Pages that link to "ML20086D421"
Jump to navigation
Jump to search
The following pages link to ML20086D421:
Displayed 22 items.
- ML20085D157 (← links)
- ML20085D133 (← links)
- ML20085D117 (← links)
- ML20085D109 (← links)
- ML20085D105 (← links)
- ML20085D084 (← links)
- ML20085D077 (← links)
- ML20085D072 (← links)
- ML20085D066 (← links)
- ML20085D062 (← links)
- ML20084S912 (← links)
- ML20084S909 (← links)
- NG-75-1089, Revised AO 50-261/75-8:on 750429,RHR Suction Valve RHR-862A Failed.Caused by Torque Switch on Motor Operator Being Out of Adjustment,Causing Valve to Be Wedged Onto Seat & Preventing Motor from Opening Valve (← links)
- NG-75-1212, Revised AO 50-261/75-11:on 750527,RCS Oxygen Concentration Found to Be 0.16 Ppm,Exceeding Limit.Caused by Inattention to Hydrogen Concentration & Dilution of RCS to Hot Shutdown Boron Concentration.Vol Control Tank Vented (← links)
- NG-75-1044, AO 50-261/75-12:on 750625,boric Acid Transfer Pump a Failed. Caused by Pump Shaft Being Broken at Keyway.Pump Rebuilt & Reinstalled.New Pump Model GVH-10K Will Be Installed Upon Receipt (← links)
- NG-75-1158, AO 50-261/75-14:on 750715,valve V2-14B Steam Driven Auxiliary Feedwater Pump Discharge to Steam Generator B Failed to Open.Caused by Belleville Spring Being Filled W/Grease.Belleville Spring Packs & Shafts to Be Inspected (← links)
- NG-75-1575, AO 50-261/75-15:on 750921,more than One Inoperable Rod Present W/Reactor at Power as Result of Rod Control Urgent Failure.Caused by Defective Fuse in Ac Power Supply to Rod Control Cabinet 1AC.Fuse Replaced (← links)
- NG-75-2001, AO 50-261/75-16:on 751028,svc Water Booster Pump B Failed to Start.Caused by Actuation of Pump Suction Pressure Switches Provided to Protect Pumps from Low Npsh.Containment Recirculation Fans Stopped to Prevent Overheating Motors (← links)
- NG-75-2010, AO 50-261/75-17:on 751101,both Containment Personnel Air Lock Doors Opened Simultaneously W/Rcs Temp Above 200 F, Violating Tech Spec 3.6.1.a.Caused by Broken Rod,Bearing & Cam Follower on Outer Door Mechanism (← links)
- NG-75-2017, AO 50-261/75-18:on 751102,auxiliary Feedwater Pump a Failed to Start Following Safety Injection Signal.Caused by Tarnished Contacts.Contacts within Local/Remote Switch Cleaned.Further Investigation Underway (← links)
- NG-75-2210, AO 50-261/75-19:on 751208,boron Concentration Found Below Limits in Safety Injection Accumulator B.Cause Not Stated. Accumulator Partially Drained & Refilled from Refueling Water Storage Tank (← links)
- NG-75-2222, AO 50-261/75-20:on 751210,channel 950 of Containment Pressure Protection Found Inoperable.Caused by Open Output Fuse in Comparator PC-950.Fuse Replaced (← links)