Pages that link to "ML15176A531"
Jump to navigation
Jump to search
The following pages link to ML15176A531:
Displayed 33 items.
- DCL-03-111, License Amendment Request 03-12 Revision to Technical Specifications 3.3.1, RTS Instrumentation, and 3.3.2, ESFAS Instrumentation, Enclosures 1 - 4 (← links)
- DCL-03-095, Supplement 1 to License Amendment Request 03-05, Revision of Technical Specification (TS) 3.7.10, Control Room Ventilation System (Crvs). TS 3.7.12. Auxiliary Building Ventilation System (Abvs). TS 3.7.13 (← links)
- DCL-03-084, License Amendment Request 03-11, Revision to Technical Specifications Associated with DC Electrical Power Systems (← links)
- DCL-03-080, Response to NRC Request for Additional Information Regarding License Amendment Request 03-03, Revision to TS 3.5.2 - Increase in Completion Time for Charging Pump During Unit 1 Cycle 12 from 72 Hours to 7 Days (← links)
- DCL-03-069, License Amendment Request 03-09, Revision of TS 3.1.7, Rod Position Indication 3.2.1, Heat Flux Hot Channel Factor, 3.2.4, Quadrant Power Tilt Ratio, & 3.3.1, Reactor Trip System Instrumentation for Beacon Implementation (← links)
- DCL-03-067, License Amendment Request 03-08 Revision to Technical Specification 3.5.1, Emergency Core Cooling Systems/Accumulator. (← links)
- DCL-03-060, License Amendment Request 03-06, Revision to Technical Specification 3.8.1, AC Sources - Operating. (← links)
- DCL-03-061, License Amendment Request 03-07, Revision to Technical Specifications (TS) 3.8.1 AC Sources - Operating & 3.8.4 DC Sources - Operating Surveillance Requirements (← links)
- DCL-02-115, License Amendment Request (LAR) 01-08, to Modify Technical Specification 3.4.11 & Licensing Basis to Credit Automatic Actuation of Class One Power Operated Relief Valves (Porvs) Instead of Pressurizer Safety Valves (Psvs) (← links)
- DCL-03-034, License Amendment Request 03-05 Revision of Technical Specification 3.7.10, Control Room Ventilation System, TS 3.7.12, Auxiliary Building Ventilation System, and TS 5.5.11, Ventilation Filter Testing Program. (← links)
- DCL-03-016, License Amendment Request 03-02, Response Time Testing Elimination & Revision to TS 3.3.1, Reactor Trip System Instrumentation (← links)
- DCL-03-019, Revision to TS 3.5.2 - Increase in Completion Time for Charging Pump During Unit 1 Cycle 12 from 72 Hours to 7 Days (← links)
- DCL-03-026, Emergency Request for Approval to Use an Alternative Method of Determining Probability of Detection for Steam Generator 4 Tube R44C45 Indication (← links)
- DCL-03-011, License Amendment Request 03-01, Revision to TS 3.3.1, Reactor Trip System Instrumentation (← links)
- DCL-02-125, License Amendment Request 02-06 Revisions to Technical Specifications 3.3.1 Reactor Trip System (RTS) Instrumentation and 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation. (← links)
- DCL-02-100, Request for Enforcement Discretion Re Compliance with Technical Specification 3.7.7, Vital Component Cooling Water (CCW) System. (← links)
- DCL-02-097, License Amendment Request 02-05, Revision to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation, & Revised Reactor Coolant System Flow Measurement (← links)
- DCL-02-079, Units, 1 and 2, License Amendment Request 02-04, Revision of Technical Specification 5.6.6 - Reactor Coolant System Pressure and Temperature Limits Report (← links)
- DCL-02-044, License Amendment Request 02-03, Spent Fuel Cask Handling (← links)
- DCL-02-038, License Amendment Request 02-02, Revision to Technical Specifications Re Suspension of Positive Reactivity Additions (← links)
- DCL-02-001, License Amendment Request 02-01, Revision to Technical Specification SR 3.0.3, Missed Surveillances (← links)
- DCL-20-066, License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System (← links)
- DCL-20-063, Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications (← links)
- DCL-20-092, License Amendment Request 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition (← links)
- DCL-21-020, Request for Revision to Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance (← links)
- DCL-21-019, Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition (← links)
- DCL-21-062, Independent Spent Fuel Storage Installation, License Amendment Request 21-04, Proposed Changes to the Diablo Canyon Power Plant Emergency Plan for Post-Shutdown and Permanently Defueled Condition (← links)
- ML21188A214 (← links)
- DCL-22-001, Supplement to License Amendment Request 20-03, Editorial Corrections to Diablo Canyon Power Plant Units 1 and 2 Operating Licenses (← links)
- DCL-22-010, License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System (← links)
- DCL-22-059, License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions (← links)
- DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (← links)
- DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System (← links)