Pages that link to "ML083030243"
Jump to navigation
Jump to search
The following pages link to ML083030243:
Displayed 50 items.
- NLS2015073, Er 15-019, Rev. 0, Pressure and Temperature Limits Report (PTLR) for 32 Effective Full-Power Years (EFPY) (Non-Proprietary), Enclosure 2 (← links)
- NLS2015091, 10 CFR 71.95 Report Involving Energysolutions Certificate of Compliance No. 9168 (← links)
- NLS2015043, Expedited Seismic Evaluation Process Report (← links)
- NLS2018024, Report 004N7680-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR, Coo(Er Nuclear Station Cycle 31. (← links)
- NLS2014087, License Amendment Request to Revise Technical Specifications to Add Residual Heat Removal System Containment Spray Function (← links)
- NLS2014030, License Amendment Request to Delete Condensate Storage Tank as an Alternate Source of Makeup Water (← links)
- NLS2014028, License Amendment Request to Move Linear Heat Generation Rate (LHGR) and Single Loop Operation LHGR Limit from Technical Requirements Manual to Technical Specifications (← links)
- NLS2014035, License Amendment Request to Eliminate Requirements for Post Accident Sampling System for Boiling Water Reactors Using the Consolidated Line Item Improvement Process (← links)
- NLS2014022, License Amendment Request - Revision of Cyber Security Plan Implementation Schedule (← links)
- NLS2013014, License Amendment Request to Revise License Renewal License Condition 2.E (← links)
- NLS2012130, Problem Identification and Resolution P. 1(c) Substantive Cross-Cutting Issue (← links)
- NLS2012040, Enclosure 2, Gnf S-0000-0140-2518-R0-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR - Cooper Cycle 28 (← links)
- NLS2012002, Enclosure 2 to NLS2012002, Core Plant Bolt Stress Analysis Report (Non-Proprietary) (← links)
- NLS2011071, License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a (← links)
- NLS2011026, License Amendment Request for Administrative Revisions to Technical Specifications and to Remove an Expired One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve (← links)
- NLS2010043, License Amendment Request on Non-Conservative Battery Terminal Voltage and Specific Gravity in Technical Specification Surveillance Requirements (← links)
- NLS2010075, Data from Metamic Coupon Sampling Program (← links)
- NLS2010006, License Amendment Request to Correct Power Factor Limit and to Incorporate a Generic Revision in Technical Specification Surveillance Requirement 3.8.1.9 (← links)
- NLS2009084, License Amendment Request for Approval of the Cyber Security Plan (← links)
- NLS2009034, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency and Clarification of a Frequency Example Using the Consolidated Line Item Improvement Process (← links)
- NLS2009010, License Amendment Request to Revise Nonconservative Battery Resistance Technical Specification Surveillance Requirements (← links)
- NLS2008001, License Application Amendment Request for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process and Related (← links)
- NLS2008002, License Amendment Request to Revise Technical Specification 3.7.3, Reactor Equipment Cooling System (← links)
- NLS2008005, Implementation of License Amendment No. 227, Increased Spent Fuel Pool Capacity (← links)
- NLS2008009, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448-A, Revision 3, Using the Consolidated Item Improvement Process (← links)
- NLS2007048, License Amendment Request for a One-Time Exception to the Five-Year Test Frequency for a Single Safety Valve (← links)
- NLS2007032, SSP-07/405-C, Rev. 1, Gardel BWR - Power Distribution Uncertainties, Enclosure 5 (← links)
- NLS2019028, Enclosure 2 - Calculation Package, File No. 1801303.301, Cooper Nuclear Station Core Shroud H3 Weld Evaluation - 2018, Revision 0 (← links)
- NLS2019022, Application for Technical Specifications Improvement to Eliminate Requirements for Hydrogen/Oxygen Monitors (TSTF-447, Rev. 1) (← links)
- NLS2019020, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit Mcpr. (← links)
- NLS2006042, License Amendment Request for Revision of Technical Specification 3.10.1, Inservice Leak and Hydrostatic Testing Operation (← links)
- NLS2006013, License Amendment Request to Update the American Society of Mechanical Engineers Code Referenced in TS Section 5.5.6, Inservice Testing Program (← links)
- NLS2006001, Application for TS Change to Add LCO 3.0.8 on Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (← links)
- NLS2006002, License Amendment Request for a One-Time Extension of Containment Integrated Leakage Rate Test Interval (← links)
- NLS2019040, 3-EN-DC-147, Rev. 5C1, Cooper Nuclear Station Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (Efpy). (Non-proprietary) (← links)
- NLS2005001, License Amendment Request to Revise Technical Specification Definitions of Channel Calibration, Channel Functional Test, and Logic System Functional Test (← links)
- NLS2005035, Application for Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency Cooper Nuclear Station (← links)
- NLS2005037, License Amendment Request to Revise Technical Specifications - Unit Staff Qualifications (← links)
- NLS2005030, License Amendment Request to Delete Temporary Notes from Technical Specifications (← links)
- NLS2005007, License Amendment Request to Adopt Generic Changes to Standard Technical Specifications (← links)
- NLS2009057, Nedc 87-131B, Revision 8, Cooper Nuclear Station, 250 Vdc Division II Load and Voltage Study. (← links)
- NLS2004088, Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports (← links)
- NLS2004122, License Amendment Request to Revise the Required Channels Per Trip System for Primary and Secondary Containment Isolation and Control Room Emergency Filter System Instrumentation (← links)
- NLS2004099, License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio (← links)
- NLS2004076, License Amendment Request, Extend Diesel Generator Allowed Outage Time and Utilize Temporary Fuel Oil Storage Tanks on a One-Time Basis (← links)
- NLS2004051, License Amendment Request, Revised Logic for Reactor Water Cleanup System Isolation, Secondary Containment Isolation, and Control Room Emergency Filter System Initiation (← links)
- NLS2004005, License Amendment Request to Revise Technical Specification 3.4.9 Pressure Temperature (P/T) Curves Figures 3.4.9-1, 3.4.9-2, and 3.4.9-3 (← links)
- NLS2004007, License Amendment Request - One-Time Extension of Surveillance Requirements (← links)
- NLS2003105, License Amendment Request for LOCA Dose Calculation Methodology and Resolution of Remaining License Condition 2.C.(6) Issues (← links)
- NLS2003077, License Amendment Request to Revise Technical Specification (TS) Surveillance Requirement (SR) 3.3.2.1.4 and TS Table 3.3.2.1-1 for Mathematical Symbols and Use of Allowable Values (← links)