ML020440797
ML020440797 | |
Person / Time | |
---|---|
Issue date: | 01/10/2002 |
From: | Bateman W NRC/NRR/DE/EMCB |
To: | Marion A Nuclear Energy Institute |
References | |
IEB-01-001 | |
Download: ML020440797 (3) | |
Text
Mr. Alex Marion, Director Engineering Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, D.C. 20006-3708
SUBJECT:
RESPONSE TO NOVEMBER 20, 2001, LETTER CONCERNING PUBLIC RELEASE OF EPRI PROPRIETARY INFORMATION
Dear Mr. Marion:
By letter dated November 20, 2001, you requested that the staff release to EPRI the complete proprietary version of the NRC report, Preliminary Staff Technical Assessment for Pressurized Water Reactor Vessel Head Penetration Nozzles Associated with NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, dated November 2001. A non-proprietary version of the report was publicly released by the staff on November 6, 2001.
The staff has discussed this report with EPRI, and by electronic mail (e-mail) dated December 3, 2001, Mr. C. Welty of EPRI agreed that the report can be publicly released as written with the following editorial corrections:
- 1) Reference 1 should read: Presentation by P. Scott at Meeting of MRP Crack Growth Review Team for Alloy 600 and Alloy 182, Arlie, VA, October 2-4, 2001," and
- 2) In the Reference Section the following references are EPRI Proprietary documents /
items: 1, 3, 13, 15, 19, 22, 28, 33 and 34.
The NRC staff has made the appropriate modifications to the report, as requested, and the revised report has been issued. A copy of the revised report is enclosed.
If you have any question regarding this letter, please contact Mr. Allen Hiser of my staff at 301-415-1034.
Sincerely,
/ra/
Mr. William H. Bateman, Chief Materials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: See next page
Mr. Alex Marion, Director Engineering Nuclear Energy Institute 1776 I Street, N.W., Suite 400 Washington, D.C. 20006-3708
SUBJECT:
RESPONSE TO NOVEMBER 20, 2001, LETTER CONCERNING PUBLIC RELEASE OF EPRI PROPRIETARY INFORMATION
Dear Mr. Marion:
By letter dated November 20, 2001, you requested that the staff release to EPRI the complete proprietary version of the NRC report, Preliminary Staff Technical Assessment for Pressurized Water Reactor Vessel Head Penetration Nozzles Associated with NRC Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles, dated November 2001. A non-proprietary version of the report was publicly released by the staff on November 6, 2001.
The staff has discussed this report with EPRI, and by electronic mail (e-mail) dated December 3, 2001, Mr. C. Welty of EPRI agreed that the report can be publicly released as written with the following editorial corrections:
- 1) Reference 1 should read: Presentation by P. Scott at Meeting of MRP Crack Growth Review Team for Alloy 600 and Alloy 182, Arlie, VA, October 2-4, 2001," and
- 2) In the Reference Section the following references are EPRI Proprietary documents /
items: 1, 3, 13, 15, 19, 22, 28, 33 and 34.
The NRC staff has made the appropriate modifications to the report, as requested, and the revised report has been issued. A copy of the revised report is enclosed.
If you have any question regarding this letter, please contact Mr. Allen Hiser of my staff at 301-415-1034.
Sincerely, Mr. William H. Bateman, Chief Materials and Chemical Engineering Branch Division of Engineering Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: See next page Distribution:
EMCB R/F WDLanning SDuraiswamy CCasto JLarkins JGrobe JAZwolinski AHowell PCWen Document Name: C:\Program Files\Adobe\Acrobat 4.0\PDF Output\NEI Proprietary Information.wpd INDICATE IN BOX: C=COPY W/O ATTACHMENT/ENCLOSURE, E=COPY W/ATT/ENCL, N=NO COPY EMCB:DE E EMCB:DE EMCB:DE EMCB:DE CECarpenter:cec ALHiser:alh BJElliot (A):bje WHBateman:whb 01/ 7 /02 01/ 8 /02 01/8 /02 01/ 10 /02
cc:
Ralph Beedle, Senior Vice President Mr. Jack Bailey, Chair and Chief Nuclear Officer Materials Reliability Program Nuclear Energy Institute 1101 Market Street - LP 6A Suite 400 Chattanooga, TN 37402 1776 I Street, NW Washington, DC 20006-3708 Larry Mathews, MRP Vaughn Wagoner, Technical Chair Southern Nuclear Operating Company Assessment Committee Manager, Inspection and Testing Services Carolina Power & Light Company P. O. Box 1295 One Hannover Square 9C1 Birmingham, AL 35201 P.O. Box 1551 Raleigh, NC 27612 Frank Ammirato, EPRI C. Thomas Alley, Jr., Technical Chair Inspection Manager Inspection Task EPRI NDE Center Duke Power Company P. O. Box 217097 Nuclear General Office 1300 W. T. Harris Blvd. 526 South Church Street Charlotte, NC 28221 Mail Code EC09O PO Box 1006 Charlotte NC 28201 Avtar Singh, EPRI MRP Manager Gary D. Moffatt, Technical Chair Chuck Welty, EPRI MRP Manager Repair/Mitigation Task Allan McIlree, EPRI Assessment Manager V. C. Summer Nuclear Station Christine King, EPRI MRP Manager P. O. Box 88 Electric Power Research Institute Jenkinsville, SC 29065 P. O. Box 10412 3412 Hillview Ave.
Palo Alto, CA 94303