March 22, 2006Mr. L. M. Stinson Vice President - Farley Project Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 1, EXEMPTION FROM THEREQUIREMENTS OF 10 CFR PART 50, APPENDIX R (TAC NO. MC5718)
Dear Mr. Stinson:
The Nuclear Regulatory Commission has approved the enclosed exemption from specificrequirements of Title 10 of the Code of Federal Regulations Part 50, Appendix R, for theJoseph M. Farley Nuclear Plant, Unit 1. This action is in response to your letter dated January 19, 2005, as supplemented by letters dated June 9 (two letters), and November 18, 2005, that requested exemptions from certain Appendix R requirements.A copy of the exemption has been forwarded to the Office of the Federal Register forpublication. Sincerely,/RA/Robert E. Martin, Senior Project ManagerPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-348
Enclosure:
Exemption cc w/encl: See next page Joseph M. Farley Nuclear Plant, Units 1 & 2 cc:
Mr. J. R. JohnsonGeneral Manager Southern Nuclear Operating Company, Inc.
P.O. Box 470 Ashford, AL 36312Mr. B. D. McKinney, Licensing ManagerSouthern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295Mr. M. Stanford BlantonBalch and Bingham Law Firm
P.O. Box 306 1710 Sixth Avenue North Birmingham, AL 35201Mr. J. GasserExecutive Vice President Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201State Health OfficerAlabama Department of Public Health 434 Monroe St.
Montgomery, AL 36130-1701Chairman Houston County Commission P.O. Box 6406 Dothan, AL 36302Resident InspectorU.S. Nuclear Regulatory Commission 7388 N. State Highway 95 Columbia, AL 36319William D. OldfieldSAER Supervisor Southern Nuclear Operating Company, Inc.
P.O. Box 470 Ashford, AL 36312 March 22, 2006Mr. L. M. Stinson Vice President - Farley Project Southern Nuclear Operating Company, Inc.
P.O. Box 1295 Birmingham, AL 35201-1295
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 1, EXEMPTION FROM THEREQUIREMENTS OF 10 CFR PART 50, APPENDIX R (TAC NO. MC5718)
Dear Mr. Stinson:
The Nuclear Regulatory Commission has approved the enclosed exemption from specificrequirements of Title 10 of the Code of Federal Regulations Part 50, Appendix R, for theJoseph M. Farley Nuclear Plant, Unit 1. This action is in response to your letter dated January 19, 2005, as supplemented by letters dated June 9 (two letters), and November 18, 2005, that requested exemptions from certain Appendix R requirements.A copy of the exemption has been forwarded to the Office of the Federal Register forpublication. Sincerely,/RA/Robert E. Martin, Senior Project ManagerPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-348
Enclosure:
Exemption cc w/encl: See next pageDistribution
- PublicRidsNrrLACSolaBSingal, DORL DPR LPL2-1 r/fRidsOgcRpAklein RidsNrrDorlLplcRidsAcrsAcnwMailCenter RidsNrrPMRMartinRidsRgn2MailCenterADAMS Accession Number: ML060200362 NRR-048OfficeNRR/LPL2-1/PMNRR/LPL2-1/LAOGC NRR/LPL2-1/BCNRR/DORL/DNameRMartinCSolaMBuppEMarinosCHaney Date03/16/0603/16/0603/01/0603/20/0603/22/06OFFICIAL RECORD COPY 7590-01-P UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONSOUTHERN NUCLEAR OPERATING COMPANY JOSEPH M. FARLEY NUCLEAR POWER PLANT, UNIT 1DOCKET NO. 50-348 EXEMPTION
1.0 BACKGROUND
The Southern Nuclear Operating Company (SNC, the licensee) is the holder ofRenewed Facility Operating License No. NPF-2 which authorizes operation of Joseph M. FarleyNuclear Power Plant (FNP), Unit 1. The license provides, among other things, that the facility issubject to all rules, regulations, and orders of the Nuclear Regulatory Commission (NRC, theCommission) now or hereafter in effect.The facility consists of a pressurized-water reactor located in Houston County, Alabama.2.0 REQUEST/ACTIONTitle 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix R, "FireProtection Program for Nuclear Power Facilities Operating Prior to January 1, 1979,"establishes fire protection features required to satisfy General Design Criterion 3, "Fire protection," of Appendix A to10 CFR Part 50 with respect to certain generic issues for nuclear power plants licensed to operate prior to January 1, 1979. FNP, Unit 1 was licensed to operate prior to January 1, 1979. Therefore, FNP, Unit 1 is directly subject to Appendix R. By letter dated January 19, 2005, as supplemented by letters dated June 9 (two letters)and November 18, 2005, SNC, the licensee for FNP, Unit 1, submitted a request for a permanent exemption from 10 CFR Appendix R,Section III.G.2, pertaining to FNP, Unit 1(SNC letters NL-04-2357, NL-05-0937, NL-05-0960 and NL-05-1975, respectively).
Specifically, 10 CFR Appendix R,Section III.G.2, would require the use of a 1-hour rated firebarrier for protection of certain safe shutdown control circuits located in Fire Areas 1-013 and 1-042. In lieu of providing such 1-hour rated fire barriers, the licensee proposes the use of fire-rated electrical cable produced by Meggitt Safety System, Inc., (previously known as Whittaker Electronic Resources Unit of Whittaker Electronic Systems) for several cables in Fire Areas 1-013 and 1-042 associated with safe shutdown control circuits.
3.0 DISCUSSIONPursuant
to 10 CFR 50.12, the Commission may, upon application by any interestedperson or upon its own initiative, grant exemptions from the requirements of 10 CFR Part 50 when (1) the exemptions are authorized by law, will not present an undue risk to public health orsafety, and are consistent with the common defense and security; and (2) when special circumstances are present. These special circumstances are described in 10 CFR 50.12(a)(2)(ii), in that the application of these regulations is not necessary to achieve theunderlying purpose of the rule.The underlying purpose of Appendix R,Section III.G, is to provide features capable oflimiting fire damage so that: (1) one train of systems necessary to achieve and maintain hotshutdown conditions from either the control room or emergency control station(s) is free of fire damage; and (2) systems necessary to achieve and maintain cold shutdown from either thecontrol room or emergency control station(s) can be repaired within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. 3.1 Overview of Approach Used by LicenseeFor this specific fire protection application, SNC proposes plant modifications to use 1-hour fire-rated electrical cable in lieu of a 1-hour rated fire barrier as required by 10 CFR Part 50, Appendix R, Section III.G.2.Section III.G.2 of 10 CFR Part 50, Appendix R, provides fireprotection requirements for electrical cables located within the same fire area whose failure could cause the maloperation of redundant trains of systems necessary to achieve andmaintain hot shutdown conditions. These areas are required to have protection features such that one of the redundant trains will be free of fire damage in the event of a fire. One method,described in Section III.G.2, for ensuring compliance with this requirement is to enclose thecable and equipment and associated non-safety circuits of one redundant train in a 1-hour rated fire barrier. In addition, an area-wide automatic fire suppression and detection system shall beinstalled in the fire area. A postulated fire in Fire Area 1-013 or 1-042 could cause loss of offsite power; both fireareas contain cable bus ducts from the startup transformers to both redundant trains of the 4 kilovolt (KV) Appendix R safe shutdown (SSD) busses. A postulated fire in either of these fire areas could also potentially impact the function of the Train B 4 KV Emergency Diesel Generator (EDG) 1B control circuitry. The majority of the Train A onsite electrical power system components required for Appendix R SSD are not located in Fire Area 1-013 or 1-042. The following Train A onsite power system related SSD circuits located in Fire Areas 1-013 and 1-042 will be protected by a 1-hour fire-rated electrical cable along with area-wide automatic firesuppression and detection:1.Protection of control circuitry that could potentially disable the supply of theonsite power from the Train A 4KV EDGs 1-2A and 1-C, or disable supply of 7 Train A onsite power due to inadvertent loading of electronic switching system(ESS) loads onto EDG 1-C:
a.)The control interlocks for the automatic alignment of the Train A Swing EDG 1C Incoming Breaker 1-DH07 or 2-DH07 to provide onsite AC power due to loss of offsite power to the shutdown buses.b.)The control interlocks for the automatic alignment of the Train A Swing EDG 1-2A Incoming Breaker 1-DF08 or 2-DF08 to provide onsite AC power due to loss of offsite power to the shutdown buses.c.)The control interlocks for the automatic alignment of Unit 1 600V LoadCenter 1D Breaker 1-ED13 or Unit 2 600V Load Center 2D Breaker 2-ED13 to MCC 1S (power to the Train A Swing EDG 1-2A auxiliaries) so that the MCC is aligned to the same DG 1-2A. d.)The control interlocks from Unit 2 ESS Sequencer that blocks Unit 1 ESS Sequencer on a Unit 2 safety injection actuation signal (This signal is to prevent inadvertent loading of ESS loads on smaller DG 1C). e.)The control interlock from Unit 1 ESS Sequencer that blocks Unit 2 ESSSequencer on a Unit 1 safety injection actuation signal (This signal is to prevent inadvertent loading of ESS loads on smaller DG 1C).2.Protection of the control circuitry that could potentially disable the operation ofthe 4KV power supply breakers to the Train A Component Cooling Water Pump 1C, Train A Charging Pump 1A, and Train A Motor-Driven Auxiliary Feed-WaterPump 1A. 3.Protection of the control circuitry that could potentially disable the operation ofthe 600V load center power supply breaker to Train A Pressurizer Heater Group 1A. A 1-hour rated fire barrier as described in Section III.G.2 of 10 CFR Part 50, Appendix R is notprovided. Instead, these credited Train A components will utilize fire-rated electrical cables(Mineral Insulated (MI) cables). This fire-rated electrical cable has been tested in accordance with American Society for Testing Materials (ASTM) E-119, "Standard Test Methods for Fire Tests of Building Construction Materials."
3.2 Technical
Evaluation3.2.1 Test Results The NRC staff reviewed this issue with respect to determining that the fire-ratedelectrical cables would be capable of providing an equivalent level of protection as would be provided by a 1-hour rated fire barrier as required by 10 CFR part 50, Appendix R,Section III.G.2.The licensee provided copies of the test report, "Appendix R, One-Hour Fire ResistiveControl Cable Test," dated August 11, 2004, in its submittal. The cables in Farley, Unit 1 are used as control circuit applications and are rated at 125 volts direct-current (VDC). The licensee's report, listed above, includes the fire test performance results for 8 Conductor #12 AWG Meggitt Safety Systems electrical cable with factory splices and several support systemsand attachment methods, when exposed to the ASTM E-119 time-temperature heating curve for a period of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
3.2.2 Megger
TestingThe fire-rated electrical cables at FNP were tested for use in low voltage control circuits. Megger Testing was conducted at 500 VDC , to obtain conductor-to-conductor and conductor-to-ground insulation resistance values, before the fire test, during the fire test, andafter the hose stream test. To ensure that the conductor-to-conductor and conductor-to-ground insulation resistance (IR) readings were obtained for all conductor combinations at the peak ASTM E-119 1-hour test temperature, the first test was extended for an additional 38 minutes and 12 seconds with the furnace temperature held as close as possible to 1700 degrees Farenheit until all IR values were recorded. Obtaining insulation resistance values during the fire test by the test method applied provided conservative test results that meet the fire Megger Testing requirements of GL 86-10, Supplement 1, for the FNP specific 1-hour rated controlcable application. The NRC staff finds, based on the Megger Testing, that the insulationresistance values are acceptable for the specific application at FNP, Unit 1.
3.2.3 Minimum
Insulation Resistance ValueThe licensee completed a plant circuit-specific analysis and concluded that the controlcircuit protective devices will not trip during a fire event with an IR value of 5.7 mega-ohms/foot (M/ft). The minimum IR value recorded during the fire test was 0.8 M, and with 24.176 feetof cable inside the furnace, that equated to 19.3 M/ft. This far exceeds the FNP-specificminimum acceptance value of 5.7 M/ft.The NRC staff concludes that, based on the information provided, the minimum IR valuerecorded during testing is acceptable for the specific application at FNP, Unit 1.
3.2.4 Mechanical
Damage ProtectionRated 1-hour electrical cable raceway fire barriers are tested in a furnace and subject toa hose stream test that ensures the raceway and the barriers will stay in place following a fireexposure. The fire-rated electrical cables were tested in a furnace and subjected to a hose stream. Since the fire-rated electrical cables themselves are the barriers, any mechanical damage that occurs to the cables may cause the cables to fail. The licensee's letter dated June 9, 2005, stated that the areas where the fire-rated electrical cables are routed areprotected with area-wide automatic fire suppression and detection systems, as required byAppendix R Section III.G.2.c. In addition, the routing for each fire-rated electrical cable wasestablished by plant walk-downs to protect against potential physical hazards. The licensee stated that the fire-rated electrical cables are also safety-related and will be installed to meetthe FNP routing requirements for Class 1E cable protection from physical hazards. The fire-rated electrical cables are only routed in safety-related Class 1 structures, and all safety-related and nonsafety-related equipment and components in these structures areseismically supported. The NRC staff concludes, based on the information provided, that there is adequateprotection from mechanical damage to demonstrate equivalence to a raceway fire barrier system for the specific application at FNP, Unit 1.3.2.5 Galvanized SupportsWhen in contact with galvanized supports, fire-resistive electrical cable produced byMeggitt Safety Systems, Inc. has been reported to experience degradation due to liquid metal embrittlement. This degradation occurs at the positions where the galvanized supports are in direct contact with the stainless steel cable jacket. Section 4, subsection j of Meggitt Safety Systems engineering document, "Unpacking, Inspection, Installation and Standard Practices for 8/C #12 AWG Si 2400 Fire-Rated Cable For J.M. Farley Nuclear Plant, Revision D," states that "Si Fire Cable may be routed in cable trays; Stainless steel trays are recommended. Cable should not be installed in galvanized trays and should NOT be in direct contact with galvanized or aluminum trays or structures." The NRC staff concludes, based on the information provided in the engineeringdocument, that the installation standard will adequately address the concern with galvanizedsupports for the specific application at FNP, Unit 1.
3.2.6 Defense-in-DepthThe following are the fire protection defense-in-depth objectives: 1) to prevent fires fromstarting; 2) to detect rapidly, control, and extinguish promptly those fires that do occur; and 3) to provide protection for structures, systems, and components important to safety so that a firethat is not promptly extinguished by the fire suppression activities will not prevent the safeshutdown of the plant. The licensee stated that Fire Areas 1-013 and 1-042 are provided with area-wide automatic fire suppression and detection systems. The use of fire-rated electricalcables is a substitute for 1-hour rated fire barriers that are required by 10 CFR Part 50, Appendix R, and supports the third defense-in-depth objective. For this specific application, the licensee has demonstrated that the fire-rated electrical cables used are a suitable alternative tothe 1-hour rated fire barrier as required by 10 CFR part 50, Appendix R.
4.0 CONCLUSION
The NRC staff concludes that, on the bases of the discussions in the sections above, forthe specific application of this material, the licensee has adequately demonstrated that this fire-rated electrical cable will perform in an equivalent manner when compared to a rated barrierfor this use. The NRC staff also concludes that the use of the MI cable for these purposes,meets the underlying purpose of Appendix R and, that, therefore special circumstances are present. Accordingly, the Commission has determined that, pursuant to 10 CFR 50.12(a), the exemption is authorized by law, will not present an undue risk to the public health and safety,and is consistent with the common defense and security. Therefore, the Commission hereby grants Southern Nuclear Operating Company an exemption from the requirements to 10 CFR Part 50, Appendix R,Section III.G.2, to the extent that it requires protection of cables of oneredundant train of safe shutdown equipment by a 1-hour rated fire barrier, for Fire Areas 1-013 and 1-042. The fire-rated electrical cables provide an equivalent level of protection necessary to achieve the underlying purpose of the rule for Joseph M. Farley Nuclear Plant, Unit 1. Pursuant to 10 CFR 51.32, the Commission has determined that the granting of thisexemption will not have a significant effect on the quality of the human environment(71 FR 12219, March 9, 2006).
This exemption is effective upon issuance.Dated at Rockville, Maryland, this 22nd day of March 2006.FOR THE NUCLEAR REGULATORY COMMISSION/RA/Edwin M. Hackett, Acting DirectorDivision of Operating Reactor LInensing Office of Nuclear Reactor Regulation