Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 ML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 ML24234A0922024-08-21021 August 2024 Requalification Program Inspection NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 05000317/LER-2024-001, Submittal of LER 2024-001-01 for Calvert Cliffs Nuclear Power Plant, Unit 1, Condition Prohibited by Technical Specifications Due to Safety Injection Check Valve Not Full Closed2024-07-0202 July 2024 Submittal of LER 2024-001-01 for Calvert Cliffs Nuclear Power Plant, Unit 1, Condition Prohibited by Technical Specifications Due to Safety Injection Check Valve Not Full Closed ML24177A1832024-06-25025 June 2024 Inservice Inspection Report IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 2024-09-06
[Table view] Category:Notice of Violation
MONTHYEARIR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 IR 05000317/20220902022-12-0505 December 2022 EA-22-089: Calvert Cliffs Nuclear Power Plant, Unit 1 - Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation: Inspection Report 05000317/2022090 ML19261A0832019-09-18018 September 2019 R. E. Ginna Nuclear Power Plant: Design Bases Assurance Inspection (Teams) Report 05000244/2019010 and Notice of Violation IR 05000244/20160092016-09-20020 September 2016 LLC - Final Significance Determination for a White Finding with Assessment Follow-up and Notice of Violation - Inspection Report 05000244/2016009 ML16262A2132016-09-20020 September 2016 LLC - Final Significance Determination for a White Finding with Assessment Follow-up and Notice of Violation - Inspection Report 05000244/2016009 IR 05000220/20150082015-04-10010 April 2015 Notice of Violation - Severity Level III Problem - NRC IR 05000220/2015008 and 05000410/2015008 IR 05000244/20150072015-02-24024 February 2015 Notice of Violation - Severity Level III Problem - NRC Inspection Report 05000244/2015007 IR 05000318/20140102014-10-27027 October 2014 EA-14-100 - Calvert Cliffs Nuclear Power Plant, Unit 2 - Final Significance Determination for a White Finding with Assessment Follow-Up and Notice of Violation (NRC Inspection Report 05000318/2014010) IR 05000317/20120082012-11-0101 November 2012 Notice of Violation - Constellation Energy Nuclear Group MEMO ML12213A1822012-11-0101 November 2012 Notice of Violation - Constellation Energy Nuclear Group Memo IR 05000220/20120082012-11-0101 November 2012 Notice of Violation - Constellation Energy Nuclear Group MEMO IR 05000244/20120072012-11-0101 November 2012 Notice of Violation - Constellation Energy Nuclear Group MEMO IR 05000220/20100092011-03-24024 March 2011 IR 05000220-10-009 and Investigation Report 1-2010-026 ML0931602002009-11-12012 November 2009 EA-09-249, R. E. Ginna Nuclear Power Plant, LLC, Notice of Violation - NRC Inspection Report No. 05000244-09-008 IR 05000244/20090082009-11-12012 November 2009 EA-09-249, R. E. Ginna Nuclear Power Plant, LLC, Notice of Violation - NRC Inspection Report No. 05000244-09-008 IR 05000244/20090022009-06-0808 June 2009 IR 05000244-09-002, for R. E. Ginna - Final Significance Determination of White Finding with Assessment Follow-up, and Notice of Violation ML0907608932009-03-16016 March 2009 Notice of Violation - NRC Investigation Report No. 1-2008-018 IR 05000244/20085022008-04-0707 April 2008 R. E. Ginna Nuclear Power Plant - Notice of Violation, NRC Supplemental Inspection Report No. 05000244/2008502 IR 05000220/20060112007-03-13013 March 2007 EA-07-007, Nine Mile Point - Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report 05000220/2006011; 05000410/2006-011) IR 05000317/20060122006-10-27027 October 2006 EA-06-198, Final Significance Determination for White Findings and Notice of Violation (NRC Inspection Reports Nos. 05000317/200612 and 05000318-2006012 - Calvert Cliffs Nuclear Power Plant) ML0532001892005-11-16016 November 2005 IA-05-062, Restani, Notice of Violation and Expiration of License ML0523003592005-08-18018 August 2005 IA-05-007, Notice of Violation and Confirmatory Order (Effective Immediately) (NRC Office of Investigations Report No. 1-2004-005) ML0523002652005-08-18018 August 2005 EA-05-025, Nine Mile Point Nuclear Station, Notice of Violation NRC Office of Investigations Report No. 1-2004-005 ML0409003572004-03-30030 March 2004 EA-04-003, Ginna, Notice of Violation, OI Investigations Report 1-2003-021 ML0409004872004-03-30030 March 2004 IA-04-005, B. Flynn, Notice of Violation, OI Report 1-2003-021 IR 05000220/20030032003-05-23023 May 2003 EA-03-053, Nine Mile Point, Notice of Violation and White Finding for IR 05000220-03-003 ML0233002832002-11-26026 November 2002 EA-02-121, EA-02-142, Peach Bottom, NOV & Green and White Findings ML0229504172002-10-22022 October 2002 IA-02-041, Diprospero, Notice of Violation ML0227700652002-10-0404 October 2002 Final Significance Determination for White Finding EA-02-141 & Notice of Violation ML0225302982002-09-0909 September 2002 EA-02-159, Calvert Cliffs, Notice of Violation and White Finding IR 05000317/20020042002-08-19019 August 2002 EA-02-138, Calvert Cliffs, Final Significance Determination for White Finding & NOV (IR 05000317-02-004 & IR 05000318-02-004) ML18018B0742000-03-27027 March 2000 ADAMS Distribution Notification ML18018B0771997-12-29029 December 1997 Letter Replying to Notice of Violation as Contained in NRC Inspection Report 50-220/97-07 and 50-410/97-07 ML18018B0781997-10-15015 October 1997 Letter Replying to Notice of Violation Contained in NRC Inspection Report 97-06, Dated September 15, 1997 ML18018B0921991-01-0202 January 1991 Letter Enclosing a Response to the Notice of Violation Contained in Inspection Report 50-410/90-09 Dated December 4, 1990 2023-10-26
[Table view] Category:Inspection Report
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 IR 05000317/20230502024-04-18018 April 2024 Final ASP Analysis - Calvert Cliffs Nuclear Power Plant (Unit 2), Failure to Establish and Implement Adequate Maintenance Practices Contributes to the Failure of EDG 1A (IR 05000317/2023050) - Reject IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 IR 05000317/20234012023-09-18018 September 2023 Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) IR 05000317/20230022023-08-0303 August 2023 Integrated Inspection Report 05000317/2023002 IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 2024-09-24
[Table view] |
Text
November 1, 2012 EA-12-030
Mr. Henry B. Barron President and Chief Executive Officer Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 200c Baltimore, MD 21202
SUBJECT:
NINE MILE POINT NUCLEAR STATION, R. E. GINNA NUCLEAR POWER PLANT AND CALVERT CLIFFS NUCLEAR POWER PLANTS
- NOTICE OF VIOLATION; NRC INSPECTION REPORTS NO. 05000220/2012008 & 05000410/2012008; 05000317/2012008 & 05000318/2012008; 05000244/2012007
Dear Mr. Barron:
The purpose of this letter is to provide you with the final results of the apparent violation identified in NRC Inspection Report Nos. 05000220/2012008 & 05000410/2012008; 05000317/2012008 and 05000318/2012008; and 05000244/2012007, dated April 3, 2012.
At Constellation Energy Nuclear Groups (CENGs) request, a predecisional enforcement conference (PEC) was conducted at NRC headquarters in Rockville, MD on April 30, 2012 with you and members of the Constellation staff to discuss CENGs position on regulatory issues related to your license transfer application involving Electricite de France (EDF). A meeting summary is available under Agencywide Documents Access Management System (ADAMS) Accession No. ML12136A553.
Based on the information developed during an NRC investigation (Office of Investigations Report No. 1-2010-037) and the information that you subsequently provided during the conference, the NRC has determined that a violation of NRC requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding it were discussed with you, and described in our April 3, 2012 letter (ADAMS Accession No. ML12089A097). It is our conclusion that CENG failed to provide complete and accurate information about the transfer of control of the licenses in accordance with paragraph 50.9(a) of Title 10 of the Code of Federal Regulations (10 CFR) when it amended the Operating Agreement but did not inform the NRC.
On April 8, 2009, Constellation provided supplemental license transfer application information to the NRC stating, In order to implement the planned changes, CEG [Constellation Energy Group, Inc.] and EDF may amend the form of operating agreement for CENG. The amendments will affect provisions relating to cash distributions from CENG and other minor matters, but will not involve any changes to the governance provisions in Article VII or any other provisions that are material to NRCs pending review of the license transfer application.
However, between April 2009 and September 21, 2009, Constellation made changes to the provisions in Article VII of the Operating Agreement and failed to provide these changes to the NRC.
Barron 2 On October 8, 2009, the NRC sent Constellation the draft safety evaluation (SE) containing the proposed conditions for the license transfers for review to ensure accuracy. The SE and the draft transfer conditions referenced the staffs evaluation of unanimous consent issues listed in Article VII of the Operating Agreement provided in the January 2009 application and supplemented in April 2009. Constellation provided an electronic file that same day containing its comments on the draft SE, but failed to inform the NRC that the unanimous consent provisions in Article VII of the Operating Agreement referenced in the draft SE had changed.
Had the NRC staff known that changes would be made, it would have requested and evaluated them in preparing the license transfer Order and accompanying safety evaluation.
This issue was viewed as potentially significant because it impacted the NRCs ability to perform its regulatory function related to foreign ownership, control, or domination matters in the license transfer review. Escalated enforcement was initially considered for this violation, in accordance with the Enforcement Policy. However, after a detailed review of all available information, the NRC determined that this violation is best characterized at Severity Level IV based on the determination that there were no actual safety consequences and that the potential safety consequences were minimal because there was not enough evidence to support a conclusion that there would be foreign control over safety decisions. Although this violation meets the NRC Enforcement Policy criteria to disposition it as a non-cited violation, the NRC is issuing the enclosed Notice because of the issues discussed above.
In addition, as discussed in our letter of April 3, 2012, CENGs failure to properly coordinate and communicate information about the license transfers also resulted in the staffs identification of concerns in the areas of decommissioning financial assurance and financial qualifications.
During the April 30, 2012 PEC, you stated that the issue of decommissioning financial assurance was the result of a miscommunication with the staff. You stated that the commercial arrangement between the parents of CENG (Constellation and EDF) was established for Constellation to provide EDF a contractual indemnification and that CENG would continue to meet its decommissioning requirements. Regarding financial qualifications, you stated during the PEC that at the time of the January 2009 application and April 2009 supplement Constellation and CENG did not know of any timing issues surrounding closing process steps, and that when CENG became aware of the delay you immediately notified the NRC staff.
Although insufficient evidence exists to warrant further enforcement action in these areas, the problems caused by Constellations self-acknowledged inadequate coordination and communication, were avoidable. While the NRC ultimately approved your application, CENGs untimely submittal of material information resulted in the NRC staff expending significant resources, and required the NRC to re-evaluate and modify the SE to reissue the Order based on new information. The NRCs expectation is that the actions you outlined at the PEC will improve your internal policies to avoid such situations in the future. For NRC regulated licensing activities, licensees are required to submit complete and accurate information at the time of application, and they have a responsibility to update the staff when information materially relevant to that information changes.
The NRC has concluded that information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence and the date when full compliance was achieved is already adequately addressed on the docket in the information you provided at the PEC on April 30, 2012 (ADAMS Accession No. ML12136A553). Therefore, you are not required to respond to this letter unless the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to provide additional information, you should follow the instructions specified in the enclosed Notice.
Barron 3 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosures, and any response, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction. If personal privacy or proprietary information is necessary to provide an acceptable response, please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you request withholding of such information, you must specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.390(b) to support a request for withholding confidential commercial or financial information).
If you have any questions concerning this matter, please contact Christopher Regan, of my staff at 301-415-2768.
Sincerely, /RA/ Ho K. Nieh, Director Division of Inspection & Regional Support Office of Nuclear Reactor Regulation Docket Nos.: 50-317/318; 50-244; 50-220/410 License Nos.: DPR-53/69; DPR-63/NPF-69; DPR-18
Enclosure:
Notice of Violation
ML12213A182 OFFICE NRR/DIRS/IPAB NRR/DIRS/IFIB NRR/DIRS/SLS NRR/DIRS/IFIB/BC(A) NAME J. Bowen A. Simmons T. Fredrichs R. Turtil DATE 08/01/12 08/01/12 (Non-concur) 09/20/12 (Non-concur) 10/18/12 OFFICE OE RI OGC NRR/DIRS/DD NAME J. Wray W. Dean* C. Scott R. Franovich DATE 10/18/12 10/23/12 10/25/12 10/26/12 NOTICE OF VIOLATION Constellation Energy Nuclear Group, LLC Docket Nos. 50-317/318; 50-244; 50-220/410 Calvert Cliffs, Nine Mile Point, and Ginna License Nos. DPR-53/69; DPR-18; DPR-63/NPF-69 EA-12-030
10 CFR 50.9(a), states, in part, that information provided to the Commission by a licensee or information required by statute or by the Commissions regulations to be maintained by the licensee shall be complete and accurate in all material respects.
Contrary to the above, Constellation failed to provide complete and accurate information regarding changes made to its January 22, 2009 license transfer application with respect to foreign ownership, control, or domination. Specifically, between April 2009 and September 21, 2009, Constellation made changes to the governance provisions in Article VII of the Operating agreement and failed to provide these changes to the NRC. In its January 22, 2009 license transfer application Constellation stated, The post closing CENG will be operating under the terms of a Second Amended and Restated Operating Agreement (Operating Agreement). On April 8, 2009, Constellation provided supplemental license transfer application information to the NRC stating, In order to implement the planned changes, CEG and EDF may amend the form of operating agreement for CENG. The amendments will affect provisions relating to cash distributions from CENG and other minor matters, but will not involve any changes to the governance provisions in Article VII [emphasis added] or any other provisions that are material to NRCs pending review of the license transfer application. This was material to the NRC, because had it been identified that changes would be made, the staff would have requested and evaluated them for compliance with foreign ownership, control, or domination requirements.
This is a Severity Level IV violation.
The NRC has concluded that information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence and the date when full compliance was achieved is already adequately addressed on the docket in the information you provided at the PEC on April 30, 2012 (ADAMS Accession No. ML12136A553). However, you are required to submit a written statement or explanation pursuant to 10 CFR 2.201 if the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to respond, clearly mark your response as a Reply to a Notice of Violation; EA-12-030 and send it to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001 with a copy to the Director, Office of Enforcement, the Regional Administrator, Region I, and a copy to the NRC Resident Inspectors at the facility that is a subject of this Notice, within 30 days of the date of this letter transmitting this Notice of Violation (Notice). If you contest this enforcement action, submit a written statement with the basis of your denial to the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.
If you chose to respond, your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Therefore, to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction.
In accordance with 10 CFR 19.11, you may be required to post this Notice within two working days of receipt.
Dated this 1 st Day of November 2012