MONTHYEARML19070A0282019-06-21021 June 2019 Draft Summary Rod for Clinch River Nuclear Site ESP ML19045A6212019-04-0303 April 2019 Reader'S Guide for the Final Environmental Impact Statement for an Early Site Permit at the Clinch River Nuclear Site ML18220A7772018-08-0808 August 2018 Summary from Staff'S Examination of Geologic Features at Tva'S Clinch River Nuclear Site During a 30-31 January 2018 NRC Management Site Visit CNL-18-059, Submittal of Revised Site Safety Analysis Report Subsection 2.4.2.2, Flood Design Considerations, and Subsection 2.4.3.5, Probable Maximum Flood Flow, and Figure 2.4.3-3 in Support of Early Site Permit Application for Clinch River Nuclear2018-04-27027 April 2018 Submittal of Revised Site Safety Analysis Report Subsection 2.4.2.2, Flood Design Considerations, and Subsection 2.4.3.5, Probable Maximum Flood Flow, and Figure 2.4.3-3 in Support of Early Site Permit Application for Clinch River Nuclear S ML18092A5152018-04-25025 April 2018 Reader'S Guide for the Draft Environmental Impact Statement for an Early Site Permit at the Clinch River Nuclear Site. ML19037A2702016-09-30030 September 2016 State of Tenn General NPDES Permit for Discharges of Stormwater Associated with Construction Activities (Permit No. TNR100000) ML18064A8942013-09-18018 September 2013 DOE Oak Ridge Groundwater Strategy 2013 ML18054A3932006-11-30030 November 2006 Phase I Cultural Resources Survey of the Kingston-Oak Ridge National Laboratory 161-KV Transmission Line Project, Anderson and Roane Counties, Tennessee; Revised Draft Report (Redacted) ML18318A0992003-08-31031 August 2003 Conservation Assessment for Appalachian Bugbane ML18054A4411995-05-31031 May 1995 K-25 Site, Oak Ridge Reservation, Oak Ridge, Tennessee, K-25 Cultural Resources Survey; May 1995 (Redacted) ML18064A8931985-01-31031 January 1985 the Clinch River Breeder Reactor Plant Project Final Report Breeder Reactor Corporation ML18054A4751974-10-31031 October 1974 Archaeological Survey with Emphasis on Prehistoric Sites of the Oak Ridge Reservation, Oak Ridge, Tennessee; October 1974 (Redacted) 2019-06-21
[Table view] Category:Miscellaneous
MONTHYEARML19070A0282019-06-21021 June 2019 Draft Summary Rod for Clinch River Nuclear Site ESP ML19045A6212019-04-0303 April 2019 Reader'S Guide for the Final Environmental Impact Statement for an Early Site Permit at the Clinch River Nuclear Site ML18092A5152018-04-25025 April 2018 Reader'S Guide for the Draft Environmental Impact Statement for an Early Site Permit at the Clinch River Nuclear Site. 2019-06-21
[Table view] |
Text
(Photo courtesy of Joseph Colaccino, NRC)
An ESP does not authorize the actual construction and operation of a new nuclear power plant.
Federal Register
(Photo courtesy of Andrew King, U.S. Fish and Wildlife Service)
- (Photo courtesy of the TVA)
- Code of Federal Regulations*************