage to the Stator Water Cooling System ML12318A3842012-11-13013 November 2012 PNO-III-12-016 November 2012 PNO-III-12-011, A - Update - Unplanned Shutdown Greater than 72 Hours Due to Loss of the 120 Kilovolt Switchyard2012-09-20020 September 2012 PNO-III-12-011A - Update - Unplanned Shutdown Greater than 72 Hours Due to Loss of the 120 Kilovolt Switchyard ML12262A4592012-09-18018 September 2012 PNO-III-12-011: Fermi Nuclear Power Plant, Unit 2, Unplanned Shutdown Greater than 72 Hours Due to Loss of the 120 Kilovolt Switch Yard PNO-III-12-006, A - Update - Unplanned Scram on June 25, 2012, Due to Loss of Reactor Feed Pump2012-07-30030 July 2012 PNO-III-12-006A - Update - Unplanned Scram on June 25, 2012, Due to Loss of Reactor Feed Pump ML12180A4972012-06-28028 June 2012 PNO-III-12-006, Fermi Unplanned Scram on June 25, 2012, Due to Loss of Reactor Feed Pump PNO-III-10-009, A; Update - Fermi 2 Alert and Unplanned Shutdown for Greater than 72 Hours2010-06-17017 June 2010 PNO-III-10-009A; Update - Fermi 2 Alert and Unplanned Shutdown for Greater than 72 Hours ML1015805362010-06-0707 June 2010 PNO-III-10-009: Fermi Power Plant, Unit 2, Alert and Unplanned Shutdown for Greater than 72 Hours PNO-III-10-004, A - Fermi - Update - Fermi 2 Scram and Unplanned Shutdown for Greater than 72 Hours2010-03-31031 March 2010 PNO-III-10-004A - Fermi - Update - Fermi 2 Scram and Unplanned Shutdown for Greater than 72 Hours ML1008900522010-03-30030 March 2010 PNO-III-10-004 - Fermi 2, Scram and Unplanned Shutdown for Greater than 72 Hours PNO-III-09-009, A, Update - Fermi 2 Unplanned Shutdown for Greater than 72 Hours to Repair Hydrogen In-Leakage2009-11-12012 November 2009 PNO-III-09-009A, Update - Fermi 2 Unplanned Shutdown for Greater than 72 Hours to Repair Hydrogen In-Leakage ML0927407872009-10-0101 October 2009 PNO-III-09-009, Fermi 2 Unplanned Shutdown for Greater than 72 Hours to Repair Hydrogen In-Leakage PNO-III-08-005, Fermi 2, Partial Loss of Annunciators in Control Room, Monitoring Mode2008-06-13013 June 2008 PNO-III-08-005, Fermi 2, Partial Loss of Annunciators in Control Room, Monitoring Mode PNO-III-07-010, A - Unusual Event Terminated at Fermi and Special Inspection Team Dispatched2007-10-15015 October 2007 PNO-III-07-010A - Unusual Event Terminated at Fermi and Special Inspection Team Dispatched ML0728511312007-10-12012 October 2007 PNO-III-07-010 - Unusual Event Declared at Fermi Due to Unexpected Piping Hole and Indentations PNO-III-06-018, Fermi 2 Reactor Shutdown and Unusual Event2006-08-0202 August 2006 PNO-III-06-018: Fermi 2 Reactor Shutdown and Unusual Event PNO-III-05-010, Fermi: Forced Outage Due to Reactor Building Closed Cooling Water System Leak in the Drywell2005-06-27027 June 2005 PNO-III-05-010: Fermi: Forced Outage Due to Reactor Building Closed Cooling Water System Leak in the Drywell PNO-III-05-001, Fermi 2, Manual Scram Due to Unidentified Leakage in Drywell2005-01-25025 January 2005 PNO-III-05-001: Fermi 2, Manual Scram Due to Unidentified Leakage in Drywell PNO-III-04-009, Fermi Shuts Down to Repair Emergency Diesel Generator2004-08-0909 August 2004 PNO-III-04-009: Fermi Shuts Down to Repair Emergency Diesel Generator 2018-05-08
[Table view] |
Text
PRELIMINARY NOTIFICATION - REGION III
October 2, 2015 1 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE
- PNO-III-15-009A
This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. Some of the information may not yet be fully verified or evaluated and is basically all that is known by the Region III staff on this date.
Facility Fermi Power Plant (Fermi 2) DTE Energy Company Newport, MI Docket: 50-341 License: NPF-43 Licensee Emergency Classification Notification of Unusual Event Alert Site Area Emergency General Emergency X Not Applicable
SUBJECT:
UPDATE: UNPLANNED SHUTDOWN GREATER THAN 72 HOURS FOLLOWING THE LOSS OF COOLING WATER IN THE TURBINE BUILDING Following a manual shutdown, Fermi was not restarted but began a planned refueling outage on September 27, 2015. Because the reactor shutdown had occurred so close to the previously scheduled start of the refueling outage, the licensee decided to keep the reactor shut down.
Operators had shut down the plant on September 13 after attempts to correct a malfunction of a nonsafety-related cooling water system in the turbine building were unsuccessful and the three pumps in the system shut down.
The U.S. Nuclear Regulatory Commission (NRC) resident inspector and a region-based inspector monitored the licensee's investigation and repair activities following the shutdown. The NRC is currently monitoring the refueling outage.
This preliminary notification is issued for information only.
Region III received initial notification of the occurrence by a telephone call shortly after the event via Event notification 51391 The information presented herein has been discussed with the licensee, and is current as of 10:20 a.m. (CDT), October 2, 2015.
ADAMS Accession Number ML15275A283 .
CONTACT: Michael Kunowski 630-829-9618 michael.kunowski@nrc.gov