Letter Sequence Draft RAI | |
|---|---|
EPID:L-2018-LLA-0054, Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping (Approved, Closed) | |
Initiation Administration | |
MONTHYEARML18072A0102018-01-31031 January 2018, 7 March 2018
[Table View]Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping Project stage: Request ML18072A0132018-01-31031 January 2018 WCAP-18295-NP, Revision 0, Technical Justification for Eliminating Accumulator Line Rupture as the Structural Design Basis, Using Leak-Before-Break Methodology Project stage: Request ML18072A0142018-01-31031 January 2018 WCAP-18302-NP, Revision 0, Technical Justification for Eliminating Residual Heat Removal Line Rupture as the Structural Design Basis, Using Leak-Before-Before Break Methodology Project stage: Request AEP-NRC-2018-02, WCAP-18309-NP, Revision 0, Technical Justification for Eliminating Safety Injection Line Rupture as the Structural Design Basis Using Leak-Before-Break Methodology2018-01-31031 January 2018 WCAP-18309-NP, Revision 0, Technical Justification for Eliminating Safety Injection Line Rupture as the Structural Design Basis Using Leak-Before-Break Methodology Project stage: Request ML18075A1142018-03-26026 March 2018 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18096A7642018-04-0606 April 2018 NRR E-mail Capture - Donald C. Cook, Unit 1 - Acceptance Review for Application of Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping Project stage: Acceptance Review ML18204A3722018-07-19019 July 2018 NRR E-mail Capture - D.C. Cook Unit No. 1 - RAI for Leak-Before-Break LAR Project stage: RAI ML18263A1542018-09-14014 September 2018 NRR E-mail Capture - D.C. Cook Unit No. 1 - RAI for Leak-Before-Break LAR Project stage: RAI ML19011A3512019-01-11011 January 2019 NRR E-mail Capture - Request for Additional Information DC Cook Unit 1 Leak Before Break Amendment Project stage: RAI ML19072A1432019-03-12012 March 2019 NRR E-mail Capture - Resubmitted: Draft Request for Additional Information DC Cook Unit 1 - Leak-Before-Break LAR Project stage: Draft RAI ML19084A0002019-03-20020 March 2019 NRR E-mail Capture - Resubmitted: Draft Request for Additional Information DC Cook Unit 1 - Leak-Before-Break LAR Project stage: Draft RAI ML19170A3622019-08-0101 August 2019 Issuance of Amendment Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping Project stage: Approval 2018-09-14 |
| ML19072A143 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 03/12/2019 |
| From: | Haskell R S Plant Licensing Branch III |
| To: | Levendosky H L Indiana Michigan Power Co |
| References | |
| L-2018-LLA-0054 | |
| Download: ML19072A143 (4) | |
Similar Documents at Cook | |
|---|---|