Pages that link to "WCAP-9272"
Jump to navigation
Jump to search
The following pages link to WCAP-9272:
Displayed 50 items.
- L-2009-116, Cycle 18 Core Operating Limits Report (← links)
- L-2008-148, Report of 10 CFR 50.59 Plant Changes for June 12, 2006 Through April 4, 2008 (← links)
- L-2008-149, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 (← links)
- L-2008-052, Cycle 17 Reactor Startup Physics Testing Report (← links)
- L-2007-183, Cycle 17 Core Operating Limits Report, Rev. 0 (← links)
- ULNRC-05421, Submittal of Core Operating Limits Report (← links)
- L-2019-076, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 (← links)
- NOC-AE-16003351, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies (← links)
- NOC-AE-15003315, Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 20 (← links)
- ML19100A122 (← links)
- L-2006-264, Technical Specification Bases Control Program Periodic Record of Bases Changes TS 6.8.4.j.4 (← links)
- L-2006-128, Cycle 16 Core Operating Limits Report (← links)
- ML19210D642 (← links)
- ML19263B236 (← links)
- ML19302D559 (← links)
- CPSES-200701324, Supplement to License Amendment Request (LAR) 07-003 Revision to Technical Specification 3.1, Reactivity Control Systems, 3.2, Power Distribution Limits, 3.3, Instrumentation, and 5.6.5 B, Core Operating Limits (← links)
- ML19305C957 (← links)
- L-2005-210, Proposed License Amendment Reduce Reactor Coolant System Flow with a Reduction in Reactor Operating Power (← links)
- ML052790692 (← links)
- L-2005-213, License Amendment Pre-application Submittal Implementing 42% Steam Generator Tube Plugging Limit (← links)
- ML052720369 (← links)
- L-2005-103, Cycle 15 Startup Physics Testing Report (← links)
- L-2005-007, Proposed License Amendment Third Request for Additional Information Supplement WCAP-9272 Reload Methodology and WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit (← links)
- ML19320B490 (← links)
- ML19320B065 (← links)
- L-2005-067, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report (← links)
- ML050730385 (← links)
- ML050120363 (← links)
- L-2005-004, Supplemental Information Alternate Source Term License Amendment (← links)
- ML19344E080 (← links)
- ML19341B093 (← links)
- ML19340C291 (← links)
- ML19337A773 (← links)
- ML20006A515 (← links)
- ML20028G489 (← links)
- ML15313A154 (← links)
- ML20052A904 (← links)
- ML20049H646 (← links)
- ML20044A964 (← links)
- L-2020-034, Cycle 25 Core Operating Limits Report (← links)
- ML20041F227 (← links)
- ML20040D897 (← links)
- ML20039C254 (← links)
- L-2004-287, Proposed License Amendment Second Request for Additional Information Response WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit (← links)
- ML042870607 (← links)
- L-2004-193, Proposed License Amendment Request for Additional Information Response WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit (← links)
- ML042590169 (← links)
- ML040900209 (← links)
- ML040300010 (← links)
- L-2003-276, Proposed License Amendment, WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit (← links)