Pages that link to "ND-19-1416, Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departure Report"
Jump to navigation
Jump to search
The following pages link to ND-19-1416, Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departure Report:
Displayed 35 items.
- NL-05-2346, Inservice Inspection Summary Report (← links)
- NL-19-1094, Refueling Outage 2R20 Steam Generator Tube Inspection Report (← links)
- NL-09-1570, Vogtle Electric Generating Plant, Units 1 & 2 - Response to Request to Request for Additional Information Related to Risk-Informed/Safety Based Inservice Inspection Alternative for Class 1 and 2 Piping, VEGP-ISI-ALT-02, Version 1 (← links)
- NL-05-1103, Inservice Inspection Summary Report (← links)
- ND-19-1416 (redirect page) (← links)
- ML19343B790 (redirect page) (← links)
- ND-19-0747, Preservice Test Plan, Version 2.0 (← links)
- ND-18-1504, Report of 10 CFR 50.59 Changes, Tests and Experiments and 10 CFR 52 Appendix D Departure Report (← links)
- ND-18-1401, Request for Alternative: Alternative Requirements for Preservice Testing of Explosively Actuated Valves (VEGP 3&4-PST-Alt-01) (← links)
- ND-18-1185, Request for Alternative: Preservice and Inservice Inspection Requirements for Specific Valve-to-Pipe Welds (VEGP 3&4-PSI/ISI-ALT-06) (← links)
- ND-18-1014, Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4 - PSI/ISI-ALT-10) (← links)
- NL-04-2413, 2R10 Steam Generator Tube Pull Test Results (← links)
- NL-04-1302, Inservice Inspection Summary Report (← links)
- NL-03-2383, Inservice Inspection Summary Report (← links)
- NL-03-0120, Inservice Inspection Summary Report (← links)
- ND-20-0601, Submittal of Inservice Testing Program Plan - 1st Interval (← links)
- ND-20-0645, Submittal of Preservice Test Plan - Version 3.0 (← links)
- NL-20-1011, Proposed Inservice Inspection Alternative VEGP-ISI-ALT-04-04 Version 2.0 (← links)
- NL-20-1086, Refueling Outage 1R22 Steam Generator Tube Inspection Report (← links)
- NL-20-1312, Response to Request for Additional Information Related to Proposed Inservice Inspection Alternative VEGP-ISI-ALT-04-04 Version 2.0 (← links)
- NL-20-1329, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1 R22 (← links)
- NL-21-0381, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R21 (← links)
- NL-21-0767, Proposed Alternative Requirements for the Repair of Reactor Vessel Head Penetrations for the 4th 10-Year Inservice Inspection Internal (VEGP-ISI-ALT-04-05, Version 1.0) (← links)
- NL-21-1130, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1 R23 (← links)
- NL-22-0227, Refueling Outage 1R23 Steam Generator Tube Inspection Report (← links)
- ND-22-0253, Submittal of Preservice Test Plan - Version 4.0 (← links)
- ND-22-0254, Submittal of Inservice Testing Program Plan - 1st Interval, Version 2.0 (← links)
- NL-22-0512, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R22 (← links)
- ML22180A261 (← links)
- NL-22-0778, Refueling Outage 2R22 Steam Generator Tube Inspection Report (← links)
- NL-23-0541, Inservice Inspection Program Owners Activity Report for Outage 1R24 (← links)
- NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) (← links)
- NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (← links)
- NL-24-0154, Preservice Inspection Progam Owners Activity Report (← links)
- NL-24-0031, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R23 (← links)