Revises Response to Violations Noted in Insp Repts 50-259/89-16,50-260/89-16 & 50-296/89-16 Re Area Walkdowns
ML18033B568
Person / Time
Site: Browns Ferry  
Issue date: 12/03/1990
From: Medford M
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9012070138
Download: ML18033B568 (8)


See also: IR 05000259/1989016

Text

ACCELERATED

DISTRIBUTION

DEMONSTRATION

SYSTEM SUBJECT: Revises response to violations

noted in Insp Repts 50-259/89-16,50-260/89-16

&50-296/89-16

re area walkdowns;

DISTRIBUTION

CODE: IE01D COPXES RECEIVED:LTR

ENCL~SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice

of Violation Response NOTES:1 Copy each to: B.Wilson,S.

BLACK 1 Copy each to: S.Black,B.WILSON

1 Copy each to: S.Black,B.WILSON

D/05000259 05000260 05000296 D REGULATORY

INFORMATION

DISTRIBUTION

SYSTEM (RIDS)ESSION NBR:9012070138

DOC.DATE: 90/12/03 NOTARIZED:

NO DOCKET ACIL:50-259

Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 95000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH;NAME AUTHOR AFFILIATION

MEDFORD,M.O.

Tennessee Valley Authority RECIP.NAME

RECXPIENT AFFILIATION

Document Control Branch (Document Control Desk)RECIPIENT ID CODE/NAME HEBDON,F ACRS AEOD/DEIIB

DEDRO NRR SHANKMAN,S

NRR/DOEA/OEAB

'RR/DRIS/DIR

NRR/PMAS/ILRB12

OE DIR IL 02 EXTERNAL EG&G/BRY CE I J~H~NSIC NOTES COPIES LTTR ENCL 2 1 1 1 1'1 1'RECIPIENT ID CODE/NAME ROSS,T.AEOD AEOD/TPAB NRR MOR I S S EAU I D NRR/DLPQ/LPEB10

NRR/DRE P/PEPB9 D NRR/DST/DIR

8E2 NUDOCS-ABSTRACT

OGC/HDS2 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 D D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE O'ASTE!CONTACT THE DOCUMENT CONTROL DESK, t ROOXI Pl-."'7 (EYT.2II79)TO ELli~llNATE

YOUR NAiXIE FROivl DISTRIBUTION

I.ISTS FOR DOCUP,IENTS

YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL D D

'\

Tenn mrs'ee Va!,'ey Aurncn'.y)10>Ma<<e'.S!ice;Chai:ancoga, Tennessee 37402 fuIark O.Medforo vice presidenrNucrea

Assurance t ce s"y ana Fels DEC 09 1990 U.S.Nuclear Regulatory

Commission

ATTN: 'ocument Control Desk Washington, D.CD 20555 Gentlemen:

In the Hatter of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296.BROWNS FERRY NUCLEAR PLANT,(BFN)

-UNITS 1, 2 AND 3-NRC INSPECTION

REPORT NOS.50-259/89-16, 50-260/89-16, 50-296/89-16

-REVISION To NOTICE OF VIOLATION RESPONSE References:

1.Letter from H.0.Hedford to NRC dated April 9, 1990,"Browns Ferry Nuclear Plant (BFN)-Units 1, 2 and 3, NRC Inspection

Report Nos.50-259/89-16, 50-260/89-16, and 50-296/89-16

-Response to Notice of Violation" 2.Letter from M.0.Medford to NRC dated August 14, 1990,"Browns Ferry Nuclear Plant (BFN)-Units 1, 2 and 3-NRC:.nspection

Report Nos.50-259/89-16, 50-260/89-16, 50-296/89-16

-Revision to Notice of Violation Response" TVA committed in Reference 2 to complete area walkdowns by December 3, 1990.This commitment

date was based on a scheduled Unit 2 restart date of December 5, 1990, and the need to conduct the walkdowns after completion

of all modification

and maintenance

activities.

This letter is provided to extend the completion

date for this item.The performance

of Unit 2 area walkdowns will be completed by restart.Current levels of maintenance

and modification

activities

in the plant make it inappropriate

to perform the area walkdowns by December 3, 1990.

U.S.Nuclear Regulatory

Commission

OEC 03 1gPP The enclosure to this letter provides the revised commitment

date., If you have any questions, please call Patrick P.Carier at (205)729-3566.Very truly yours, TENNESSEE VALLEY AUTHORITY.'ark 0.Medford Enclosures

cc (Enclosures):

Ms.S.C.Black, Deputy Director Project Directorate

11-4 U.S.Nuclear Regulatory

Commission

One White Flint, North 11555 Rockville Pike, Rockville, Maryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000

Mr.Thierry M.Ross, Project Manager U.S.Nuclear Regulatory

Commission

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 iMr.B.A.Wilson, Project Chief U.S.Nuclea Regulatory

Commission

Region II 101 iMarietta Street, NW, Suite 2900 Atlanta, Georgia 30323

ENCLOSURE SUi&IARY OF COI'NITMENTS

Area walkdowns will be completed for Unit 2 by restart: (Violation

A, Example 3: Violation B, Examples l, 2, and 7)

V!~