NRC 2012-0045, Technical Specification Bases Change Summary
| ML12165A251 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/12/2012 |
| From: | Jim Costedio Point Beach |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| NRC 2012-0045 | |
| Download: ML12165A251 (3) | |
Text
June 12,2012 ENERGY POINT BEACH NRC 201 2-0045 TS 5.5.13 10 CFR 50.71 (e) U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical S~ecification Bases Chanqe Summarv In accordance with the requirements of Technical Specification (TS) 5.5.13 and 10 CFR 50.71 (e), NextEra Energy Point Beach, LLC (NextEra), is submitting a summary of changes made to the Point Beach Nuclear Plant (PBNP) TS Bases. The enclosure contains the TS Bases change summary for the period January 1,201 1, through December 31,201 1. NextEra previously submitted the TS Bases change summary for January 1,201 0, through December 31,201 0, on June 9,201 1 (MLI 11610154). This letter contains no new commitments and no revisions to existing commitments. If you have questions or require additional information, please contact William Hennessy at 92017557656. Very truly yours, NextEra Energy Point Beach, LLC James Costedio Licensing Manager Enclosure Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241 ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL SPECIFICATIONS BASES CHANGE
SUMMARY
FOR 201 1 Date of Channe Affected Section Affected Pauels) Summarv 4 and 5 Removed T-avg vs. Delta-T tables. 1 and 3 Alternate Source Term (AST) amendment revisions. AST amendment revisions. 4 and 6 3-8 and 10 Extended power uprate (EPU) amendment revisions. EPU amendment revisions. All 2 and 48 AST amendment revisions. 1, 3 - 8, 10, Reactor protection system and engineered safety feature 16, 17, actuation system (RPSIESFAS) amendment revisions. 22 - 24, 26 - 28,30, 43 - 47 RPSIESFAS amendment revisions. Auxilliary feedwater (AFW) amendment revisions. AST amendment revisions. EPU amendment revisions. EPU amendment revisions. 1-3 1-3 2 and 4 11/15/11 B3.4.10 1,2and4 11/15/11 B3.4.11 1 06/01/11 B 3.4.1 3 2 and 6 EPU amendment revisions. EPU amendment revisions. AST amendment revisions. 1 111 511 1 B 3.4.16 1 - 4, and 6 EPU amendment revisions. Page 1 of 2 Date of Affected Affected Chanqe Section Paqek) 06/01/11 B 3.4.17 2 and 7 11/15/11 B3.5.1 3 and 4 11/15/11 B3.5.1 6 2 2 2 1 2 2 and 5 - 7 2 and 3 1 All All All 06/01/11 B 3.7.9 All 06/01/11 B 3.7.13 All 11/15/11 B3.7.14 All Summarv AST amendment revisions. EPU amendment revisions. Surveillance Requirements 3.5.1.2 and 3.5.1.3 values for accumulator volume and pressure were changed to include parametric values. AST amendment revisions. EPU amendment revisions. AST amendment revisions. EPU amendment revisions. EPU amendment revisions. EPU amendment revisions. EPU amendment revisions. EPU amendment revisions. EPU amendment revisions. AFW amendment revisions. AFW amendment revisions. AST amendment revisions. AST amendment revisions. AST amendment revisions. AFW amendment revisions. Revisions associated with the diesel fuel oil storage amendment. AST amendment revisions. Page 2 of 2