ML070720526

From kanterella
Revision as of 13:06, 10 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Semiannual Fitness for Duty Performance Report for Period of July Through December, 2006
ML070720526
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/01/2007
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2007-33
Download: ML070720526 (3)


Text

FPL 10 CFR 26.71 L-2007-33 March 1, 2007 U.S Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Semiannual Fitness for Duty Performance Report Attached is the Semiannual Fitness for Duty Performance Report for the period of July 1, 2006, through December 31, 2006, for Turkey Point Units 3 and 4, as required by 10 CFR 26.71 (d).The Turkey Point Fitness for Duty Program uses a random testing rate of at least 50%.The attachment contains the program performance data, as well as, a list of events reported and a summary of any management actions taken.Should there be any questions or comments regarding this information, please contact Mr. James Connolly at 305-246-6632.

Very truly yours, William J~fferson, Jr.Vice President Turkey Point Nuclear Plant Attachment cc: Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Nuclear Plant AokbI an FPL Group company Attachment FPL Letter L-2007-33 Page 1 of 2 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 FLORIDA POWER AND LIGHT Company TURKEY POINT PLANT Location JIM DENTON Contact Name Cutoffs: Screen/Confirmation (ng/ml)Marijuana 50/15 Amphetamines Cocaine 300/150 Phencyclidine Opiates 300/300 Alcohol (%BAC)12/31/2006 Six (6) Month Ending (305) 246-7171 Phone (include Area Code)Appendix A to 10 CFR 26 MARIJUANA 100/15 //1000/500 25/25.04%TESTING LICENSEE LONG-TERM SHORT-TERM RESULTS EMPLOYEES CONTRACTOR PERSONNEL CONTRACTOR PERSONNEL Average Number with Unescorted Access 980 214 458 TOTAL: 1699 CATEGORIES TESTED POSITIVE TESTED POSITIVE TESTED POSITIVE Pre-Access 139 0 0 0 706 TOTAL: 845 Post 0 0 2 0 1 0 For Cause Accident TOTAL: Observed 0 0 8 Behavior Random 263 1 59 0 129 0 TOTAL: 451 Follow-up 17 0 0 0 11 0 TOTAL: 28 Other:

  • 15 6 0 0 0 9 Listedin preaccess (4)TOTAL 429 1 62 0 856 7 Attachment FPL Letter L-2007-33 Page 2 of 2 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 6 Month Report Ending: 12/31/2006 Refusal CATEGORY:

Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol to Test Licensee Employees 0 0 0 0 0 1 0 Long-Term Contractors 0 0 0 0 0 0 0 Short-Term Contractors 5 3 0 0 0 1 0 TOTAL 5 3 0 0 0 2 0 Total 10* Other: 15 retests observed, 8 due to dilute, all negative and 7 retests due to no temp, which 4 resulted in positives results.** 2 of the positive drug tests for marijuana listed above exceeded the Florida Power & Light cutoff level (50 ng/ml) but did not exceed the DHHS/NRC cutoff level of (100 ng/ml). The remaining positive drug test results listed above exceeded the DHHS/NRC cutoff levels. Two short term contractors were positive for marijuana and cocaine on their pre-access test.FFD Performance Data Review/Comments:

1. Were any programmatic weaknesses identified:

None 2. What management actions have been taken or initiated?

If any, explain: None 3. Notate any specimens that were adulterated and substance detected:

None 4. 2006 Percent of Random Population Tested: Per ACX % tested was 53.2%