ML020440797
ML020440797 | |
Person / Time | |
---|---|
Issue date: | 01/10/2002 |
From: | Bateman W H NRC/NRR/DE/EMCB |
To: | Marion A Nuclear Energy Institute |
References | |
IEB-01-001 | |
Download: ML020440797 (3) | |
Text
Mr. Alex Marion, Director Engineering Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, D.C. 20006-3708
SUBJECT:
RESPONSE TO NOVEMBER 20, 2001, LETTER CONCERNING PUBLICRELEASE OF EPRI PROPRIETARY INFORMATION
Dear Mr. Marion:
By letter dated November 20, 2001, you requested that the staff release to EPRI the completeproprietary version of the NRC report, Preliminary Staff Technical Assessment for PressurizedWater Reactor Vessel Head Penetration Nozzles Associated with NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, datedNovember 2001. A non-proprietary version of the report was publicly released by the staff on November 6, 2001.The staff has discussed this report with EPRI, and by electronic mail (e-mail) datedDecember 3, 2001, Mr. C. Welty of EPRI agreed that the report can be publicly released as written with the following editorial corrections: 1)Reference 1 should read: "Presentation by P. Scott at Meeting of MRP Crack GrowthReview Team for Alloy 600 and Alloy 182, Arlie, VA, October 2-4, 2001," and 2)In the Reference Section the following references are EPRI Proprietary documents /items: 1, 3, 13, 15, 19, 22, 28, 33 and 34.The NRC staff has made the appropriate modifications to the report, as requested, and therevised report has been issued. A copy of the revised report is enclosed.If you have any question regarding this letter, please contact Mr. Allen Hiser of my staff at 301-415-1034.Sincerely, /ra/Mr. William H. Bateman, ChiefMaterials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: See next page Mr. Alex Marion, DirectorEngineering Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, D.C. 20006-3708
SUBJECT:
RESPONSE TO NOVEMBER 20, 2001, LETTER CONCERNING PUBLICRELEASE OF EPRI PROPRIETARY INFORMATION
Dear Mr. Marion:
By letter dated November 20, 2001, you requested that the staff release to EPRI the completeproprietary version of the NRC report, Preliminary Staff Technical Assessment for PressurizedWater Reactor Vessel Head Penetration Nozzles Associated with NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, datedNovember 2001. A non-proprietary version of the report was publicly released by the staff on November 6, 2001.The staff has discussed this report with EPRI, and by electronic mail (e-mail) datedDecember 3, 2001, Mr. C. Welty of EPRI agreed that the report can be publicly released as written with the following editorial corrections: 1)Reference 1 should read: "Presentation by P. Scott at Meeting of MRP Crack GrowthReview Team for Alloy 600 and Alloy 182, Arlie, VA, October 2-4, 2001," and 2)In the Reference Section the following references are EPRI Proprietary documents /items: 1, 3, 13, 15, 19, 22, 28, 33 and 34.The NRC staff has made the appropriate modifications to the report, as requested, and therevised report has been issued. A copy of the revised report is enclosed. If you have any question regarding this letter, please contact Mr. Allen Hiser of my staff at 301-415-1034.Sincerely, Mr. William H. Bateman, ChiefMaterials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: See next page Distribution
- EMCB R/FSDuraiswamy
JLarkins JAZwolinskiWDLanningCCasto JGrobe AHowell PCWenDocument Name: C:\Program Files\Adobe\Acrobat 4.0\PDF Output\NEI Proprietary Information.wpdINDICATE IN BOX: "C"=COPY W/O ATTACHMENT/ENCLOSURE, "E"=COPY W/ATT/ENCL, "N"=NO COPY EMCB:DEEEMCB:DEEMCB:DEEMCB:DECECarpenter:cecALHiser:alhBJElliot (A):bjeWHBateman:whb 01/ 7 /02 01/ 8 /0201/8 /0201/ 10 /02 cc:Ralph Beedle, Senior Vice President and Chief Nuclear Officer Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708Mr. Jack Bailey, Chair Materials Reliability Program 1101 Market Street - LP 6A Chattanooga, TN 37402Larry Mathews, MRP Southern Nuclear Operating Company Manager, Inspection and Testing Services P. O. Box 1295 Birmingham, AL 35201Vaughn Wagoner, Technical Chair Assessment Committee Carolina Power & Light Company One Hannover Square 9C1 P.O. Box 1551 Raleigh, NC 27612Frank Ammirato, EPRI Inspection Manager EPRI NDE Center P. O. Box 217097 1300 W. T. Harris Blvd.
Charlotte, NC 28221C. Thomas Alley, Jr., Technical Chair Inspection Task Duke Power Company Nuclear General Office 526 South Church Street Mail Code EC09O PO Box 1006 Charlotte NC 28201Avtar Singh, EPRI MRP ManagerChuck Welty, EPRI MRP Manager Allan McIlree, EPRI Assessment Manager Christine King, EPRI MRP Manager Electric Power Research Institute P. O. Box 10412 3412 Hillview Ave.
Palo Alto, CA 94303Gary D. Moffatt, Technical Chair Repair/Mitigation Task V. C. Summer Nuclear Station P. O. Box 88 Jenkinsville, SC 29065