ML17263A981

From kanterella
Revision as of 02:32, 19 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards LER 95-001 Re Pressurizer Safety Valves Lift Settings Found Above TS Tolerance During post-svc Test,Due to Setpoint Shifts
ML17263A981
Person / Time
Site: Ginna 
Issue date: 03/06/1995
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17263A982 List:
References
NUDOCS 9503160234
Download: ML17263A981 (2)


Text

P RI C)RIWY (ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9503160234 DOC.DATE: 95/03/06 NOTARIZED:

NO DOCKET N FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards LER 95-001 re pressurizer safety valves lift.settings found above TS tolerance during post-svc test,due to setpoint shifts.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR I ENCL SIZE'-TITLE: 50.73/50.9 Licensee Event Report (LER),&nciden Rpt, etc.F NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 F RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/SPD/RAB

~FILE CEHTER+02 NRR/DE/EELB NRR/DI SP/PI PB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DSSA/SPLB RES/DSIR/EIB EXTERNAL: L ST LOBBY HARD NOAC MURPHY,G.A NRC PDR COPIES'TTR ENCL 1 1 1 1 1'1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME JOHNSON,A AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DOPS/OECB NRR/DRCH/HICB NRR/DRSS/PRPB NRR/DSSA/SRXB RGN1 FILE 01 LITCO BRYCE,J H NOAC POORE,H.NUDOCS FULL TXT COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1.1 2 2 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE O'ASTE!CONTACT THE DOC!:LIEST CONTROL DESK.ROOWI PI.37 (EVE 504-2083)TO E LIMNI!i ATE YOI.'R FAME F ROTI DISTRIBUTION LISTS I'OR DOCL'RIED'I'S YOL'Oi"I'L'ED!FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: 'LTTR 26 ENCL 26 1ND ROCHESTER GAS AND ElE'CTRIC CORPORATION

~89 FAST Atr ENUE, ROCHESTER, N, Y Id6d9 0001 AREA CODE 716$66.2700 ROBERT C.IrtECREDY Vice President Hucteor Operotions March 6, 1995 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Allen R.Johnson PWR Project Directorate I-3 Washington, D.C.20555

Subject:

LER 95-001, Pressurizer Safety Valves Lift Settings Found Above Technical Specifications Tolerance During Post-service Test, Due to Setpoint Shifts, Results in Independent Trains Being Considered Inoperable R.E.Ginna Nuclear Power Plant Docket No.50-244 In accordance with 10 CFR 50.73, Licensee Event Report System, item (a)(2)(vii)(D), which requires a report of,"any event where a single cause or condition caused at least one independent train or channel to become inoperable in multiple systems or two independent trains or channels to become inoperable in a single system designed to...mitigate the consequences of an accident", the.attached Licensee Event Report LER 95-001 is hereby submitted.

This event has in no way affected the public's health and safety.Very truly yours, Robert C.Mecredy xc: U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna USNRC Senior Resident Inspector 9503i60234 950306 PDR ADOCK 05000244 S PDR