ACCELERATED DIS UTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9201240009 DOC.DATE: 92/01/10 NOTARIZED:
NO DOCKET FACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 AUTH.NAME AUTHOR AFFILXATION CONWAY,W.F.
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Requests extension of scheduled completion date for Unit 2 implementation of Generic ltr 89-10 until end of fifth refueling outage.Completion of testing by end of fourth refueling outage would impose schedule.ng burden.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:
General Distribution D NOTES:Standardized plant.05000529 RECXPXENT ID CODE/NAME PD5 LA TRAMMELL, C INTERNAL: ACRS NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB8H7 NUDOCS-ABSTRACT OGC/HDS 1 RES/DS IR/EX B EXTERNAL: NRC PDR NOTES: COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD5 PD THOMPSON,M NRR/DET/ECMB 7D NRR/DOEA/OTSB11 NRR/DST/SELB 7E NRR/DST/SRXB 8E OC/LFMB R G FTEE~-0'1-NSIC COPXES LTTR ENCL 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.-20079)
TO ELIMINATE YOUR NAME I'ROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL~P
,I~1 I Arizona Public Service Company P.O.BOX 53999~PHOENIX.ARIZONA 85072<999 WILLIAM F.CONWAY EXECUTIVEVICEPRESIOENT NUCLEAR 161-04562-WFC/JMQ January 10, 1992 Docket Nos.STN 50-528/529/530 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-37 Washington, D.C.20555
Dear Sirs:
Subj ect: Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Date of Implementation of Program Defined in Generic Letter 89-10 and Schedular Extension for Unit 2 Testing File: 92-056-026 The purpose of this letter is two fold.The first is to provide a date of implementation of the program defined in Generic Letter 89-10 as requested by Mr.Charles M.Trammell of your staff and secondly to request an extension from the schedular requirements of Generic Letter 89-10 in Unit 2, The Program Plan for PVNGS to test Motor Operated Valves (MOVs)was approved and implemented on June 28, 1990.Arizona Public Service Company (APS)is testing MOVs in Units 1 and 3 in accordance with schedular recommendations of Generic Letter 89-10 and its supplements.
However, APS requests an extension for PVNGS Unit 2 from the schedular requirements to complete implementation of Generic Letter 89-10 (within five years.or three refueling outages of June 28, 1989)to the end of the Unit 2 fifth refueling outage.The Unit 2 fifth refueling outage is expected to be completed approximately ninety days beyond the program implementation schedule of five years from the date of the Generic Letter.PVNGS Unit 2 started its second refueling outage on February 24, 1990, approximately eight months after the Generic Letter date of June 28, 1989.Although Unit 2 was able to implement rewire design change packages and perform diagnostic baseline tests on the majority of program MOVs, there was not sufficient time for design-basis'ynamic test procedure development, test preparations and outage schedule changes.To complete Unit 2 testing by the end of the fourth refueling outage would impose a scheduling burden causing the unit to remain shutdown longer than planned because of the number of MOVs to be tested during the third and fourth refueling outages.Innnnm 9201240009 000529 PDR ADOCK 050 P y gn/Ijp v i'I~
161-04562-WFC/JMQ January 10, 1992 U.S.Nuclear Regulatory Commission Attn: Document Control Desk GL 89-10 Page 2 Supplement 1 to Generic Letter 89-10, Results of the Public Workshops, states in its response to Question 41 that although the Generic Letter specifies, that refueling outages starting within six months of June 28, 1989, need not be counted as one of the three outages allowed for program completion, the NRC would consider licensees with refueling outages scheduled shortly after this six-month period when evaluating requests for schedular extension.
Therefore, based upon the fact that Unit 2 began its outage approximately eight months after the issuance of Generic Letter 89-10, APS requests an extension of the scheduled completion for Unit 2 implementation of Generic Letter 89-10 through the end of the Uni.t 2 fifth refueling outage.If you should have any questions, please contact Michael E.Powell of my staff at (602)340-4981.Sincerely, WFC/JMQ/pmm CC: J.B.Martin C.M.Trammell D.H.Coe A.C.Gehr A.H.Gutterman
~~