Pages that link to "1CAN041805, Supplemental Information Supporting the Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee ..."
Jump to navigation
Jump to search
The following pages link to 1CAN041805, Supplemental Information Supporting the Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee ...:
Displayed 38 items.
- 0CAN091801, Response to Request for Additional Information Related to the Application for Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 (← links)
- 0CAN121601, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima... (← links)
- 0CAN019160, Additional Questions Associated with Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis-Basis External Events (← links)
- ML19098A955 (← links)
- ML19232A379 (← links)
- RS-16-084, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- 1CAN111901, Response to Request for Additional Information Related to Request for Relief from American Society of Mechanical Engineers (ASME) Code Case N-729-4 Supplemental Examination Requirements ANO1-ISI-033 (← links)
- LR-N05-0342, Response to Request for Additional Information Regarding Amendment Request to Revise Technical Specification - Emergency Core Cooling Systems Tavg ≪ 350 F, Salem Generating Station - Unit 1 and Unit 2 (← links)
- NL-05-0732, Request for Relief from System Hydrostatic Test Requirements for Large Bore (≫ 1 Inch), ASME Code Class 1 Reactor Coolant Pressure Boundary (Rcpb), Process, Drain, Test, and Flush Lines and Connections (← links)
- ML19322A767 (← links)
- LR-N05-0003, Request for Change to Technical Specifications Emergency Core Cooling Systems Tavg <335 Degrees F, (← links)
- 2CAN022001, Response to Request for Additional Information Related to Alternative VRR-ANO2-2019-1 (← links)
- 0CAN022001, Response to Request for Additional Information Related to License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into the Licensing Basis (← links)
- ML20076C415 (← links)
- 2CAN092002, Response to Second Request for Additional Information Related to License Amendment Request Associated with Technical Specification Deletions, Additions, and Relocations (← links)
- 1CAN102002, Additional Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values (← links)
- ML20255A118 (← links)
- 0CAN112001, Relief Request No. EN-20-RR-001, Revision 1 - Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in Class 2 and 3 Systems, Section XI, Div 1 (← links)
- 1CAN122001, Responses to Request for Additional Information for the Request for Relief Related to American Society of Mechanical Engineers(Asme) Code Case N-770-5 Supplemental Examination Requirements - ANO1-ISI-034 (← links)
- ML21063A244 (← links)
- 0CAN022101, Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping (← links)
- 0CAN042101, Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description (← links)
- 2CAN052103, Response to Request for Additional Information Related to License Amendment Request to Adopt a Safety Function Determination Program (SFDP) (← links)
- 0CAN072102, Response to Request for Additional Information (Follow-up) - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping (← links)
- 0CAN092101, Unit 2 - Revised Proprietary Demarcation in Response to Request for Additional Information (Follow-up) - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping (← links)
- 0CAN092102, Response to Request for Additional Information License Amendment Request for One-Time Change to Support Proactive Upgrade of the Emergency Cooling Pond Supply Piping (← links)
- 0CAN102101, Final Request for Additional Information Concerning Generic Letter 2004-02 (← links)
- 0CAN022201, Response to the Second Request for Additional Information License Amendment Request for One-Time Change to Support Proactive Upgrade of the Emergency Cooling Pond Supply Piping (← links)
- 0CAN032201, Response to the Request for Additional Information Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (← links)
- 2CAN112104, Response to Request for Additional Information 2 Related to License Amendment Request to Adopt a Safety Function Determination Program (SFDP) (← links)
- 2CAN112105, Response to Request for Additional Information Concerning Relief Request ANO2-RR-21-002 Support the Repair of the Reactor Vessel Closure Head Penetration 46 (← links)
- 2CAN102103, Response to Request for Additional Information Concerning Relief Request ANO2-R&R-012 Support the Repair of the Reactor Vessel Closure Head Penetration 46 (← links)
- 0CAN052203, Response to the Second Round of Request for Additional Information Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (← links)
- 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations (← links)
- 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods (← links)
- 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 (← links)
- 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 (← links)
- 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 (← links)