ML063520022

From kanterella
Revision as of 09:39, 25 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2006/12/15-Pilgrim - Letter Informing the Administrative Judges and Parties That the Staff'S Hearing File Index Has Been Updated
ML063520022
Person / Time
Site: Pilgrim
Issue date: 12/15/2006
From: Roth D E
NRC/OGC
To: Abramson P B, Cole R F, Young A M
Atomic Safety and Licensing Board Panel
Giitter R L
References
50-293-LR, ASLBP 06-848-02-LR
Download: ML063520022 (26)


Text

December 15, 2006Administrative JudgeAdministrative JudgeRichard F. ColePaul B. Abramson Atomic Safety and Licensing Board PanelAtomic Safety and Licensing Board Panel Mail Stop: T-3F23Mail Stop: T-3F23 U.S. Nuclear Regulatory CommissionU.S. Nuclear Regulatory Commission Washington, DC 20555-0001Washington, DC 20555-0001Administrative JudgeAnn Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001In the Matter ofEntergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.(Pilgrim Nuclear Power Station)Docket No. 50-293-LR; ASLBP No. 06-848-02-LR

Dear Administrative Judges:

The NRC Staff hereby provides its notice that it has updated the hearing file for thisproceeding pursuant to 10 C.F.R. § 2.336(d) as modified by the Board's Order Regarding Schedule for Proceeding and Related Matters (November 29, 2006). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. The Staff is also producing, as Attachment 2, updates to its privilege logs as required by 10 C.F.R. § 2.336(b)(5), and is continuing to preserve and maintain all privileged documents during the pendency of this R. ColeDecember 15, 2006P. Abramson A. Young-2-proceeding. Also attached are the Affidavit of Perry Buckley, as required by 10 C.F.R.§ 2.336(c), and the Declaration of Pao-Tsin Kuo, Acting Director of the Division of License Renewal, formally invoking the deliberative process privilege.Sincerely,/RA/David E. RothCounsel for the NRC Staff

Enclosures:

Hearing File IndexPrivilege Log - Deliberative Process Affidavit of Perry Buckberg Declaration of Pao-Tsin Kuocc:Attached Service List Page 1 of 2ATTACHMENT 1 PILGRIM LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURESHEARING FILE INDEXSupplement 1 - December 15, 2006Accession NumberDocument DateTitle/Description:01-01ML06159023203/07/200603/07/2006 - RIC 2006 Presentation - T1F - Garry G.Young - License Renewal.01-02ML06347005105/01/2006(PD) Ecology Meeting Notes Pilgrim Nuclear PowerStation Site Audit on May 1, 2006.01-03ML06347007205/02/2006(PD) Pilgrim Nuclear Power Station License RenewalSite Audit Off-Site Meetings May 2-4, 2006 Draft Meeting Notes.01-04ML06347006705/18/2006(PD) PNPS LR EIS Ecology Meeting May 18, 2006.

01-05ML06292026510/03/20062006/10/03-EMAIL: (PA) FW Waste Minimization Plan.

01-06ML06290023111/02/2006Request for Additional Information for the Review of thePilgrim Nuclear Power Station License Renewal Application (TAC MC9669).01-07ML06348035111/02/2006E-mail: (PD) Draft RAI.

01-08ML06348040211/06/2006E-MAIL: (PD) Fwd: Entergy Nuclear Cultural ResourcesProtection Plan.01-09ML06296027411/07/2006Request for Additional Information for the Review of thePilgrim Nuclear Power Station License Renewal Application (TAC MC9669) (Section B.1.16.1).01-10ML06276050811/07/2006Summary of Conference call on September 25, 2006,with Entergy Nuclear Operations, Inc.01-11ML06345008611/08/2006E-MAIL: (PA) Nuclear-Impacted Communities [from J.Berger to A. Williamson].

Accession NumberDocument DateTitle/Description:Page 2 of 201-12ML06345008411/11/2006E-MAIL: (PA) Request for Additional Information (RAI)Regarding Severe Accident Mitigation Alternatives (SAMA) for Pilgrim Nuclear Power Station, May 22, 2006.01-13ML06345008211/13/2006E-MAIL: (PA) Re: Nuclear-Impacted Communities [to J.Berger].01-14ML06345008111/14/2006E-MAIL: (PA) Re: Request for Additional Information(RAI) Regarding Severe Accident Mitigation Alternatives (SAMA).01-15ML06345007911/16/2006E-MAIL: (PA) Fwd: Re: Nuclear-Impacted Communities.

01-16ML06348032311/16/2006E-MAIL: (PD) Pilgrim PT Curve Amendment MD1218Conference Call.01-17ML06348032811/17/2006E-MAIL: (PD) WP copy of RAI Letter.

01-18ML06328007311/28/2006Request for Additional Information Regarding SevereAccident Mitigation Alternatives for Pilgrim Nuclear Power Station (TAC NO. MC9676).01-19ML06348038911/30/2006E-mail: (PD) SAMA RAI.

Page 1 of 17ATTACHMENT 2: PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURESPRIVILEGE LOG - DELIBERATIVE PROCESS PRIVILEGESupplement 1: December 15, 2006Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRCStaff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R.§ 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage Count DP-01-01ML0634605 29SzeligowskiJ, Earth Tech,IncE-mail: (PD) PhoneCall with Bob Schaaf.3/29/2006E-Mail, Noteto File inclTelcon Record,VerbalCommDuda S, HurleyB, - Earth Tech,IncStaff commentsregarding phone call 1 DP-01-02ML0634703 34SzeligowskiJ, Earth Tech,IncE-MAIL: (PD) PhoneLog - USEPA.3/30/2006E-Mail, Noteto File inclTelcon Record,VerbalCommDuda S, HurleyB, - Earth Tech,IncStaff commentsregarding phone call 3 DP-01-03ML0634703 18SzeligowskiJ, Earth Tech,IncE-MAIL: (PD)Conversation withMA Div. MarineFisheries.3/30/2006E-MailDuda S, HurleyB, - Earth Tech,IncStaff commentsregarding phone call 1 DP-01-04ML0634605 32SzeligowskiJ, Earth Tech,IncE-MAIL: (PD) Re:Pilgrim - Cape WindMarineArchaeological Assessment.3/30/2006E-MailSchaaf R G, NRCContains staffrecommendationsregarding tribereferencedocument.

1 PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 2 of 17 DP-01-05ML0634703 23SzeligowskiJ, Earth Tech,IncE-MAIL: (PD)Conversation withBob Schaaf [sent4/3/06].4/3/2006E-Mail, Noteto File inclTelcon Record,VerbalCommDuda S, HurleyB, - Earth Tech,IncStaff commentsregarding phone call 3 DP-01-06ML0634702 34SzeligowskiJ, - EarthTech, IncE-MAIL: (PD) Re:Pilgrim writing -Abbreviations forcommon use.4/5/2006E-MailFlynn C, HurleyB, - Earth Tech,IncStaff comments and recommendations 1 DP-01-07ML0634702 19SzeligowskiJ, Earth Tech,IncE-MAIL: (PD)Conversation withRobert Walker.4/6/2006E-MailSchaaf R G, NRCStaff notes andrecommendationsfrom phone call 1 DP-01-08ML0634605 22SzeligowskiJ, Earth Tech,IncE-MAIL: (PD) PhoneCall with Bob Schaaf[4/10/06].4/10/2006E-MailBesson M, Duda S,Pappalardo M,Stehling N, -Earth Tech, IncStaff commentsregarding phone call 1 DP-01-09ML0634605 44SzeligowskiJ, Earthtech,IncE-MAIL: (PD) IssuesQuestions REV02041406.doc.4/14/2006E-Mail,Report,Miscellaneou sSchaaf R, -

NRCStaffrecommendationsfor questions 7 DP-01-10ML0634605 24SzeligowskiJ, Earth Tech,IncE-MAIL: (PD)Conversation with Bob Schaaf[4/18/06].4/18/2006E-MailDuda S, FlynnC, Hurley B, -Earth Tech, IncStaff commentsregarding phone call 1 PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 3 of 17 DP-01-11ML0631101 33Rubin M P,NRC/NRR/ADRA/DRA/AP LA(NPA-PD-LR) Memoto R. Franovich Re:Request forAdditionalInformation toSupport the Staff'sSevere AccidentMitigation AlternativeReview for PilgrimNuclear PowerStation (TAC No.MC9676).4/26/2006MemorandaFranovich R L,NRC/NRR/ADRO/DLR/REBAInternal memo withrecommendedquestions 8 DP-01-12ML0634702 25Flynn C, -Earth Tech,IncE-MAIL: (PD) Re:Draft AuditChecklists.4/26/2006E-MailHurley B,Szeligowski J, -Earth Tech, IncRecommendationsand deliberation onchecklist 2 DP-01-13ML0634605 48ProvenzanoS, EarthTech, IncE-MAIL: (PD) Re:Meeting withMarshfield-PNPSSite Audit.4/28/2006E-MailParker A,Szeligowski J,Earth Tech, IncCommentsregarding meeting 1 DP-01-14ML0634700 52, NRC(PD) MeetingMinutes: PNPS SiteAudit Meeting withUS EPA Region 1,MA Coastal ZoneManagement Dept.Of EnvironmentalProtection and Div.Of Maine Fisherieson May 3, 2006.5/3/2006MeetingMinutes, Impressions of site audit 4 PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 4 of 17 DP-01-15ML0634605 27SzeligowskiJ, Earth Tech,IncE-MAIL: (PD)Conversation withBob Schaaf.5/10/2006E-MailFlynn C, HurleyB, Spera M, -Earth Tech, IncCommentsregarding phone call 1 DP-01-16ML0634702 64Parker A, -Earth Tech,Inc.E-MAIL: (PD) AuditNotes.5/11/2006E-Mail, NoteProvenzano S,- Earth Tech,Inc.Draft ofrecommendationsfrom meeting 10 DP-01-17ML0634604 88ProvenzanoS, - EarthTech, Inc.E-MAIL: (PD) Re:Audit Notes.5/15/2006E-MailParker A, -Earth Tech,Inc.Comments on site audit 10 DP-01-18ML0634700 46ProvenzanoS, EarthTech, Inc(PD) Additionalquestion for Entergy5/15/06.5/15/2006- NoDocumentType Applies, Contains internalstaffrecommendation 2 DP-01-19ML0634702 13ProvenzanoS, EarthTech, IncE-MAIL: (PD) PNPSSite Audit Notes[from S.Provenzano].5/15/2006E-MailSzeligowski J, -Earth Tech,Inc.Comments on site audit 2 DP-01-20ML0634702 16Parker A, NRCE-MAIL: (PD) Re:PNPS Site AuditNotes.5/16/2006E-MailProvenzano S,Earth Tech, IncCommentsregarding site audit 10 DP-01-21ML0634700 59, NRC(PD) Pilgrim LicenseRenewal Meetingwith NMFS May 16, 2006.5/16/2006MeetingSummary, Comments frommeeting 6 DP-01-22ML0634702 83Flynn C, NRCE-MAIL: (PD) Re:Pilgrim humanhealth/epidemiologystudies.8/4/2006E-MailDuda S,Provenzano S,Earth Tech, IncComments andrecommendationsre: SEIS 1 PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 5 of 17 DP-01-23ML0634503 83 Duda S,Earth Tech,IncE-MAIL: (PD) RE:EFH outline.8/7/2006E-MailNash H L, NRCComments andrecommendationsre: SEIS 3 DP-01-24ML0634503 85Nash H L, NRCE-MAIL: (PD) RE:EFH outline [from H.Nash].8/10/2006E-MailDuda S, EarthTech, IncComments andrecommendationsre: SEIS 3 DP-01-25ML0634702 24Flynn C, -Earth Tech,Inc.E-MAIL: (PD) Re:NRC Section [sent8/29/06].8/29/2006E-MailCraig N, EarthTech, IncComments andrecommendationsre: SEIS 1 DP-01-26ML0634702 20Flynn C, -Earth Tech,Inc.E-MAIL: (PD) Re:NRC Review [sent8/29/06].8/29/2006E-MailCraig N, EarthTech, IncComments andrecommendationsre: SEIS 1 DP-01-27ML0634702 91Flynn C, -Earth Tech,Inc.E-MAIL: (PD) Re:NRC Review.9/1/2006E-MailCraig N, EarthTech, IncComments andrecommendationsre: SEIS 1 DP-01-28ML0634703 06Flynn C, -Earth Tech,Inc.E-MAIL: (PD) PilgrimDEIS, new andsignificantinformation.9/1/2006E-MailCraig N, EarthTech, IncComments andrecommendationsre: SEIS 1 DP-01-29ML0634703 17SzeligowskiJ, Earth Tech,IncE-MAIL: (PD) Pilgrim- Chapter 8.9/1/2006LetterDuda S, ParkerA, ProvenzanoS, - Earth Tech,IncComments andrecommendationsre: SEIS 1 DP-01-30ML0634700 40Fulford P, -No KnownAffiliationE-MAIL: (PD) PilgrimCOF.9/5/2006E-MailGreen K,Meyer J, PallaR L, ISL, Inc, NRCPersonalimpressions re:conflict of interest 3

PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 6 of 17 DP-01-31ML0634702 84Flynn C R,Earth Tech,IncE-MAIL: (PD) PNPSUprate Discrepancy.9/7/2006E-MailCraig N, HurleyB, - Earth Tech,IncComments andrecommendationsre: SEIS 1 DP-01-32ML0634703 39Flynn C, NRCE-MAIL: (PD) Re:NRC Section.9/7/2006E-MailCraig N, EarthTech, IncComments andrecommendationsre: SEIS 2 DP-01-33ML0634702 93Flynn C R,Earth Tech,IncE-MAIL: (PD) FW:PNPS DEIS sections4.3 and 4.8.3.9/7/2006E-MailHurley B, EarthTech, IncComments andrecommendationsre: SEIS 1 DP-01-34ML0634702 95Flynn C R,Earth Tech,IncE-MAIL: (PD) Re:PNPS UprateDiscrepancy.9/8/2006E-MailCraig N, HurleyB, Earth Tech,Inc, NRCComments andrecommendationsre: SEIS 4 DP-01-35ML0634703 00Flynn C R,Earth Tech,IncE-MAIL: (PD) Re:Question on PilgrimRadiological Section2.2.7.9/11/2006E-MailDuda S, HurleyB, - Earth Tech,IncComments andrecommendationsre: SEIS 1 DP-01-36ML0634703 08Flynn C,Earth Tech,IncE-MAIL: (PD) Ltr toBob from C. Flynn ofEarth Tech.9/13/2006Letter, - No KnownAffiliationComments andrecommendationsre: SEIS 4 DP-01-37ML0634703 03Flynn C, -Earth Tech,Inc.E-mail: (PD)Southeastern MassHealth Study(SMHS).9/13/2006E-MailDover R, - NoKnownAffiliationComments andrecommendationsre: SEIS 2 DP-01-38ML0634702 87Flynn C,Earth Tech,IncE-MAIL: (PD) Re:

PNPS DEIS section4.3 and 4.8.3.9/17/2006E-MailHurley B, EarthTech, IncComments andrecommendationsre: SEIS 3 PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 7 of 17 DP-01-39ML0634503 86 Duda S,Earth Tech,IncE-MAIL: (PD) PNPS- Sect 2.10/4/2006E-MailNash H L, NRCComments andrecommendationsre: SEIS 2 DP-01-40ML0634503 90Nash H L, NRCE-MAIL: (PD) Re:PNPS - impingementand entrainmentoccurrences XCL.10/6/2006E-MailDuda S, EarthTech, IncComments andrecommendationsre: SEIS 2 DP-01-41ML0634504 21 Duda S,Earthtech, IncE-mail: (PD) Re:PNPS - impingementand entrainmentoccurrences (from S.Duda).10/6/2006E-MailNash H L, NRCComments andrecommendationsre: SEIS 3 DP-01-42ML0634503 87 Duda S,Earth Tech,IncE-MAIL: (PD) PNPS- impingement andentrainmentoccurances.10/6/2006E-MailNash H L, NRCComments andrecommendationsre: SEIS 2 DP-01-43ML0630403 96Segala J P,NRC/NRR/ADES/DSS/SB PBDraft SafetyEvaluation ReportInput for PilgrimNuclear PowerStation LicenseRenewal ApplicationSections 2.2 "Plant-Level ScopingResults" and 2.3"Scoping andScreening Results."11/2/2006Draft SafetyEvaluationReport(DSER),Memoranda Lund A L,NRC/NRR/ADRO/DLR/RLRAComments andrecommendationsre: Draft SER 61 PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 8 of 17 DP-01-44ML0634803 57Ellis D E,Entergy CorpE-MAIL: (PD) BranchTechnical Position9.5-1 and AppendixA for Pilgrim (DocketNo. 50-293) [dated11/2/06 from D. Ellisto P. Buckberg andR. Auluck].11/2/2006E-MailAuluck R C,Buckberg P H, NRCComments andrecommendationsre: draft SER 3 DP-01-45ML0631101 40 Duda S,Earth Tech,Inc.NOTE: (NPA-PD-LR)Pilgrim Exhibit F411/3/2006Note, Comments andrecommendationsre: SEIS 1 DP-01-46ML0631101 35 Duda S,Earth Tech,Inc.NOTE: (NPA-PD-LR)SouthMassachusettsHealth Study.11/3/2006Note, Comments andrecommendationsre: SEIS 1 DP-01-47ML0634502 92Nash H L, NRCE-MAIL: (PD) Re:Pilgrim Sec. 4.8.2.11/6/2006E-MailDillard S,Earthtech, IncComments andrecommendationsre: SEIS 2 DP-01-48ML0634804 25PappalardoM, EarthTech, IncE-MAIL: (PD) Re:Entergy NuclearCultural ResourcesProtection Plan.11/6/2006E-MailWilliamson A R, NRCComments andrecommendationsre: draft SEIS 2 DP-01-49ML0634502 93Franovich RL, NRCE-MAIL: (PD) P2Sentence for 2.1.5,Pilgrim and VY.11/6/2006E-MailEmch R L, MuirJ M, Pham BM, Schaaf R G,Williamson A, NRCComments andrecommendationsre: SEIS 2 PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 9 of 17 DP-01-50ML0634502 96Nash H L, NRCE-mail (PD) Fwd:marine mammalwriteup.11/7/2006E-MailWilliamson A R, NRCComments andrecommendationsre: SEIS 4 DP-01-51ML0630601 89Dennig R L,NRC/NRR/ADES/DSS/SC VBRequest forAdditionalInformation - PilgrimResponse to GenericLetter (GL) 2003-01,"Control RoomHabitability" (TACNo. MB9840)11/7/2006Memoranda,Request forAdditionalInformation(RAI)Chernoff H K,NRC/NRR/ADRO/DORL/LPLI-2Recommendationsre: RAI 3 DP-01-52ML0634803 53Buckberg PH, NRCE-mail: (PD) Fwd:Branch TechnicalPosition 9.5-1 andAppendix A forPilgrim (Docket No.50-293) [dated11/7/06 follow up toe-mail sent 11/2/06].11/7/2006E-MailIqbal N, NRCComments andrecommendationsre: draft SER 2 DP-01-53ML0634502 89Mitchell J A, NRCE-mail: (PD) Fwd:Reference to DavidChains web site.11/8/2006E-MailLui C H, PallaR L, Yerokun JE, NRCImpression re:website 4 DP-01-54ML0634803 84Meyer G W, NRCE-MAIL: (PD) Re:Pilgrim drywell -onsite followup of UTdata.11/8/2006E-MailBlough A R,Conte R J, Hiland P L,Lund L, O'HaraT L, NRCComments andrecommendationsre: draft SER 3

PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 10 of 17 DP-01-55ML0631805 00Wilson G,NRC/NRR/ADES/DEPilgrim NuclearPower Station - DraftSafety EvaluationInput for LicenseRenewal ApplicationSection .5 (TAC NO.MC9669)11/8/2006Memoranda,SafetyEvaluationReport, Draft Lund L A,NRC/NRR/ADRO/DLR/RLRAComments andrecommendationsre: Draft SER 8 DP-01-56ML0634803 17Blough A R, NRCE-MAIL: (PD) Re:Pilgrim drywell -onsite followup of UTdata [dated 11/9from R. Blough tomultiple recipents].11/9/2006E-MailConte R J, Hiland P L, Lund A L,Meyer G W,O'Hara T L, NRCComments andrecommendationsre: draft SER 4 DP-01-57ML0633402 38Buckberg PH, NRC/NRREMAIL: (NPA-PD-LR) Fwd: Re: PilgrimDrywell - OnsiteFollowup of UT Data.11/9/2006E-MailDavis J A,NRC/NRRRecommendationre: RAI 4 DP-01-58ML0634502 98Palla R L, NRCE-MAIL: (PD)Information NeededFrom Entergy forPilgrim Contentions.11/9/2006E-MailWilliamson A R, NRCRecommendationre: RAI 2 DP-01-59ML0634503 51Williamson AR, NRCE-MAIL: (PD) Re:Fwd: EntergyNuclear Cultural ResourcesProtection Plan.11/13/2006E-MailDavis J, EmchR L, NRCComments andrecommendationsre: SEIS 2 PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 11 of 17 DP-01-60ML0634502 99 Lund A L, NRCE-MAIL: (PD) Re:Pilgrim Governmentto GovernmentDebrief.11/14/2006E-MailMcLaughlin MM, NRCComments andimpressions re:meeting with localgovernment 3 DP-01-61ML0634503 01Muir J M,NRC/NRR/ADRO/DLR/RE BAE-MAIL: (PD) Sct2.1.5 paragraph.11/14/2006E-MailWilliamson A R, NRCComments andrecommendationsre: SEIS 2 DP-01-62ML0633403 20Cwalina G C,NRC/NRR/A DESY020060252 - TomGurdziel Email re.Concerns Deficiencyin the GE-DesignedUpper Support forReactor CoresShroud Tie Rods11/16/2006E-MailGurdziel T,NRC/NRRImpressions andcomments from phoneconversation 2 DP-01-63ML0634503 40Kotzalas M A, NRCE-MAIL: (PD) Pilgrim- meteorologicalassistance.11/17/2006E-MailWilliamson A R, NRCRecommendationsre: conference call 2 DP-01-64ML0634503 43Kotzalas M A, NRCE-MAIL: (PD) Re:Fwd: 2006/11/16-LBOrder (AdministrativeMatters RegardingTelephoneConference) [from M.Kotzalas].11/17/2006E-MailBrown L A,Williamson A R, NRCRecommendationsre: conference call 2

PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 12 of 17 DP-01-65ML0634503 55Williamson AR, NRCE-MAIL: (PD) Re:Fwd: 2006/11/16-LBOrder (AdministrativeMatters RegardingTelephoneConference.11/17/2006E-MailBrown L A,Kotzalas M A, NRCRecommendationsre: conference call 2 DP-01-66ML0634502 90Adams S A,NRC/NRR/PMAS/PCMBE-MAIL: (PD) DraftStatement of Work.11/20/2006E-Mail,Statement ofWork, SandiaNational Labs(SNL)Draft statement ofwork withcomments 10 DP-01-67ML0634503 58Williamson AR, NRCE-MAIL: (PD) PNPSSAMA Contention.11/21/2006E-MailBrock K M,Brown L A,Greene N A,Mitchell J A,Rikhoff J J, NRCComments andrecommendationsre: SEIS 2 DP-01-68ML0634803 34Sydnor C R, NRCE-MAIL: (PD) FYI:Pilgrim LRA -Postponement of SEon TLAAs pendingresolution of fluencemethod/benchmarkin g.11/21/2006E-MailBuckberg P H,Cheruvenki GS, Diaz-CastilloY, Mitchell M A, NRCComments andrecommendationsre: draft SER 3 DP-01-69ML0634503 62Williamson AR, NRCE-MAIL: (PD) PilgrimDraft SEIS Press Release.11/22/2006E-MailSheehan N A, NRCComments on draftSEIS press release 4

PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 13 of 17 DP-01-70ML0633402 40Wen P C,NRC/NRREMAIL: (NPA-PD-LR) BWRVIP-139(Commitment #37).11/22/2006E-MailMcCaughey B,AdvancedTechnologies &

LabsInternational,IncComments andrecommendationson draft SER 3 DP-01-71ML0634803 37Lambros L, NRCE-MAIL: (PD) Re:Fwd: FYI: PilgrimLRA - Postponementof SE on TLAAspending resolution offluencemethod/benchmarkin g.11/22/2006E-MailBuckberg P H,Cheruvenki GS, Shea J J, NRCComments andrecommendationsre: draft SER 3 DP-01-72ML0634503 46Palla R L, NRCE-MAIL: (PD)Meeting re:Contentions.11/27/2006E-MailWilliamson A R, NRCComments andrecommendationsre: SEIS 2 DP-01-73ML0633403 28Khanna M K, NRC Y020060252 -Concerns Deficiencyin the GE-DesignedUpper Support forReactor CoresShroud Tie Rods(Email from MeenaKhanna, Dated11/27/2006, RE:Y020060252, Letterfrom Tom Grudziel toMichael Wallace).11/27/2006E-MailEusebio L, NRCComments andrecommendationsre: draft SER 4

PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 14 of 17 DP-01-74ML0634803 43Cheruvenki GS, NRCE-MAIL: (PD) Pilgrim- LRA.11/27/2006E-MailBuckberg P H, NRCComments andrecommendationsre: draft SER 3 DP-01-75ML0634804 42Wen P C, NRCE-mail: (PD) Re:Pilgrim - LRA [fromP. Wen].11/27/2006E-MailBuckberg P H,Cheruvenki GS, NRCComments andrecommendationsre: draft SER 3 DP-01-76ML0634804 31Cheruvenki GS, NRCE-MAIL: (PD) Fwd:RPV internals -Pilgrim.11/27/2006E-MailBuckberg P H, NRCComments andrecommendationsre: draft SER 2 DP-01-77ML0634503 49Franovich RL, NRCE-MAIL: (PD) Phonecall with Garry Young[from R. Franovich].11/27/2006E-MailEmch R L,Williamson A R, NRCComments re:following up on phone call 2 DP-01-78ML0634803 48Meyer G W, NRCE-mail: (PD) Input toEntergy Drop-in; LRInspection Status.11/28/2006E-MailBuckberg P H,Lund L A, NRCComments andrecommendationsre: draft SER 3 DP-01-79ML0634803 11Cheruvenki GS, NRCE-MAIL: (PD) Fwd:Pilgrim - LRA [dated11/28/06 from G.Cheruvenki to J.Davis].11/28/2006E-MailDavis J A, NRCComments andrecommendationsre: draft SER 4 DP-01-80ML0634503 66Young G G,Entergy CorpE-MAIL: (PD) Re:Phone Call withGarry Young [fromG. Young].11/28/2006E-MailWilliamson A R, NRCComments andrecommendationsre: meeting 2

PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 15 of 17 DP-01-81ML0634503 07Cheruvenki GS, NRCE-MAIL: (PD) Fwd:Pilgrim - LRA [fromG. Cheruvenki on11/28/06].11/28/2006E-MailDavis J A, NRCComments andrecommendationsre: draft SER 4 DP-01-82ML0634503 04Franovich RL, NRCE-MAIL: (PD) Re:SAMA RAIConference Call -Thursday @ 2:30pmEST [from R.Franovich].11/29/2006E-MailWilliamson A R, NRCComments andrecommendationsre: conference call 3 DP-01-83ML0634804 37Cheruvenki GS, NRCE-MAIL: (PD) Fwd:Pilgrim - LRA [dated11/29/06 from G.Cheruvenki to J.Davis].11/29/2006E-MailDavis J D, NRCComments andrecommendationsre: draft SER 4 DP-01-84ML0634503 10Cheruvenki GS, NRCE-MAIL: (PD) Fwd:Pilgrim - LRA.11/29/2006E-MailDavis J D, NRCComments andrecommendationsre: draft SER 6 DP-01-85ML0634503 08Wen P C, NRCE-MAIL: (PD) Fwd:FW: NRC Commentson Pilgrim Draft SERSection 3.1.11/29/2006E-MailDavis J A, NRCComments andrecommendationsre: draft SER 5

PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 16 of 17 DP-01-86ML0633504 77Samaddar S K,NRC/NRR/ADES/DESafety EvaluationInput RegardingSection 2.4, "Scopingand Screening Results: Structures,"Pilgrim NuclearPower StationLicense RenewalApplication (TACMC9669).11/30/2006Memoranda,SafetyEvaluation Lund L A,NRC/NRR/ADRO/DLR/REBBComments andrecommendationsre: draft SER 22 DP-01-87ML0634605 38Williamson AR, NRCE-MAIL: (PD) Re:SAMA RAIConference Call -Thursday @ 2:30pmEST.11/30/2006E-MailFranovich R L, NRCComments andrecommendationsre: conference call 3 DP-01-88ML0634503 63Williamson AR, NRCE-MAIL: (PD) Re:SAMA RAIConference Call-Thursday @ 2:30pm EST11/30/2006E-MailFranovich R L, NRCComments andrecommendationsre: conference call 3

PDP No.AccessionNumberAuthorName/Affiliation:Title/Description:DocumentDateDocumentTypeAddressee /AddresseeAffiliationCommentPage CountPage 17 of 17 DP-01-89ML0633901 98Hamzehee H G,NRC/NRR/ADES/DE/EQV BDraft SafetyEvaluation with OpenItems RegardingEntergy NuclearOperations, Inc.,License RenewalApplication forPilgrim NuclearPower Station, datedJanuary 27, 2006.12/1/2006Draft SafetyEvaluationReport(DSER),MemorandaKuo P T,NRC/NRR/ADRO/DLRComments andrecommendationsre: draft SER 38 December 15, 2006UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONBEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)

)ENTERGY NUCLEAR GENERATION )Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR)

OPERATIONS, INC.)ASLBP No. 06-848-02-LR

)(Pilgrim Nuclear Power Station))

AFFIDAVIT OF PERRY BUCKBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c) I, Perry Buckberg, do hereby state as follows:1.I am employed as a Project Manager in the Division of License Renewal in theNuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a project manager for the Pilgrim Nuclear Power Station's license renewal application ("LRA"). 2.I hereby certify that all relevant materials required to be disclosed pursuant to10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.3.I declare under penalty of perjury that the foregoing is true and correct to the bestof my knowledge, information and belief./Original Signed By/

______________________Perry BuckbergExecuted in Rockville, MDthis 15 th day of December, 2006 December 15, 2006UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONBEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)

)ENTERGY NUCLEAR GENERATION )Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR)

OPERATIONS, INC.)ASLBP No. 06-848-02-LR

)(Pilgrim Nuclear Power Station))

DECLARATION OF PAO-TSIN KUOI, Pao-Tsin Kuo, do hereby state as follows:

1. I am employed as the Acting Director of the Division of Licensing Renewal("DLR") in the Nuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation

("NRR"). My supervisory responsibilities include oversight of the NRC Staff's review and evaluation of the Pilgrim Nuclear Power Station license renewal application.2. As part of their responsibilities in preparing the hearing file and mandatorydisclosures for these proceedings, NRC staff members under my supervision identified several documents as privileged because they contained information concerning the Staff's deliberative process. Those documents are listed in Attachment 2 to the December 15, 2006, submission of the Staff's Hearing File.3. I have personally reviewed the documents identified as privileged inAttachment 2, and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain predecisional information concerning the Staff's review of the license renewal application. All documents contain either the Staff's analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part of the deliberative process necessary to the Staff's review of the pending license renewalapplication.4. Further, I have determined that disclosure of these documents could result inharm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill allfuture deliberations and would interfere with the Staff's ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.5. Accordingly, I formally invoke the deliberative process privilege with respect toeach of the documents listed in Attachment 2 to the December 15, 2006 submission of the Hearing File Supplement 1.6. I declare under penalty of perjury that the foregoing is true and correct to thebest of my knowledge, information and belief. /Original Signed By/

_______________________

Pao-Tsin KuoExecuted in Rockville, MDthis 15 th day of December, 2006 UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONBEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)

)ENTERGY NUCLEAR OPERATIONS, INC. )Docket No. 50-293-LR

)

(Pilgrim Nuclear Power Station) )ASLBP No. 06-848-02-LR

) CERTIFICATE OF SERVICEI hereby certify that copies of the letter notifying the administrative judges and the parties that the hearing file and mandatory disclosures, privilege log, accompanying declaration, and affidavit in the above-captioned proceeding have been served on the following by electronicmail and deposit in the U.S. Mail Service or by deposit in the U.S. Nuclear Regulatory Commission's internal mail system as indicated by a single asterisk(*), or by deposit in the U.S.

mail system, as indicated by a double asterisk (**) this 15 th day of December, 2006.Administrative Judge*Richard F. Cole Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: rfc1@nrc.govAdministrative Judge*Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: amy@nrc.govSheila Slocum Hollis**Duane Morris LLP 1667 K Street, NW, Suite 700 Washington, DC 20006 E-mail: sshollis@duanemorris.comAdministrative Judge*Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: pba@nrc.govOffice of Commission Appellate

  • Adjudication Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: OCAAMail@nrc.govOffice of the Secretary*Attn: Rulemaking and Adjudications Staff Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: hearingdocket@nrc.gov Atomic Safety and Licensing Board*Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001Molly H. Bartlett, Esq.**52 Crooked Lane Duxbury, MA 02332 E-mail: mollyhbartlett@hotmail.comChief Kevin M. Nord**Fire Chief & Director Duxbury Emergency Management Agency 668 Tremont Street Duxbury, MA 02332 E-mail: nord@town.duxbury.ma.usFax: 781-934-6530Terence A. Burke, Esq.**Entergy Nuclear 1340 Echelon Parkway Mail Stop: M-ECH-62 Jackson, MS 39213David R. Lewis, Esq.**Paul A. Gaukler, Esq.

Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, NW Washington, DC 20037-1137 E-mail: david.lewis@pillsburylaw.compaul.gaukler@pillsburylaw.comTown Manager**Town of Plymouth 11 Lincoln St.

Plymouth, MA 02360 E-mail: msylvia@townhall.plymouth.ma.us/RA/ David E. Roth Counsel for the NRC Staff