|
---|
Category:Audit Plan
MONTHYEARML18199A2732018-07-25025 July 2018 GEH ABWR DC Renewal Audit Plan - PCT Increase 2018-07-25
[Table view] Category:Memoranda
MONTHYEARML19171A2932019-06-27027 June 2019 ABWR DC Renewal Issue 18b Section 9.1.2.2 New and SFP Racks Seismic Structural Analysis Rev 4 ML19136A2812019-05-29029 May 2019 Regulatory Audit Results Summary Report for the Advanced Boiling-Water Reactor Design Certification Renewal Peak Cladding Temperature Increase ML18234A4322019-02-0404 February 2019 Memo SE with No Open Items GEH ABWR Subsection 6.2.1.6 ML18164A1102019-02-0404 February 2019 Memo - GEH ABWR DC Renewal SE for Subsection 6.2.1.3 ML18354B1672019-01-24024 January 2019 ABWR DC Renewal - ECCS Suction Strainer Design Audit Report ML19002A3932019-01-11011 January 2019 Memo to ACRS - GEH Advanced Boiling Water Reactor DC Renewal Safety Evaluation for Subsections 8.2.5 and 8.3.3.17 ML18312A1642018-12-0404 December 2018 Memo - GEH ABWR DC Renewal Safety Evaluation for Section 19.1, Probabilistic Risk Assessment ML18312A1622018-12-0404 December 2018 Safety Evaluation - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18312A1632018-12-0404 December 2018 Letter to Applicant - ABWR DC Renewal Safety Evaluation, Section 19.1, Probabilistic Risk Assessment ML18200A3202018-07-26026 July 2018 Memo to ACRS - GEH ABWR DC Renewal SE for Subsection 3.7.3 ML18199A2732018-07-25025 July 2018 GEH ABWR DC Renewal Audit Plan - PCT Increase ML18176A1432018-06-27027 June 2018 Memo to ACRS - GEH ABWR DC Renewal SE for Section 13.5 ML18157A2152018-06-11011 June 2018 Summary of Teleconference to Discuss Open Items Associated with the Review of the Advanced Boiling Water Reactor Certification Renewal ML18088A2242018-04-0909 April 2018 Memo - Safety Evaluation with No Open Items GEH Advanced Boiling Water Reactor Section 13.3, Emergency Planning ML18029A2592018-01-31031 January 2018 Memo to ACRS - GEH ABWR DC Renewal SE for Section 12 2019-06-27
[Table view] |
Text
Code of Regulations
CODE OF FEDERAL REULATIONS
Code of Federal Regulations
An analysis and evaluation of the design and performance of structures, systems, and components with the objective of assessing the risk to public health and safety resulting from operation of the facility and including determination of the margins of safety during normal operations and transient conditions anticipated during the life of the facility, and the adequacy of structures, systems, and components provided for the prevention of accidents and the mitigation of the consequences of accidents.
Not less than 12 nor more than 36 months before the expiration of the initial 15-year period, or any later renewal period, any person may apply for renewal of the certification. An application for renewal must contain all information necessary to bring up to date the information and data contained in the previous application. The Commission will require, before renewal of certification, that information normally contained in certain procurement specifications and construction and installation specifications be completed and available for audit if this information is necessary for the Commission to make its safety determination. Notice and comment procedures must be used for a rulemaking proceeding on the application for renewal. The Commission, in its discretion, may require the use of additional procedures in individual renewal proceedings.