ML18256A375

From kanterella
Revision as of 06:48, 31 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC Section Iii, Div 5
ML18256A375
Person / Time
Issue date: 09/11/2018
From: Andrew Yeshnik
Office of Nuclear Regulatory Research
To:
Mehta S N
Shared Package
ML18256A356 List:
References
Download: ML18256A375 (5)


Text

NRCStandardsForum:NRCEndorsementofASMEBPVCSectionIII,Division5AndrewYeshnikSeptember11,2018 Background -FY16-17ImplementationActionPlans(July2017)tosupportNRCVisionandStrategy(December2016)1.Acquire/developsufficientstaffknowledge,tech.skills,capacitytoperformnonLWRregulatoryreviews2.Acquire/developsufficientcomputercodes/toolstoperformnonLWRregulatoryreviews3.Establishamoreflexible,RIPBnonLWRreviewprocesswithintheboundsofexistingregulations,incl.CDAs,stagedreviews4.Facilitateindustrycodes&standardsdevelopmentneededtosupportthenonLWRlifecycle,includingfuels&materials5.Identify&resolvetechinclusivenonLWRpolicyissues6.Developastructured,integratedcommunicationsstrategyforinternalandexternalstakeholderswithnonLWRinterests)

NRC Endorsement of ASME BPVC Section III, Division 5

  • Currentnuclearpowerdesignsoperatewithinathermalrangeof275°Cto315°C.*Advancedreactordesignshaveoperatingthermalrangesthatvarywidelybetween480°Cand1000°C.*ThereisnoNRCendorsedcodeofconstructionfornuclearreactorsoperatingabove425°C(800°F).*AmericanSocietyofMechanicalEngineersBoilerandPressureVesselCode(ASMEBPVC)SectionIII,Division5providesdesign,construction,certification,andqualityassurancerulesformetalliccomponentsoperatinginexcessof800°F,graphitecorestructures,andceramiccompositecomponents.
  • AletterdatedJune21,2018fromASME(ML18184A065)requestedthattheNRCreviewandendorsethe2017EditionofASMEBPVCSectionIII,Division5(NRCResponseLetter:ML18211A571)

Review and Endorsement Process

  • NRO LeadwithsupportfromRES/DEandNRR/DE*Objective:OfficialNRCEndorsementofthe2017EditionofASMEBPVCSectionIII,Division5*AnticipatedProduct(August2020):Adraftregulatoryguideforpubliccommentthatincludesthe2017ASMEBPVCodeSectionIII,Division5asanendorsedmethodofconstructingAdvancedReactorDesigns,subjecttoanyconditionsthestaffdeemsnecessary.
  • TheNRCisparticipatingontwoASME/NRCtaskgroups:-MetallicMaterials-GraphiteandCeramics*Contractors:PNNL,ORNL,ANL,Commercial
  • Stakeholderengagementthroughoutthereview Review and Endorsement ProcessCurrentStatus:*TheendorsementteamhasstartedTaskA,ProjectPlanning-Establishingthescope,schedule,andNRCpointsofcontact*Process:Project Planning(Task A)Review of Low Temperature and General Requirements (QA) Rules (Task B)Review of High Temperature Metal Rules (Task C)Review of Graphite Rules (Task D)Review of Code Cases (Task E)DraftRG(TaskF)