ML17334A462
| ML17334A462 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 02/25/1983 |
| From: | Alexich M AMERICAN ELECTRIC POWER SERVICE CORP. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM AEP:NRC:0631B, AEP:NRC:631B, NUDOCS 8303010323 | |
| Download: ML17334A462 (3) | |
Text
AMER1CAN-ELECTRIC POMfER Service Corporation 2 Broadway, New York,¹Y.10004 (212)440-9000 February 25, 1983 AEP:NRC:0631B Donald C.Cook Nuclear Plant Unit Nos.1 and 2 Docket Nos.50-315 and 50-316 License Nos.DPR-58 and DPR-74 NUREG-0737, ITEM II.F.1.6 TECHNICAL SPECIFICATIOVi FEES PURSUANT TO 10 CFR 170 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555
Dear Mr.Denton:
In our letter No.AEP:NRC:0631A, dated September 29, 1982, we submitted proposed Appendix A Technical Specification (T/S)changes required for placing the new Post-Accident Containment Hydrogen Monitoring System (PACRiS)into service to satisfy the requirements of NUREG-0737, Item II.F.1.6~Our 3.etter included a statement to the effect that the payment for these changes would be made as part of the fee to be levied for the issuance of the T/S changes required by NUREG-0737.
However, by way of his February 3, 1983, letter to Mr.John E.Dolan, Mr.William O.Miller requested the remittance of$4,400 to cover the NRC review expenses.We wish to bring to your attention that on February 15, 1983, we received Generic Letter 82-16 which requests the submittal of thirteen NUREG-0737-required T/S consolidated into one submittal.
Furthermore, a draft Generic Letter transmitted by Mr.Darrell G.Eisenhut to Mr.Carl Walske of the Atomic Industrial Forum, dated January 28, 1983, requests submittal of the T/S.required"for the implementation of ei'ghteen NUREG-0737 items, one of which is item II.F.1.6.Mr.Eisenhut.'s letter again requests that the T/S changes be consolidated'nto one submittal.
The early implementation of.Item ZI.F.1.6 at the Cook Plant, reflects I&i%Co's concern for the safe operation of the plant and the safety of the public.By requesting payment for this T/S change separately, the NRC is financially penali"ing us for the early implementation of required safety equipment.
Consequently, we request that the payment for the NUREG-0737, Item ZI.F.1.6 T/S be made part of the single fee to be levied for the issuance of the T/S changes required by NUREG-0737.
This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, Nil n P.exich Assistant Vice President Nuclear Engineering MPA/md cc: John E.Dolan-Columbus R.S.Hunter R.W.Jurgensen W.G.Smith, Jr.-Bridgman R.C.Callen G.Charnoff W.0.?Q.lier-NRC NRC Resident Inspector at Cook Plant-Bridgman A~"l'I (