ENS 54046
From kanterella
Revision as of 06:30, 6 May 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
---|---|
12:52 May 3, 2019 | |
Title | Fitness-For-Duty Report |
Event Description | A non-licensed contract supervisor had a confirmed positive during a for-cause fitness-for-duty test. The individual's authorization for site access has been terminated.
The NRC Resident has been notified. |
Where | |
---|---|
Turkey Point Florida (NRC Region 2) | |
Reporting | |
10 CFR 26.719 | |
Time - Person (Reporting Time:+3.85 h0.16 days <br />0.0229 weeks <br />0.00527 months <br />) | |
Opened: | Christopher Trent 16:43 May 3, 2019 |
NRC Officer: | Caty Nolan |
Last Updated: | May 3, 2019 |
54046 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 54046\u003C/a\u003E - \u003Ca href=\"/Turkey_Point\" title=\"Turkey Point\"\u003ETurkey Point\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EFitness-For-Duty Report\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 54046 - Turkey Point\n","link":"","lat":25.435330555555556,"lon":-80.33125833333334,"icon":"/w/images/9/9b/NextEra_Energy_icon.png"}],"imageoverlays":null} | |
Unit 3 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Unit 4 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 557682022-03-05T15:30:0005 March 2022 15:30:00
[Table view]10 CFR 26.719 Failed Fitness for Duty Test ENS 557572022-02-24T21:50:00024 February 2022 21:50:00 10 CFR 26.719 Fitness for Duty ENS 540462019-05-03T12:52:0003 May 2019 12:52:00 10 CFR 26.719 Fitness-For-Duty Report ENS 521622016-08-08T14:45:0008 August 2016 14:45:00 10 CFR 26.719 Fitness-For-Duty Report Involving a Non-Licensee Contract Supervisor ENS 490962013-06-06T12:00:0006 June 2013 12:00:00 10 CFR 26.719 Fitness-For-Duty Report Involving a Contract Supervisor Arrested Offsite ENS 485262012-11-20T01:00:00020 November 2012 01:00:00 10 CFR 26.719 Non-Licensed Contractor Supervisor Tests Positive for Alcohol ENS 480392012-06-20T12:57:00020 June 2012 12:57:00 10 CFR 26.719 Fitness for Duty Event ENS 478692012-04-27T12:00:00027 April 2012 12:00:00 10 CFR 26.719 Fitness for Duty - Non-Licensed Contract Supervisor Tested Positive for Drugs ENS 478272012-04-11T14:48:00011 April 2012 14:48:00 10 CFR 26.719 Fitness for Duty - a Contract Supervisor Tested Positive on a Drug Test ENS 463692010-10-27T04:00:00027 October 2010 04:00:00 10 CFR 26.719 Fitness for Duty Report Involving a Supervisor ENS 457562010-03-10T14:00:00010 March 2010 14:00:00 10 CFR 26.719 Fitness for Duty Report ENS 447982009-01-22T14:35:00022 January 2009 14:35:00 10 CFR 26.719 Positive Fitness for Duty Test ENS 447262008-12-17T14:42:00017 December 2008 14:42:00 10 CFR 26.719 Fitness for Duty ENS 446912008-12-02T20:15:0002 December 2008 20:15:00 10 CFR 26.719 Fitness for Duty ENS 445822008-10-20T15:10:00020 October 2008 15:10:00 10 CFR 26.719 24 Hour Fitness for Duty Report 2022-03-05T15:30:00 | |