NL-17-080, Operator Licensing Examination Data
| ML17187A139 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 06/28/2017 |
| From: | Vitale A Entergy Nuclear Northeast |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-17-080, RIS 2017-03 | |
| Download: ML17187A139 (4) | |
Text
- -=---* Entergx NL-17-080 June 28, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
Operator Licensing Examination Data Indian Point Unit Nos. 2 and 3 Docket Nos. 50-247, 50-286 DPR-26, DPR-64 Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box249 Buchanan, NY 10511-0249 Tel (914) 254-6700 Anthony J Vitale Site Vice President
References:
- 1. NRC Regulatory Issue Summary 2017-03, "Preparation and Scheduling of Operator Licensing Examinations," dated April 5, 2017 2. Entergy Letter NL-16-073 to NRC, "Operator Licensing Examination Data," dated July 7, 2016(ML16197A267)
Dear Sir or Madam:
In accordance with the request of Reference 1, enclosed are the NRC Form 536, "Operator Licensing Examination Data," providing estimates of the number of examinations Indian Point Energy Center (IPEC) intends to prepare and the nt.-!mber of examinations IPEC will request the Nuclear Regulatory Commission (NRC) to prepare during calendar years (CYs) 2019 through 2021. Included is an estimate of the number of applicants to be tested for each examination and the proposed primary and alternate examination dates. The information provided in the
- enclosures of this letter updates the information previously provided in Reference
- 2. I Entergy is making no commitments in this letter. Should you have any questions regarding this matter, please contact Mr. Robert R. Suneson, Operations Training, at 914-254-2635.
Sincerely, AJV/cdm NL-17-080 Page 2 of 2
Enclosures:
NRC Form 536, "Operator Licensing Examination Data," for Indian Point Unit Nos. 2 and 3 cc: Mr. Daniel H. Dorman Regional Administrator Region 1 ' U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, Pennsylvania 19406-2713 Mr. Donald Jackson Region 1 U.S. Nuclear Regulatory Commission Resident Inspector's Office U.S. Nuclear Regulatory Commission Indian Point Energy Center NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)
.;,Y.,,.'AAE'Gu<.,>.
Estimated burden per response to comply with this voluntary infonnation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This .. o., OPERA TOR LICENSING infonnation collection is used to plan budgets and resources for operator examinations.
Send It/ comments regarding burden estimate to the FOIA, Privacy, and lnfonnation Collections Branch (T-5 n .. 0 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to '(; c EXAMINATION DATA .. lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of lnfonnation and Regulatory Affairs, f
"' NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means ........ used to impose an infonnation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonnation collection.
FACILITY NRC REGION Indian Point 2 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2019 CY2020 CY2021 CY2022 --------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS
- 8. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2019 CY2020 CY2021 CY2022 ---------NUMBER OF REACTOR 5 0 0 0 OPERATORS NUMBER OF SENIOR REACTOR 7 0 0 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 2/4/2019 ALTERNATE DATE 2/11/2019
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY CY ---NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF CANDIDATES NRC FORM 536 (05-2016)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) ,y.***o.,4 Estimated burden per response to comply with this voluntary infonnation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Jo OPERA TOR LICENSING infonnation collection is used to plan budgets and resources for operator examinations.
Send " comments regarding burden estimate to the FOlA, Privacy, and lnfonnation Collections Branch (T-5 ; '6 t; . : EXAMINATION DATA F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to i4 lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of lnfonnation.
and Regulatory
- Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means ...... used to impose an infonnation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonnation collection.
FACILITY NRC REGION Indian Point 3 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE.
-CY2019 CY2020 CY2021 CY2022 PROPOSED NUMBER ---------ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2019 CY2020 CY2021 CY2022 ----------NUMBER OF REACTOR 0 3 0 0 OPERATORS NUMBER OF SENIOR REACTOR 0 7 0 0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS
-UPGRADE NUMBER OF SENIOR RE.li.CTOR 0 0 0 0 OPERATORS-LIMITED. PROPOSED DATES PRIMARY DATE -2/3/2.020 ALTERNATE DATE 2/10/2020
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY CY -NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF CANDIDATES NRC FORM 536 (05-2016)