MONTHYEARIR 05000259/20240032024-11-0404 November 2024 Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 CNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement ML24305A1692024-10-31031 October 2024 Site Emergency Plan Implementing Procedure Revision 05000259/LER-2024-003, Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators2024-10-29029 October 2024 Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators 05000259/LER-2024-001-02, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure2024-10-28028 October 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure ML24299A2632024-10-25025 October 2024 Response to Apparent Violation in NRC Inspection Report 05000260/2024090, EA-24-075 ML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24308A0042024-10-16016 October 2024 Ahc 24-1578 Environmental Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 Subsequent License Renewal Application Limestone County CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints2024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure2024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation2024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual 2024-09-03
[Table view] |
See also: RIS 2016-09
Text
Te nn essee Va ll ey A uth o ri ty , Post Office Box 2000 , Decat u r , A l a b ama 35609-2000
July 1 , 2016 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory
Commission
Washington , D.C. 20555-0001
Browns Ferry Nuclea r Plant , Units 1 , 2 , and 3 Renewed Fac i lity Operating
License Nos. DPR-33 , DPRD-52 , and DPR-68 NRC Docket Nos. 50-259 , 50-260 , and 50-296 Subject: Response to NRC Regulatory
Issue Summary 2016-09, Preparation
and Scheduling
of Operator Licensing
Examinations
Reference: 1. Nuclear Regulatory
Commission , Regulatory
Issue Summary 2016-09 , " Preparation
and Scheduling
of Operator Licensing
Examinations
," dated June 16 , 2016 2. Letter from the Tennessee
Valley Authority
to the Nuclear Regulatory
Commission , " Response to NRC Regulatory
Issue Summary 2015-05 , Preparation
and Scheduling
of Operator Licensing
Examinations
," dated May 22, 2015. The Nuclear Regulatory
Commission (NRC) Regulatory
Issues Summary (RIS) 2016-09 (Reference
1) requested
specific information
regarding
the Browns Ferry Nuclear Plant (BFN) projected
operator licensing
examination
schedules
and the estimated
number of applicants.
By letter dated May 22 , 2015 (Reference
2), the Tennessee
Valley Authority
provided an estimate of the examination
requirements
for BFN on NRC Form 536 , " Operator Licensing
Examination
Data." This letter revises the estimates
previously
provided by Reference
2 , and provides applicant
estimates
through 2021.
US Nuclear Regulatory
Commission
Page 2 July 1 , 2016 There are no new regulatory
commitments
associated
with this submittal.
Should you have any questions
concerning
this response , please contact Christopher
L. Vaughn at (256) 729-3439. Enclosure: Response to NRC Regulatory
Issue Summary 2016-09 , Preparation
and Scheduling
of Operator Licensing
Examinations
cc (w/ Enclosure)
- NRC Regional Administrator
-Region II
ENCLOSURE
Tennessee
Valley Authority
Browns Ferry Nuclear Plant Units 1, 2, and 3 Response to NRC Regulatory
Issue Summary 2016-09, Preparation
and Scheduling
of Operator Licensing
Examinations
See Enclosed
NRC FORM 536 U.S. NUCLEAR REGULATORY
COMMISSION
APPROVED BY OMB: NO. 3150-013 1 EXP I RES: 10/31/2017
(01-2015)
FIEG(I< Estim ated burden per response to com p ly with t his v oluntary information
collection
request: 1 '¥'*. hour. This in formation
collec tio n is used to plan b u d get s and resou rces for o pera tor ; .., CZ, OPERA TOR LICENSING
examinations. Se n d comments regard ing burden estima t e to t he FOIA , Priva cy, and Information
- . **; Co ll e ctions Branch (T-5 F5 3), U.S. Nucle a r Regul atory Commission , Washi ngton , D C EXAMINATION
DATA 20555-0001, or by internet e-mail to lnfocollec
t s.Resource@nrc
.gov , and to the Desk Officer, ....... Office of Information
and Regulatory
Affairs, NEOB-10202 , (3 150-0131), Office of Management
and Budge t, Was hington , DC 20503. If a mean s used to impose an info rmation co llecti on does not disp lay a cu rrently vali d OM B contro l number, the NRC may no t conduct or spo ns o r , and a person is not r eq u i r ed to respond to , the information
collect i on. FA C ILI T Y NRC R E GION A. PROPOSED EXAMINATION
PREPARATION
SCHEDULE PROPOSED NUMBER CY 20 1 6 CY 2017 CY 2018 C Y 2019 ---------EST I MATED NU MB ER OF LICENSEE-PREPARED
0 1 1 1 EXAMINATIONS
EST I MATED NUM BE R OF NR G-P R E P A RE D 0 0 0 0 E XAMINA TION S B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER C Y 2 01 6 CY 2017 C Y 2018 C Y 2019 ----------NU MB ER OF R EACTOR 0 0 6 4 O P ERATORS NUMBER OF SENIOR R EA CTOR 0 5 8 6 O P ER ATORS -INSTANT NUMB ER OF SENIO R REACTOR 0 7 2 6 O PE RATORS-UPGRA
D E NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS
-LIMITED PROPOSED DATES PRIMARY DATE N I A 04 1 10 1 2 01 7 06/10 1 2 018 04 1 08 1 2019 ALTER NA TE DAT E N IA SCHEDULED
07 1 15 1 2018 05/13 1 2 019 c. PROPOSED GENERIC FUNDAMENTALS
EXAMINATION (GFE) SCHEDULE CY 2016 CY 2 017 PROPOS E D ----NUMB E R MARCH JU N E SEPT E M B E R D ECE M B E R MARCH JU N E SEPTEMBER
D E C E M BER ESTIMATED
N UMBER OF 14 10 CA NDIDA TES NR G FORM 536 (01-2 015)
NRC FORM 536 U.S. NUCLEAR REGULATORY
COMMISSION
APPROVED BY OMB: NO. 3150-0131
EXPIRES: 10/31/2017
(01-2015)
c,"t.,.P.
Fl£G(l("f Estimated
burden per response to comply with this voluntary
information
collection
request: 1 'W' hou r. This information
collection
is used to plan budgets and resources
for operator /;' n OPERA TOR LICENSING
examinations. Send comments regarding
burden estimate to the FOIA, Privacy , and Information
< 0 -" Collections
Branch (T-5 F53), U.S. Nuclear Regulatory
Commission, Washington , DC ; ! .,..,."' EXAMINATION
DATA 20555-0001 , or by internet e-mail to lnfocollects.Resource@nrc.gov , and to the Desk Officer, .. Office of Information
and Regulatory
Affairs , NEOB-10202 , (31 50-01 3 1), Office of Management
...... and Budget , Washington , DC 20503. If a means used to impose an information
collection
does not display a currently
valid OMB control number, the NRC may not conduct or sponsor , and a person is not required to r espond to, the information
collection.
FA C ILIT Y NRC REGION A. PROPOSED EXAMINATION
PREPARATION
SCHEDULE PROPOSED NUMBER CY2020 CY2021 CY CY ---------ESTIMATED
NUMBER OF LICENSEE-PREPARED
1 1 EXAMINATIONS
ESTIMATED
NUMBER OF NRG-PREPARED
0 0 EXAM INATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER CY2020 CY2021 CY CY ----------NUMBER OF REACTOR 5 5 OPERATORS
NUMBER OF SENIOR REACTOR 6 6 OPERATORS
-INSTANT NUMBER OF SENIOR REACTOR 2 2 OPERATORS-UPGRADE
NUMBER OF SENIOR REACTOR 0 0 OPERATORS
-LIMITED PROPOSED DATES PRIMARY DATE 04/13/2020 04/12/2021 ALTERNATE
DATE 05111/2020 05/10/2021 c. PROPOSED GENERIC FUNDAMENTALS
EXAMINATION (GFE) SCHEDULE CY 2018 CY 2019 PROPOSED ------NUMBER MARCH JUNE SEPTEMBER
DECEMBER MARCH JUNE SEPTEMBER
DECEMBER ESTIMATED
NUMBER OF 11 11 CANDIDATES