Reader'S Guide for the Draft Environmental Impact Statement for an Early Site Permit at the Clinch River Nuclear Site.
ML18092A515
Person / Time
Site: Clinch River
Issue date: 04/25/2018
From: Tami Dozier, Vokoun P J
NRC/NRO/DNRL
To:
Vokoun P
References
Download: ML18092A515 (48)


Text

(Photo courtesy of Joseph Colaccino, NRC)

An ESP does not authorize the actual construction and operation of a new nuclear power plant.